NationStates Jolt Archive


Silver Javelin: Maglev manufacturing services

Alfegos
16-09-2007, 10:10
http://www.bkiusa.com/Images/Planning%20Photos/Maglev.jpg

Silver Javelin Maglev Transport Incorperated

CEO: Boris Jal'soi
Treasurer: Yvonne Ni'dai

Silver Javelin (EST. 1993) is a corporation that constructs Maglev trains, carriages, and track systems in its numerous plants across Alfegos, and acts as a maintenance for Maglev networks.

We have an excellent safety record, with only 1 accident to date, in which all the passengers survived.

Silver Javelin manufactures trains and carriages on custom order, for any gauge of track, and with many ranges of price and performance.

Discounts:
FWA - 10%
Nova - 10%
Hegemony - 10%
Allies - 10%

(NB: discounts do not stack)

=====

Products on offer:

Peregrine ultra-speed class:
- Top speed: 410 mph (theoretical)
- Average lifetime: 20 years
- Power system: Overhead/track
- Capacity: 40 passengers
- Control: Automated
- Cost: $320 000

Mercury city class:
- Top speed: 210 mph
- Average Lifetime: 20 years
- Power System: Overhead/Track
- Capacity: 80 passengers per unit
- Control: Automated OR Manual override
- Cost: $200 000 per unit

Pilum city class:
- Top speed: 198 mph
- Average Lifetime: 20 years
- Power System: Overhead/Track
- Capacity: 90 passengers per unit
- Control: Automated OR Manual override
- Cost: $220 000 per unit

Hermes city class:
- Top speed: 180 mph
- Average lifetime: 25 years
- Power system: Onboard hydrogen fuel-cells
- Capacity: 85 passengers per unit
- Control: Manual
- Cost: $190 000 per unit

Lightning ultra-speed class:
- Top speed: 350 mph
- Average lifetime: 15 years
- Power system: Overhead/track
- Capacity: 60 passengers per unit
- Control: Automated
- Cost: $ 290 000

Mach ultra-speed class:
- Top speed: 390 mph
- Average lifetime: 15 years
- Power system: Overhead
- Capactiy: 50 passengers per unit
- Control: Automated
- Cost: $305 000

Atlas cargo class:
- Top speed: 150 mph
- Average lifetime: 30 years
- Power system: Overhead/Track
- Capacity: 80 tons per unit
- Control: Automatic OR Manual override
- Cost: $120 000 per unit

Track Laying:
Powered rails: $20 per metre
Unpowered rails: $15 per metre
Overhead cable: $5 per metre

Kits:
The small city network: $4 000 000 for up to 5 km: Includes 20 Mercury class Maglevs

The large city network: $16 000 000 for up to 30 km: Includes 80 Mercury class Maglevs

The Metropolis network: $60 000 000 for up to 100 km: Includes 200 Mercury class Maglevs, and up to 20 medium stations.

Intercity line: $3 000 000 for up to 100 km of track. Includes 10 Peregrine class Maglevs OR 4 medium stations.

Stations
Small station: $700 000 for up to two platforms
Medium station: $1 500 000 for up to four platforms and a small retail area
Large station: $ 3 000 000 for up to 8 platforms and a medium retail area
Massive station: $6 000 000 for up to 18 platforms and a large retail area
Gargantuam station: $15 000 000 for up to 40 platforms, a massive retail area and a maintenace depot.

