The Clean Green Nation Store
http://img176.imageshack.us/img176/8641/cgs7ta1.jpg (http://img176.imageshack.us/my.php?image=cgs7ta1.jpg)
The Clean Green Nation Store
For the future
Introduction
The Green Clean Nation store originally was formed as a consultation company to the Alfegosian Environmental Ministry in the year 2000, when the Millennium Cleanup Project was announced. Soon advancing into the private sector, the company now can serve almost any nation on the globe with high-quality products to help for them to strive towards ecological targets.
The company headquarters are based in New Zevkhay, Alfegos. Multiple distribution centres are spread across Alfegos, Alfegan colonies and friendly nations, to allow for rapid delivery of all products to purchasers.
Details
CEO: Hannah Tri'dai
Treasurer: Ki'lo Mho'ni
Address:
The Clean Green Energy Co.
Unit 5
19, Goldenrod Boulevard
New Zevkhay
Alfegos
P.O. Box 17
Telephone: (+273) 0090 3622 515
Website: www.cleangreen.alf
Turnover: $2,104,668,603,470
Shares: None available at present
Value: $1864.21 per share
Holders:
50 000 CEO
200 000 Mar'ki Ticron
Index:
1 - Power
2 - Transport
3 - Water Pollution Control
4 - Air Pollution Control
5 - Land Decontamination
6 - Fuel
7 - Orbital Resources
Rules:
1 - Do your own mathematics - The store charges a fee of 2% for doing your maths
2 - All purchases must be made within the nation's environmental budget.
3 - All orders must be in character.
4 - Spam will be deleted mercilessly.
1 - Power Generation, Accessories and Factories
A1 - Wind Generators
- "Beaufort" Wind Turbine - $1800
A small wind turbine for household electricity production.
Construction: Standard turbine, Fibreglass
Dimensions: 1.2m x 0.6m x 0.6m
Stand Height: 0.5m
Rotor Diameter: 0.8m
Maximum Output: 5kW
Efficiency: 40 - 80%, depending on location
Wind range: 4 - 7 (Beaufort scale)
- "Gale" Wind Turbine - $60 000, $92 000 offshore, $120 000 deep water
A standard wind turbine unit, producing industrial-scale power. Offshore, a large concrete foundation is used, whilst deep water (>30m) use a large float tethered to the sea bed. Additional warning light systems and advanced blade technology mean that the turbine produces less noise than originally, whilst deterring migratory birds from the blades.
Construction: Standard turbine, Fibreglass & Aluminium
Dimensions: 12m x 5m x 5m
Stand Height: 100m
Rotor Diameter: 60m
Maximum Output: 3MW
Efficiency: 50 - 85%, depending on location
Wind Range: 3 - 9
- "Aeolis" Generation Platform - $200 000
An airborne lighter-than-air wind generation platform, utilising an unmanned B-limp airship holding multiple turbine units. At an operational altitude of 1.2km, the vehicle is exposed to more constant high-speed winds, allowing for a higher level of power generation. Power is delivered via a long cable tether to an adjustable ground platform. Can be mounted offshore, though floating platforms are not provided.
Construction: 5x Turbines (Fibreglass), 1x Airship(Aerofilm/Aerofibre, Helium), 1x Tether Unit (Steel)
Turbine Dimensions: 3m x 1.2m x 1.2m
Rotor Diameter: 10m
Airship Dimensions: 90m x 30m x 20m
Tether Dimensions: 5m x 5m x 2m
Maximum Output: 8MW
Efficiency: 75-95%
Wind Range: 3 - 11
A2 - Wind Farm Packs
- Wind Farm Pack - $220 000 per hectare, $430 000 per dense hectare
4 "Gale" turbine units per hectare, each with an uplink to the mains power grid and a mid-scale battery storage unit. The dense option allows for 8 per hectare. Add 40% to the price if offshore, and 90% if in deep (>30m)water.
Maximal power per hectare: 12MW/24MW
- "Aeolis" Farm - $1 million per hectare
5 "Aeolis" platforms at a high altitude, with the tethers in the hectare area below. The area comes with an uplink to the mains, along with a mid-scale battery storage unit. Farm packs are provided on land only.
Maximal power per hectare: 40MW
- Kite Farm - $95 000 per hectare
The most recent of wind technology development is the kite generator: a large aerofoil of Aerofabric is attached to a one-kilometre cable tether, with the lift provided by wind producing the power. The farm kit uses twenty 200 kW generation units, each tethered to the ground via immobile winding units. The group has its own mains uplink, and mid-scale battery unit.
Kite dimensions: 1.2m x 10m x 0.1cm
Maximal power per hectare: 4MW
B1 - Solar Power Generators
- Home Solar Panel (household size) - $1900
A small home solar panel, designed for rooftop mounting.
Construction: 2nd Generation, Sillicone Matrix
Dimensions: 3m x 0.8m x 0.1m
Maximum Output: 20kW
Efficiency: 40-60%, depending on location
- "Lux" Photovoltaic Cell - $5 500
A power station grade panel unit, designed to accept multiple mounts.
Construction: 2nd Generation, Sillicone Matrix
Dimensions: 6m x 1.8m x 0.1m
Maximum Output: 60kW
Efficiency: 50-65%, depending on location
- "Iris" Photovoltaic Cell - $15 000
A fourth-generation multiple-layer cell utilising three light bandwidth groups to increase possible output from the same area of sunlight. Each panel consists of four gutter-like units placed into a single panel.
