Scandavian States
11-03-2005, 02:00
Macha class Nuclear-Powered Light Carrier
Displacement: 95,000 tons
Dimensions: 305M L x 85M W x 9.5M D
Propulsion:
2 x Pebblebed reactors rated at 150Mw each
3 x Water jets
Speed: 35 knots (top speed)
Crew: 1,200
Endurance: Limited to crew endurance only.
Radar:
APAR-12E Air/Surface (Long Range Air/Surface Search/Targeting)
OTH-MR (Medium Range Over-The-Horizon Search/Targeting)
G04 Navigation
Fire Control:
Falltech GSWDC Control Bloc (Ship Control)
Falltech NG05 (Gunfire Control)
Host arrays for multilink combat systems (such as AEGIS)
EW:
Falltech Mk603 Intercept/Jamming Unit
4 x Falltech Type 5 MR Chaff/Flare Dispensers
Host arrays for ELINT equipment
LIDAR/SONAR:
PDI NSL-1A (Hull mounted, medium range)
SS-24 Flank Array (Passive Signal Triangulation)
SS-300 Flank Array (Passive Signal Triangulation)
Aviation: Up to 72 aircraft
Assault: 240 Marines, 16 light vehicles, and several Zodiaks
Armament:
4 x 8-cell Single-length Tactical Mk72 VLS
4 x Mk45 CAMDS
4 x 250mm Torpedo Intercept System
8 x 50mm UWSC Railguns
Armour: Grade S2 Modular Armour
These ships will be built in a 6-8-8-6 unit cycle with each new cycle beginning the a year after the preceeding one. This means that it will take 10 years to build all twenty-eight units, baring unforseen events. Fortunately, unlike the Masada class LPHNs, these ships will never strain the procurement budget, with a per cycle procurement cost never exceeding 48 billion.
Displacement: 95,000 tons
Dimensions: 305M L x 85M W x 9.5M D
Propulsion:
2 x Pebblebed reactors rated at 150Mw each
3 x Water jets
Speed: 35 knots (top speed)
Crew: 1,200
Endurance: Limited to crew endurance only.
Radar:
APAR-12E Air/Surface (Long Range Air/Surface Search/Targeting)
OTH-MR (Medium Range Over-The-Horizon Search/Targeting)
G04 Navigation
Fire Control:
Falltech GSWDC Control Bloc (Ship Control)
Falltech NG05 (Gunfire Control)
Host arrays for multilink combat systems (such as AEGIS)
EW:
Falltech Mk603 Intercept/Jamming Unit
4 x Falltech Type 5 MR Chaff/Flare Dispensers
Host arrays for ELINT equipment
LIDAR/SONAR:
PDI NSL-1A (Hull mounted, medium range)
SS-24 Flank Array (Passive Signal Triangulation)
SS-300 Flank Array (Passive Signal Triangulation)
Aviation: Up to 72 aircraft
Assault: 240 Marines, 16 light vehicles, and several Zodiaks
Armament:
4 x 8-cell Single-length Tactical Mk72 VLS
4 x Mk45 CAMDS
4 x 250mm Torpedo Intercept System
8 x 50mm UWSC Railguns
Armour: Grade S2 Modular Armour
These ships will be built in a 6-8-8-6 unit cycle with each new cycle beginning the a year after the preceeding one. This means that it will take 10 years to build all twenty-eight units, baring unforseen events. Fortunately, unlike the Masada class LPHNs, these ships will never strain the procurement budget, with a per cycle procurement cost never exceeding 48 billion.