Maintenance
1 year insurance: free
5 year: $5000 per kilometre of track/ $4000 per train/$ 1000 per station (of any size)
20 year: $ 18 000 per kilometre of track/$ 15 000 per train/$ 3000 per station (of any size)
50 year: $36 000 per kilometre of track/$ 30 000 per train/$ 6000 per station (of any size)
Alfegos
16-09-2007, 10:25
News: 16/9/07 Company opens to international market

Sales to date: $7, 247, 620, 000
Profit: Undisclosed
Shares: 5 00 000 (20% CEO)
Share Value: $2010

Nations using Silver Javelin systems:
Alfegos
SaintB
Dartia
Vandaheim
SaintB
16-09-2007, 11:45
KSB Railines Incorperated

In order to meet increasing demands placed upon the Kingdom of SaintB's economy by our rapidly growing private sector and population we would like to purchase one dozen new Atlas Class Frieght Trains for a price of 1.44 million USD.
Alfegos
16-09-2007, 11:46
The deal has been accepted: which gauge to you wish them to be in?
Note that they come with one year's free insurance.
SaintB
16-09-2007, 11:58
OOC: I don't know much about trains lol.... so whatever is average?
Alfegos
16-09-2007, 12:05
OOC: 750 mm is standard maglev gauge in Alfegos, and most countries. (Gauge is the distance between the "wheels"... in this case, it is the width of the magnet)
SaintB
16-09-2007, 12:18
OOC: Thanks, I might have Integrated come in and buy some stock...

We would like our trains in 745 gauge.
Alfegos
16-09-2007, 12:20
Accepted: the trains are in transit, by ship. They should arrive within a day.
Alfegos
16-09-2007, 13:04
Silver Javelin railinks is proud to accept the deal offered for the construction and insurance work in Dartia.

We will be willing to build rail inks around your coast, and ask as to the length of the potential line.
Alfegos
16-09-2007, 13:05
ooc: oops, forum moved the post.
Dartia
16-09-2007, 13:05
http://i141.photobucket.com/albums/r77/Dartia/logo1.jpg

To: Maglev Manufacturing Services
From: Dartian Department of Transportation
Re: Purchase

Our government is impressed by your offerings and prices, and wish to place an order for the following:

20 x Metropolis Networks = $1.2 billion
50 x Large City Networks = $.8 billion
10 x Gargantuan Stations = $.15 billion
60 x Massive Stations = $.36 billion
100 x Medium Stations = $.15 billion
200 x Small Stations = $.14 billion

50 Year Track Insurance Policy = $.126 billion
50 Year Trains Insurance Policy = $.24 billion
50 Year Station Insurance Policy = $4.56 million

Total: $3,170,560,000.00

We also wish to inquire if your company would be interested in bidding to build a single double rail line, which would connect all the major cities along our coastline and border in our homeland?

Sincerely,
Kathleen Harris
Secretary of Transportation

OOC: My map is in my signature. My homeland is about the size of India.
Alfegos
16-09-2007, 14:51
Bump
Alfegos
16-09-2007, 16:00
OOC: Dartia, the post to reply to your request migrated to above your post...don't ask me why!
Alfegos
16-09-2007, 17:10
Please someone...buy my lovely products!!!
Alfegos
16-09-2007, 17:51
The invisible bump
Alfegos
16-09-2007, 18:43
Does anyone else want quality rail networks for cheap prices?
DMG
16-09-2007, 21:43
[OOC: You don't have to bump the thread every hour.]
Vandaheim
16-09-2007, 22:02
To: Maglev Manufacturing Services
From: Vandaheimian Department of Transportation
Re: Purchase of Maglev Infrastructure

Our government is impressed by your offerings and prices, and wish to place an order for the following:

10 x Metropolis Networks = $.6 billion
10 x Gargantuan Stations = $.15 billion
100xMedium Stations = $.15
400xSmall Stations = $.28 billion
10million meters interconnecting track - $.2 billion
100 Atlas Maglev Trains $.012 billion

50 Year Track Insurance Policy = $396 million
50 Year Trains Insurance Policy = $63 million
50 Year Station Maintenance Policy = $4.5 million

Total: $1,855,500,000.00


Sincerely,
Harold Reese
Overseer of Transportation
Alfegos
17-09-2007, 07:06
OOC: Alright
Order accepted: the equipment is being shipped in via container ships. Expect completion of your order within 2 months.
Alfegos
18-09-2007, 07:54
Shock! Horror! Its a visible BUMP!