Construction: Three level light energy absorber, Silicon/Iridium
Dimensions: 4m x 1m x 0.2m
Maximum Output: 110 kW
Efficiency: 55-65%, depending on location
- "Hyperbol" Solar Intensifier - $8000
A large curved mirror unit designed to track the sun on a mobile stand. Sunlight is focused from the sun onto a secondary reflector, pointing the heat and light through a small hole in the rear of the mirror to an empty mount. This can either be fitted with a heat-electric converter, or other devices depending on customer preferences.
Dimensions: 2.5m x 3m x 4m
Maximum Output: Depends on converter
Efficiency: 60 - 75%, depending on location
B2 - Solar Power Stations
- "Iris" Photovoltaic Station - $1.55 million per hectare
100 Iris panels installed in the station along power conversion units and mid-scale battery storage units.
Maximum Output per hectare: 11MW
- "Hades" Thermal Solar Station - $800 000
Using many mirrors to focus the suns heat onto the central tower, boiling a potassium salt that goes on to heat steam in a turbine generator.
Area covered: 2 hectares
Maximum Output: 30MW
- "Corona" Solar Tower - $4 000 000
A solar updraught tower: tens of thousands of mirrors in this massive complex covering 10 hectares focus heat onto a tower a kilometre high, causing fast winds to be sucked into the tower, turning numerous generators. Only one in existence, producing up 400 MW during a record heatwave. Uses salt technology for heat retention, so that the structure will operate during the night-time for up to 6 hours and will also operate during brief overcast spells.
Area covered: 10 hectares
Maximum Output: 400MW
C1 Sea-based Generators
- "Snake" Wave Generator - $20 000
A long snake-like structure 50 metres long that uses the oscillating energy of the sea to produce 20kW of power. Connected to the mains via long armoured cables. May break in storms.
Construction: Multiple-part plastic floats connected via dynamo links.
Length: 15m x 0.5m x 0.5m
- Tidal Barrage - Prices vary depending on customer preferences
A massive barrage across an estuary produces energy from the rising and falling tides: about 350 MW on an estuary 3km across. A road can be built along the top if necessary, and on the client's wish can be modified as a sea defence or military defensive position as well.
Construction: Poured concrete and steel
Length: xm x 10m x 30m
- Sea Current Buoy - $11 000
Moored in a strong current, the buoy uses an underwater turbine to produce 25 kW of power. Can be made dual-purpose by the client (i.e converted into a marker buoy in addition), for a sum of $500.
D1 - Geothermal Power Generators
- Geothermal Plant - $800 000
Produces about 4 MW by using steam from water pumped near the mantle of the earth to power generators. Most efficient in volcanic regions. Hot water can be piped from the station to local houses, to provide free heating.
E1 - Hydroelectric Power Stations
All orders done on a client-by-client basis, depending on terrain and requested amount of power.
F1 - Power Generation Accessories
Low-scale Battery Unit - $200
A battery of Absorbed Glass Mat cells. Recommended for home generation systems.
Voltage: 240V
Rating: 200 amp/hours
Mid-scale Battery Unit - $8000
A battery of Mk.II Liquid batteries, with a higher uptake/discharge rate than AGM systems and higher capacity. Recommended for small power stations.
Voltage: 1000V
Rating: 16 000 amp/hours
Large-scale Battery Unit - $200 000
A battery of Electrochemical Double-layer capacitors, with an extremely fast charge/discharge rate, recommended for large power stations linked directly to the national grid.
Voltage: 1000V
Rating: 1.6 million amp/hours
G1 - Factories
- Biorefinery - $600 000 *Designed by Commonmilitirism*
Using the yeast vats, wheat as well as waste can be converted into ethanol, and refined to very high levels of quality for use in vehicles.
In addition, the algae vats based in the factory can be used to produce oil compounds normally used in the plastics and cosmetics industry, reducing the need for oil further. The algae is fed carbon dioxide form the factory chimney, so carbon dioxide emmisions are reduced.
- Algae Hydrogen Generation Plant - $300 000
Strain A678C511 algae is converted, so that instead of producing water as a waste product it produces water and hydrogen. Each plant covers 5 hectares, and is able to produce 500 m^3 of hydrogen per hour.
Area covered: 5 hectares
Product: 500m^3 Hydrogen per hour
- Anaerobic Digester - $2 000
Used to produce methane gas, any sort of organic matter can be placed in the digester. Methane is piped off the top of the unit, at a rate of 10 m^3 an hour. A basic heat exchanger is also included as an optional extra for $200, if heated water is required from multiple units.
Dimensions: 2.5m x 2.5m x 5m
Product 2m^3 Methane per hour
2 - Transport
A - Cars
- LPG Conversion - $3600
The vehicle is converted to use Liquefied Petroleum Gas, a mix of propane and butane kept as a liquid under high pressure and low temperature. The replacement involves the insertion of larger fuel canisters, the changing of fuel hoses and valves, and the retuning of the engine to suit the fuel. Whilst running with much less knocking (108 EOR), the fuel has only 80% the efficiency of Petrol energy-wise, and the tanks require cryogenic equipment. Not recommended for use in hot climates.
- Ecogas Conversion - $3200
Ecogas is methane produced from the decomposition of organic matter in anaerobic digestors. With an even cleaner burn than LPG, the fuel is also carbon-neutral. Compression of the gas to convert it to liquid means thicker cylinders have to be used to transport the fuel, yet no cryogenic equipment is needed. Fuel tank size is approximately the same as a normal car, with pressures of 250 bar typically being used. Efficiency is only 60% of petrol per volume, but compression means that roughly the same range is produced. The same changes are provided for Ecogas conversion as LPG, though differing tuning and components mean the two fuels are not interchangeable.
- Hydrogen Combustion Conversion - $4900
With the lowest amount of energy per volume of all fuel gases, hydrogen needs to be stored at very high pressures to achieve reasonable range. Storage tanks extend into the trunk of the vehicle, with pressures of up to 280 bar being used to store the gas in palladium-lined tanks. However, hydrogen produces only water and some NOx in its exhaust, providing an amazingly clean burn, and can increase the overall power of the engine considerably compared to petrol. Price is high due to the palladium used in the construction of the linings of the vehicle, yet overall fuel price is still lower than equivalent-grade petroleum, allowing for the vehicle to 'pay for itself'.
B - Buses
- Fuel Cell Conversion - $35 000
The entire bus is converted to use Hydrogen fuel cells. This involves the complete removal of the engine unit for an electrical engine, and the conversion of fuel tank area to take large fuel cell units storing hydrogen. The bus can be recharged both by the replacement of hydrogen and the running of an electric current through the cell. Range is affected, but the bus runs completely silently without any production of carbon dioxide.
- Ecogas Conversion - $7200
The bus is converted to run on Ecogas, as with the car. Extra fuel tanks are used in the rear of the bus, providing similar range at the loss of some baggage space in the rear of the vehicle.
- LPG Conversion - $7600
The bus is converted to run on LPG, as with the car.
C - Boats
- Fuel Cell conversion - Depends on vessel
The vessel is converted to use large fuel-cell batteries, the turbine being ripped out in place of an electric motor. A very high price, but at the consequence the vessel is nearly silent, and produces no carbon dioxide.
- Ecogas Conversion - Depends on vessel
The vessel is converted like a car to run on Ecogas. This is more expensive depending on the fuel used aboard the ship: if fuel oil is used, then the engine will be completely removed in place of a new gas turbine, raising prices substantially. Ecogas allows for vessel engines to last for longer, and for the vessel to move at higher speeds. The consequence is that the vessel has a shortened range.
- Hydrogen Combustion Conversion - Depends on vessel
Similar to the Ecogas, except in the range being shorter, the potential speed being higher and the cost being higher.
D - Locomotives
- Fuel Cell Conversion - $80 000 Electric, $220 000 Diesel
The locomotive is converted to use fuel cells, charged either by hydrogen at stations or by electrical charge. Able to use both electrified tracks and normal tracks, though range is shorter compared to a diesel locomotive.
- Hydrogen Combustion Conversion - $210 000 Electric, $78 000 Diesel
The locomotive engine is converted to run on hydrogen. This provides a much higher potential speed and power compared to normal diesels, though range is shorter.
E - Commercial Aircraft
- Ecogas Conversion - $25 000
The aircraft wings are filled with the compressed gas containers where space is available, with cylinders also included inside the fuselage. Some space may be taken, and range is reduced. However, the fuel is carbon neutral and can reduce engine noise.
3 - Water
A - Output Control
- Factory-Outlet Filter - $15 000
As well as filtering common pollutants such as Nitrates, this unit also filters out mercury and other metals, and cools the water down to stop thermal pollution
- Sewerage outlet plant - $32 000
If your nation's sewerage processing is woefully inadequate, and pollution still occurs, this unit is perfect.
A large system, able to handle up to 14 000 litres a day, filters rubbish out, removes sediment and digests them, before sterilising it. Comes with a 5-star rated 3-level extraction system, that allows the sludge to be removed and bagged as fertiliser.
- Artificial Wetlands - $28 000 per hectare *Designed by Commonmilitirism*
For less polluted waterways, and for factory outlets that don't release toxic chemicals. Uses rushes and other water plants to filter the water. Provides an ideal home for rare wetland species, so can constitute a tourist attraction in the area.
B - Decontamination
- Water De-acidification Barge - $100 000 per year
If acid rain blights your nation, this may help. This barge releases alkaline substances into the water, neutralising it to its original pH. Intended to treat most lakes or river sections up to 50 miles.
- Water Decontamination Barge - $600 000 per year
The decontamination barge uses a four-stage system to clean a waterway. First, water is sucked into the unit alongside sand dredged up from the bed of the river or lake, with large pieces of rubbish filtered out on a constantly-emptied grate. The second stage uses a centrifuge to separate all matter from the water, in which the water is also supplied with additional oxygen. The third stage uses chemicals to eliminate common toxins from the water and slurry, which is passed through a secondary vibrating filter to separate the sand from any other items. The final stage sees the sand dumped back on the river bed after passing through a second filtration, with the water having the chemicals used in cleaning filtered out/neutralised before clean water is passed from the rear.
4 - Air Pollution Control
A -Output Control
- Factory Air stack filter - $28 000
Uses electrostatic plates in combination with chemical filters to remove particulate matter, sulphur dioxide, hydrocarbons, heavy metals and nitrous oxides. Percentage removed varies depending on exhaust gases, between 40% and 90%.
- C02 Trap - $40 000
Lime water is used to clear up to 80% of carbon dioxide from the chimney gases, producing Calcium Carbonate as a result. This can be further processed into Calcium Sulphate (Gypsum) for the construction industry.
B - Decontamination
- Anti-smog Air Processor - $180 000
A small structure that uses a large fan to suck in air, which is then filtered of pollutants before being ejected clean at the other end. Can clear up to a 200 metre radius of smog. Not recommended for use in areas where factory filtering is not considered to be introduced.
5 - Land Decontamination
A - Pollution Clean-up Service
- Grade V - $5000 per hectare
*At least one piece of non-toxic rubbish per square metre.
*Minor presence of soil toxins.
*Loss of sensitive species.
- Grade IV - $15 000 per hectare
*Presence of minor amounts of hazardous waste
*Raised level of soil toxins
*Loss of hardier species
- Grade III - $65 000 per hectare
*Presence of moderate amounts of hazardous waste
*Unsafe level of soil toxins
*Retention of only the hardiest species
- Grade II - $110 000 per hectare
*Presence of high amounts of hazardous waste
*Very high level of soil toxins
*Few multi-cellular organisms
*Respirators necessary
- Grade I - $300 000 per hectare
*Presence of extreme amounts of hazardous waste
*Extreme levels of soil toxins
*Only bacterial spores can survive
*Full NBC suits necessary
B - Pest Control Service
- GM Designer virus pesticides - $500 000
A virus is used to infect and destroy destructive non-native species in an area. If not mentioned below, will be commissioned for an additional 50% cost.
Rats (all species), Mice (all species), Feral pigeon, Cockroach (all species), Silverfish, Rust mites (Original strain), Bluebottle, Greenbottle, Mosquito, Tsetse fly, Carpet beetles, Japanese Knotweed, Ragwort
6 - Fuel
- Ethanol - $0.55 per litre
Due to company concerns to current "biofuel" trends, no biodiesel or biopetrol is stocked. Instead, the Ethanol stocked is produced from enzyme-based decomposition of cellulose. The ethanol is provided pure, so may need mixing with diesel or petrol to allow for use in most vehicles. Since power provided per litre is lower than standard petrol, it is not recommended for use in high performance vehicles.
- Ecogas - $0.45 per litre
Ecogas is a 90% Methane gas mix designed for replacement of standard natural gas. Whilst burning extremely cleanly in the engine (with very little soot produced), energy levels are lower per litre than with petrol. The methane is produced via the digestion of sewerage, farm waste and landfill by bacteria.
- Hydrogen - $0.70 per litre
Produced from GM algae and electrolysis of water, hydrogen is a powerful fuel with the highest energy-to-mass ratio of any gas. However, density issues mean that it has to be stored in high-pressure cylinder units. Can either be run through fuel cell systems (recommended for low performance cars), or be run directly through an internal combustion engine with modifications (recommended for high performance cars). The high price is due to the infancy of current Algae technology.
7 - Orbital Resources
Power Generation
- "Sol" Solar Power Station - $3.5 million per 100 m^2 of panels
This satellite is designed to use a Geosynchronous Orbit near the poles of the planet to capture sunlight, which is then transmitted to a receiver station using a MASER beam. The satellite uses the IRIS solar cell technology to convert 80% of all light that falls on the solar panels in electricity, fed into the main processing core that forms the heart of the satellite.
The satellite uses 16 rockets fed by compressed nitrogen to correct its orbit, meaning that it may have to be refuelled every decade to maintain orbit.
The average output of the solar panels provided per 100 m^2 is 2.7 MW.
Price does not include launch.
- Energy Receiver Station - $4.5 million
Using one massive receiving dish and large-scale power reconversion systems that cover an area of about 12 hectares, the energy receiver station is designed for use with the Sol satellite. The receiver is fully able to angle from 10 degrees to 90 degrees, and can track satellites if needs be.
Comes with a radio transmitter for the satellite to continuously make sure that the energy is focused only on the dish, so that no damage occurs to surrounding areas in case of atmospheric disturbance.
Orbital Clean-up
- Orbital Clean-up Satellite - $3 million
This satellite uses an array of systems on-board to actively track space junk in its orbit, and uses magnets and a large series of rocket boosters aboard the vehicle to collect and store up to 200 m^3 of debris, which it then compacts into a single package and fires back towards the earth over the middle of the ocean near no shipping routes and at least 500km away from land. Needs refuelling every 4 years, but can work almost autonomously.
Launch not included.
Vanek Drury Brieres
19-09-2007, 20:59
Dear Clean Green Nation Store,
The government of the VDB wishes to purchase the following items:
100,000 tons of Carbon-Neutral Concrete for 5 USD
50,000 Household Wind Turbines for 40 billUSD
5 Solar Towers for 40 billion USD
50 hectacres of Thermal Solar Stations for 6 billion USD
82,000,000 Hydrogen Fuel-Cell Modification for 41 billion USD
1,000,000 hectacres of Landfill Cleanup for 200 million USD
4,000 Anti-smog Air Processor for 320 million USD
41 Factory-Outlet Filter for 49,200,000 USD
21 EF Insulation for 1,680 USD
Total Order: $131,569,201,490 USD. Money will be wired on confirmation of order.
Signed,
The Princes of the VDB
OOC: I use NSDossier figures. I used up all but 223 dollars.
The order has been accepted! Expect the fleet of cargo ships and our expert technicians to help set up and cleanup within a week!
Greal would like to buy
1 million Biofuel Buses for 1.9 billion
reason: Our cities, espceially Sasha, needs buses that cannot pollute the air.
100,000 Wave Generators for 1 billion
Reason: Greal needs for power for the west coast.
total cost: 2.9 billion
Vandaheim
20-09-2007, 14:25
Greetings,
The Government of Vandaheim, in a commitment to environmental responsibility, is interested in purchasing your products.
We would like:
10 Million Solar Panel Kits - 8 Billion
10 Million Household Wind Turbines - 8 Billion
5 Million Fuel Cell Bus Conversions - 10 Billion
20 Million Fuel Cell Car Conversions - 10 Billion
10,000 Factory Water Outlet Filters - 12 million
10,000 Sewage Outlet Plants - 120 million
Contract for 40 Water De-Pollution Barges for 20 years to clean up Mara Bay -
32 million
10,000 Factory Airstack Filters - 120 million
10,000 Anti-Smog Processors - 800 million
Full amount of 37.084 Billion USD to be paid upon confirmation.
We would also like to buy the Domestic Production Rights for Carbon Neutral Cement.
Thank you,
Rainbow Rheyes
Director
Vandaheim Department of Environmental Responsibility
Van Luxemburg
20-09-2007, 15:35
(OOC: I'm not an expert on the other themes, but your transport range prices are too low. $500 for a hydrogen fuel-cell modification is hardly possible, since in RL, the installation of an LPG tank and the required modifications costs $3000 already, and since Hydrogen technology is a whole lot more complex, it would cost a whole lot more. You would need to design a completely new engine (since the old one isn't designed to run on hydrogen) or you would need to modificate the old engine in such a way, that developing a new engine would be way cheaper to realise. Plus, hydrogen technology is expensive, which will probably make it cost more than $50,000 (realise that the BMW Hydrogen 7 has got a speculative worth of $2 million USD, when counting the research. In Material cost, it is worth $500,000.)
A Hybrid conversion is probably cheaper than a hydrogen conversion. Not more expensive. Buses don't cost $2000, even if it is just a hydrogen modification. For a new bus, you're looking at prices of around $900,000 when buying a complete hydrogen bus new. Conversions are, once again, very expensive. Biofuel conversions would also cost more, when it is a petrol engine. Diesel engines have less problems with running on biofuels (in fact, biofuels are already slowly being mixed into diesel for trucks and cars right now).
Just my two cents. Anyways, good luck with the storefront! ;)
Accepted: Your Orders are being shipped out via conatiner ship, and by heavy plane transport.
Our personnel will be arriving shortly.
(OOC: Thanks Van Luxenburg for the advice)
We wish to purchase 400,000 hydrogen fuel cell conversions please
The bill for 5.6 billion has been charged to your account.
Bredford
20-09-2007, 17:20
To: Clean Green Nation Store
From: Elizabeth Merla, Bredford's Enviroment Minister.
Our nation would like to establish a 'green houses' program in our country for 50 million people.
a 'green houses' program means 50 million Prefabrication houses (with three extra bedrooms) with ET Insulation for each, also, 50 million Household Wind Turbines, and Biofuel conversion for 50 million cars.
Total Cost- $1,544,000,000,000 ($1.544 trillion NS$)
the program shall be streched over eight years, and will contain yearly payments of $200 billion NS$.
(OOC: to be more precise, its 7.72 years.)
Also, we would you to consider buying corn-based Ethanol from us (we have it in handy.)
We hope you approve our program,
Elizabeth Merla, Bredford's enviroment minister.
Firstly, your order has been accepted, and the ships containing the structures will be arriving shortly at your ports.
Secondly, we wish to enquire as to the price of Ethanol from your nation: our nation charges $0.60 per litre of Biofuel, after tax.
Bredford
20-09-2007, 18:12
Firstly, your order has been accepted, and the ships containing the structures will be arriving shortly at your ports.
Secondly, we wish to enquire as to the price of Ethanol from your nation: our nation charges $0.60 per litre of Biofuel, after tax.
To: Clean Green Nation Store
From: Morgan Ethanol Inc.
Morgan Ethanol Inc. would like to export you litre of Ethanol for $0.45.
we are offering you contract of twelve million litres of Ethanol yearly for $5,400,000.
Thank you and good day,
Venek Morgan, CEO of Morgan Ethanol.
Vandaheim
20-09-2007, 21:06
We would also like to buy the Domestic Production Rights for Carbon Neutral Cement.
Thank you,
Rainbow Rheyes
Director
Vandaheim Department of Environmental Responsibility
OOC: What was the price for the DPR?
We are willing to sell DPR for the concrete at a price of $5 million. We will help set up the facilities for the production.
Vandaheim
20-09-2007, 21:40
The Government of Vandaheim will gladly pay 5 million for the DPR. We thank Alfegos for their assistance in setting up the facillity.
Thank you
Rainbow Rheyes
Director
Vandaheim Department of Environmental Responsiblity
Shock! Horror! You Guessed What It Is...
Bump!!!
To: CEO Hannah Tri'dai,
The Clean Green Nation Store
From: Mar'ki Ticron,
DMI - Dominion
Subj: Stock
Greetings,
I have happened upon your store and delighted to see a company of this nature attempting to prosper on the international market. However, it is the stock listing that I write to you about.
I wish to purchase all remaining shares of stock if this is possible. I cannot, however, tell if that is 150,000 shares or 200,000. Whatever, the number the correct funds will be wired if you accept.
[$279,631,500 if 150,000 Shares]
[$372,842,000 if 200,000 Shares]
[Signed]
Mar'ki Ticron
CEO of DMI
There are 200 000 on the market: and we are willing to sell them to your nation.
Blackhelm Confederacy
23-09-2007, 19:45
A Special Message From The Griffincrest Corporation
*A gorgeous Lamboughini drives through a lush green forest as a female voice speaks*
Global warming is only a myth, a myth which we at the Griffincrest Corporation seek to end. Without oil, cars such as this would cease to exist, and many methods of transportation would soon be lost.
*Scene changes to forest fires, sick children, hurricanes, and riots*
The vehicles used by today's first responders would become seen as not friendly to the environment, and taken away. The result would be chaos.
*Birds chirping in a forest appear and a truck with the Griffincrest logo appears. Men wearing Griffincrest uniforms can be seen around the truck planting trees*
For every dollar that Griffincrest makes, a percent of that is given back to the environment, and another part goes to help feed starving children.
*Claudius Griffincrest appears on screen seated in his office and speaks*
So remember people, go Griffincrest, if not for you, do it for the environment and the children of the world.
*Griffincrest logo fills the screen and a deep voice speaks*
This has been a public service announcement
*Screen goes blank*
Commonalitarianism
24-09-2007, 03:57
Good evening,
This is Boris Cruonis from the Ecotechnic Institute we are interested in offering some technology for your perusal. We can construct Artificial Wetlands for wastewater treatment, biorefineries from biomass feedstocks that produce biopolymers, pet food, personal care ingredients, ethanol and other biofuels, and green chemistry products. We believe biorefinery technology, living machine technology, green chemistry bioreactors may further your goals. We are interested in licensing this technology to Alfegos.
Regards,
Boris Cruonis, Principal
There are 200 000 on the market: and we are willing to sell them to your nation.
To: CEO Hannah Tri'dai,
The Clean Green Nation Store
From: Mar'ki Ticron,
DMI - Dominion
Subj: Stock
Splendid!
I wish to purchase all remaining shares of stock. The two hundred thousand shares [200,000], valued at $1864.21 per share, come to a grand total of $372,842,000. This money will be wired immediately from my personal account.
The listing should be placed under Mar'ki Ticron, not DMI or the Dominion. I have acquired these shares with my personal assets.
One last question, however, is whether the two hundred fifty thousand [250,000] shares owned by the two of us are the total number of shares or are there more unlisted?
[Signed]
Mar'ki Ticron
CEO of DMI
TO: DMG
Your request has been accepted.
TO: Commanmilitirism
We wish to enquire as to the production rights for the prodcuts you have offered us.
Commonalitarianism
24-09-2007, 17:12
We are going to ask $20 million for the rights to produce a cellulosic, and hemicellulosic biorefinery. This uses feedstocks from plant, animal, agricultural, and municipal wastes. The plant we are describing would produce annually, 20 million gallons of ethanol, 60,000 tons of lignin, 12,000 tons of gypsum, 20,000 tons of yeast. Unfortunately, it would also produce 70,000 tons of carbon dioxide which would be processed and stored. We would recycle the carbon dioxide to grow algae which would be fed into the process again to make more biofuel.
We are going to ask $3 million dolllars for the rights to produce Artificial Wetlands.
Regards,
Boris Cruonis, Principal
OOC: We would use the Greenfuel Technologies method of carbon mitigation to create additional feedstock for the plant. http://www.greenfuelonline.com/technology.html . The method we are using comes specifically from Bluefire Ethanol. http://bluefireethanol.com/technology/
We are going to ask $20 million for the rights to produce a cellulosic, and hemicellulosic biorefinery. This uses feedstocks from plant, animal, agricultural, and municipal wastes. The plant we are describing would produce annually, 20 million gallons of ethanol, 60,000 tons of lignin, 12,000 tons of gypsum, 20,000 tons of yeast. Unfortunately, it would also produce 70,000 tons of carbon dioxide which would be processed and stored. We would recycle the carbon dioxide to grow algae which would be fed into the process again to make more biofuel.
We are going to ask $3 million dolllars for the rights to produce Artificial Wetlands.
We accept your offer: the money has been wired.
We thankyou for doing business with us.
===
To: DMG
The only stocks there are are the one we both own.
We thank you for doing business with us.
Karshkovia
24-01-2008, 20:13
OOC: would a nation be able to spend part (not all as I RP that at least 1/3-1/2 my budget pays for upkeep of equipment, and soldier's pay) of it's defense budget if they were looking to go completely green. I want to turn my nation more into the ever passive/neutral swiss-like people so a small, effective military is all I need. Do you happen to have any satellites for solar radiation collection and redistribution in the works? Do you accept payment from grants that were given from large nations? Karshkovia was granted $1 trillion Universal Standard Dollars recently by the Communist nation of Stoklomolvi (http://forums.jolt.co.uk/showpost.php?p=13359191&postcount=94) and has over 900 billion left over for use in rebuilding its space program, though I was very swayed by the idea of going green. If I made a purchase, I may be looking at 500-600 billion total expenditures for the space program and 300-400 billion left over for use in going green.
Thanks in advance
(OOC: Yes, that will be coming sometime soon. As for your request, I will allow it since you have explained to me your reasoning. The solar satellites along with other updates will be available for viewing on the main page once I have come back from a meeting, at about 20:30 GMT)
(Right, the edit was unsucessful since the meeting overran, but when you say go green, do you want to completely remove your reliance on fossil fuel or nuclear power?
For your benefiry, I will calculate the best packages for you, if you can give me the following information:
- Climate
- Tectonic activity
- Average amount of electricity consumed (in GW per hour)
- Number of private vehicles
- Number of public transport vehicles
As for a space-based system, that may be coming soon: whenever I have time)
Karshkovia
24-01-2008, 23:25
(Right, the edit was unsucessful since the meeting overran, but when you say go green, do you want to completely remove your reliance on fossil fuel or nuclear power?
For your benefiry, I will calculate the best packages for you, if you can give me the following information:
- Climate
- Tectonic activity
- Average amount of electricity consumed (in GW per hour)
- Number of private vehicles
- Number of public transport vehicles
As for a space-based system, that may be coming soon: whenever I have time)
OOC: yes we would go completely green and remove all reliance on Fossil Fuels and Nuclear Power. We only sell unrefined uranium from our mines for non-weapons programs to other countries.
Climate/Geography:
(Map of Karshkovia (http://myweb.cableone.net/bschott/Karshkovia_files/relief2.jpg))
With an area of 2.7 million square Kilometers (1.05 million square miles), Karshkovia shares large boarders of 6,846 kilometers with it's northern neighbor nation, 2,203 kilometers with it's western neighbor nation, and 379 kilometers with it's northeastern neighbor.
The Karshka Steppe, with an area of around 804,500 square kilometers, occupies one third of the country. The Steppe is characterized by large areas of grassland suitable for fair agriculture, with very fertile soil. The steppe is nicknamed "The green desert".
Important rivers include the Volga, the Krona, the Vyehegda and the Severnaya.
The country's only lake is Lake Trysh averages between 2 and 3 miles (3-5 km) in width and is 6 miles (9 km) wide at its widest point, and it empties into the river Trysh. The Rion Dam iis an earth embankment dam on the Trysh River located at the start of the river. Hydroelectric turbines at the dam have a generating capacity of 515 megawatts of electricity. Their average production is 240 megawatts, enough for several hundred thousand people.
The Rion Dam National Fish Hatchery is the world's largest walleye and northern pike producing facility and also works to restore endangered species, such as the pallid sturgeon which are poached for their eggs.
Facts:
* Maximum water storage: 23.8 million acre feet (29.4 km³)
* Maximum water depth: 180 ft (55 m) at the face of the dam
* Normal surface area: 307,000 acres (1240 km²)
* Normal length: 178 mi (286 km)
* Normal shoreline: 1320 mi (2120 km)
The eastern part of the country consists of the flat, Severnaya Valley, the bottom of the prehistoric glacial Lake Malov. It's fertile soil, drained by the meandering Severnaya River flowing southward into the Bay of Barnaul, supports a very large agriculture industry.
The western half of the state consists of the Karshka Mountains and "Badlands" just at the foot of the Karshka Mountains. The nation's highest point is Mount Vyoska, rising an impressive 5541 meters above sea level. The "Badlands" are abundant in fossil fuels, including crude oil (sweet and light sweet), and lignite coal. The Karshka mountains are abundant in mineral deposits including Gold, Silver, Manganese, Chrome Ore, Iron, Nickel Cobalt, Copper, Molybdenum, Lead, Zinc, Bauxite, and Uranium. All are found in rich, available quantities.
Karshkovia endures temperature extremes characteristic of it's continental climate, with hot summers and cold winters. The record low and high temperatures are -51.1°C and 49°C respectively. Meteorological events include rain, snow, hail, blizzards, polar fronts, tornadoes, thunderstorms and high-velocity straight-line winds.
Springtime flooding is a relatively common event in the Severnaya Valley, due to the Vogla and the Vyehegda emptying into the Severnaya. The spring melt and the eventual runoff typically begin swelling the rivers, taxing the Severnaya.
In the foothills of the Karshka Mountains, Geothermic activity is present with many hot springs and geysers used for recreation and relaxation. Earthquakes in the south-east are not common but are weak when they occur.
Average amount of electricity consumed
397.99 billion kWh per year
Number of vehicles
Number of Motor Vehicle Registrations by Vehicle Type for 2005 in Karshkovia:
Publicly Owned Automobiles 692,522
Private and Commercial Automobiles 23,340,945
Publicly Owned Buses 431,955
Private and Commercial Buses 317,593
Publicly Owned Motorcycles 40,898
Private and Commercial Motorcycles 862,158
Publicly Owned Trucks 857,770
Private and Commercial Trucks 29,987,541
Total numbers (including vehicles for sale in automotive dealerships) = 56,592,382
We would be interested in a complete revamp, and are very interested in the " Sol" Solar Power Station and Energy Receiver Station options.
The Free Republic wishes to purchase the "Sol" Solar Power Station (3 million NS Standard Dollars), and the Energy Receiver Station (4 million NS Standard Dollars) for use to power our national capitol and the surrounding environs. Our national capitol of Nephi is surrounded by mountains, so this type of power plant would allow us to open up space to place more homes in Nephi.
7 million NS Standard Dollars will be wired to your account upon confirmation of this order, and we would also like to enquire about the price of a launch of the Sol Solar Power Station.
Karshkovia
25-01-2008, 09:49
correction to my earlier post:
It looks as if my space program is going to cost about 340 Billion to start up and run due to some helpful nations. Thus I have 560 Billion left over for going green and if needed I can spend 1/2 my defense budget for the next three to five NSyears and all my economy budget to go green.
Quote from the Store:
Amount of energy used: 45.43 GW per hour
Best selection for the upgrading of your nation to Green energy:
- Dense wind farm, 4000 Hectares: 160 GW/h variable*, $520 million
- 10 Geothermal stations: 110 MW/h constant, $30 million
- 4000 Beaufort household Wind-turbines: 200 MW/h variable, $3.2 million
- 18 "Boundary" Hydroelectric dams: 720 MW/h constant, $36 million
- Hydrogen Update**: for 220 fossil-fuel stations, up to 4.2 GW/h constant, $880 million
TOTAL: 5.03 GW/h constant, 160.2 GW/h variable
COST: $1.4692 billion
*Note that the variable means that the power output varies between 0 and the given value. 4x the amount necessary are sold so that there are no catastrophic losses of power.
**This means that your existing stations will be converted to run on hydrogen gas, which will be provided from biorefineries that can supplement your demand for oil in plastics.
(Note: the rest of the stuff for your vehicles and for the factories will come once I find my calculator: I honestly can't do those calculations for you in my head, and the stuff provided on windows is pretty useless.)
To: Lamoni
Order received. Note that we do not have the facilities to launch the satellites, so you will have to launch it yourself.
The satellite has been dispatched along with an expert team of construction workers and materials to construct the ground receiver and ensure complete safety.
Karshkovia
25-01-2008, 23:38
Quote from the Store:
Amount of energy used: 45.43 GW per hour
Best selection for the upgrading of your nation to Green energy:
- Dense wind farm, 4000 Hectares: 160 GW/h variable*, $520 million
- 10 Geothermal stations: 110 MW/h constant, $30 million
- 4000 Beaufort household Wind-turbines: 200 MW/h variable, $3.2 million
- 18 "Boundary" Hydroelectric dams: 720 MW/h constant, $36 million
- Hydrogen Update**: for 220 fossil-fuel stations, up to 4.2 GW/h constant, $880 million
TOTAL: 5.03 GW/h constant, 160.2 GW/h variable
COST: $1.4692 billion
*Note that the variable means that the power output varies between 0 and the given value. 4x the amount necessary are sold so that there are no catastrophic losses of power.
**This means that your existing stations will be converted to run on hydrogen gas, which will be provided from biorefineries that can supplement your demand for oil in plastics.
(Note: the rest of the stuff for your vehicles and for the factories will come once I find my calculator: I honestly can't do those calculations for you in my head, and the stuff provided on windows is pretty useless.)
Response from Karskovia:
The quote is acceptable though we would like to add ten Biorefineries so we can supplement our demand for oil in plastics if not eliminate it, and ten GM Algae Plants to balance our biorefineries. We also would like to look into the Sol satellite (4 to be exact) and the Receiving station (3 would be nice. We would put two satellites in orbit and have two receiving stations to service each satellite. A third receiving station would be used as a back up facility due to damage or maintaince of one or both of the other stations, then in the future be used full time if a third satellite is needed. The fourth would be on reserve in case of permanent failure of one of our main satellites.
We also would like to add Twenty (20) Sea Current Buoys for our naval base on a small island just south of our boarders and two floating submarine bases on our south eastern borders.
If we were to modify all cars, we would like to see what Hydrogen Fuel-Cell Modification would cost compaired to a Hybrid Conversion with Biofuel/electric.
We would need 30,000 Fuel-cell boat conversions for our civilian craft, 5,000 Biofuel Plane Modifications, 10,000 Factory-Outlet Filters, 1000 Sewerage outlet plants, 100 hectares of Artificial Wetlands, 10,000 Factory Airstack filters, 100 Anti-smog Air Processor , 500 hectares of Landfill cleanup.
If you could add that to the final quote as well, I would greatly appreciate it.
QUOTE
Vehicular Conversion
If using Hydrogen Fuel Cells
$792 293 348 000
If using Biofuel+Hybridisation Conversion
$396 146 674 000
Please select your preferred conversion method, so that a final quote can be calculated for you.
The Commonwealth of Tazford
Office of Infrastructure
Hon. Lee Powell
The Commonwealth of Tazford would like to order 100,000 Solar kits for a pilot program, with the potential for more in the future. Please invoice for $80,000,000 which will be wired to the appropriate parties once the inventory has arrived.
Thank you.
Hon. Lee Powell
Karshkovia
27-01-2008, 18:04
The Biofuel+Hybridisation Conversion is perfect and fits well for my budget! Let us go with that.
Right then...
FINAL QUOTE
- Power Grid Upgrade: $1 469 200 000
- Vehicular Upgrade: $396 146 674 000
- Extra Products:
*30 000 x $8000 = $240 million
*5000 x $210 000 = $1.05 billion
*10 000 x $1200 = $12 million
*1000 x $12 000 = $12 million
*100 x $8000 = $800 000
*10 000 x $12 000 = $120 million
*100 x $80 000 = $8 million
*500 x $2000 = $1 million
*20 x $1100 = $22 000
Subtotal - $1 443 822 000
- 4x Sol + 3x Receiver stations = $24 million
TOTAL : $399 083 696 000
TO: Tazford
The ordered products have been sent to you.
100 000 x $800
= $80 million
Karshkovia
27-01-2008, 21:12
your quote is accepted and the total amount has been wired to your account.
Thankyou for your custom!
Vault 10
28-01-2008, 12:56
OOC:
Some of your prices seem to come from a randomizer or miss a few zeros... $800 for a 400kW solar array - ??? For a 400kW system, $800 won't buy you even 20 feet of cable, that simple. As far as solar cells go, it can't nearly buy a single kilowatt.
You can take a look at cheap solar panels here -
http://store.solar-electric.com/hiposopa.html
http://www.partsonsale.com/
http://www.google.com/search?ie=UTF-8&oe=UTF-8&sourceid=navclient&gfns=1&q=solar+cells+lowest+prices
In other words, your price on that item is 1000 times lower than in the real world. That is too much of a stretch.
On other generators, costs are also unrealistically low, as much as 10 to 400 times lower. For reference, I'd put the cost range for solar and wind power as $1000-$3000 per kilowatt (or $1-3 per watt).
At the same time, fuel cell powered bus costs ridiculously much - more than a locomotive, though really locomotives cost 5 million (simple) to 50 million (Shinkansen), 50-100 times more than a bus. The locomotive should cost like 12-20 million, the bus like 200-250 thousand. And biofuel diesels aren't even different from normal ones in all but fuel system.
I'd suggest to research and think out the prices more carefully.
This is just an advice.
Karshkovia
30-07-2008, 16:45
(bump for the store. I like the idea!)
Store now reopened, with prices changed to reflect new research and products added/removed in line with new store policies. Enjoy!
рему - Для зеленой энергии!