NationStates Jolt Archive


JAT Railway Store!

Japanese Antarctica
16-09-2004, 23:13
OOC: Please do your own math! If you don't I'll add a Laziness Tax on to your purchase.

We sell: Locomotives, Rail Building contracts, Rail bridge contracts and Subway/Tunnel building contracts.

IC:

Welcome to the JAT railway storefront. Run by a consortium of train makers, you're sure to find a something that's right for your nation. All trains have served or are serving in our country too, so you'll get only the best!

Q: Why do I need trains?
A: Trains play a key role in transporting goods and raw materials around the country. They are cheaper to use than trucks or ships, therefore, you'll make a much bigger profit because you'll be saving on shipping costs. A nation that wants a good economy needs trains.
Trains are also an effective mass transit system. They will lighten the traffic you have on your roads and highways, plus it will get you where you want to go quicker.

With that said, you should go no further than here, to purchase world class locomotives. All sales are for the locmotive only (excluding Shinkansen), train cars will be sold later.

We will also sell rail tracks. State between which two places you want a line, and we'll calculate the price and time to complete the task!

EF-81
http://ts.sakura.ne.jp/~rokko1go/mediafile/photo/5hokurik/EF81opc_nao.jpg
DC1500V, AC20000V; 50/60Hz.
Speed: 110 km/h

An old, but reliable electric frieght train. First used in the 1960's, the EF81 was useful in shipping goods throughout Japan. Also, it was used in Japanese Antarctica during its beginning years. A good choice for young nations.
$4 Million

http://www.khi.co.jp/sharyo/pro_final/train/jrf_redbear.jpg
DF200
Speed:Maximum operating speed at 110km/h
Control system:VVVF inverter control
Main traction motor:320kW
Dimensions:19,600mm (L) 2,805mm (W) 4,078mm (H)


This train uses induction motors. Meaning, it has high speed, high acceleration and high torque. Also, maintenance costs are low due to the induction motors. Great choice for hauling freight cars.

$5.5 Million

681 Series
http://ts.sakura.ne.jp/~rokko1go/mediafile/photo/0keishiki/EC681_01.jpg
Speed: 140 km/h

This train was built in 1992. It is mainly for passenger service only. 9 Cars max.

$9 Million

785 Series
http://ts.sakura.ne.jp/~rokko1go/mediafile/photo/1hokkai2/ec785_asa01.jpg

Runs at 130 km/h in the snow! Good for cold climate nations. Still is in service in Japanese Antarctica.

$12 million

Shinkansen 500
http://www.budoforum.net/japan2001/fotos/shinkansen.jpg


Japan's Bullet Train! Capable of 300 km/h, it is the fastest and most expensive train to ever run in Japan. It is currently used to transport people between Japanese Antarctica's business districts.

$40 Million

[This Message approved by Japanese Antarctica's Ministry of Commerce]
-Gekko Yoshinobu, Japanese Antarctican Minister of Commerce


OOC: If anyone is knowlegable in trains, I'd be grateful for your help
Japannese Islands
16-09-2004, 23:18
I would be willing to help you with trains, just t-gram or IM me (I believe you have my AIM address)

(This is Tokarev, by the way)
Japanese Antarctica
16-09-2004, 23:20
OOC:

ok, but you're not on AIM right now.
Japanese Antarctica
17-09-2004, 00:25
bump
Japanese Antarctica
17-09-2004, 12:17
bump
Japanese Antarctica
17-09-2004, 13:36
bump please someone buy something from me
Moleland
17-09-2004, 13:44
I'm not interested in buying trains thankyou!
Japanese Antarctica
17-09-2004, 14:00
bump for update
Moleland
17-09-2004, 14:03
You're not having much luck selling stuff, are you?
Japanese Antarctica
17-09-2004, 14:04
You're not having much luck selling stuff, are you?

no. any tips?
Moleland
17-09-2004, 14:16
Well, for a start, you have started a strorefront, which is direct competition with another that is selling (as far as I can be bothered to tell) is selling the same stuff. Secondly, you have admitted that you have tried to copy another nations storefront (not wise). aAnyway, the other one is AMAZINGLY popular anyway.

I suggest that you either A) start again at a different time (ie, when your rival ends their storefront)
B) keep trying!
Good luck anyway.

My storefront wasn't that successful. You start getting the hint when 75% of all the posts are from you writing BUMP
Japanese Antarctica
17-09-2004, 14:19
Well, for a start, you have started a strorefront, which is direct competition with another that is selling (as far as I can be bothered to tell) is selling the same stuff. Secondly, you have admitted that you have tried to copy another nations storefront (not wise). aAnyway, the other one is AMAZINGLY popular anyway.

I suggest that you either A) start again at a different time (ie, when your rival ends their storefront)
B) keep trying!
Good luck anyway.

My storefront wasn't that successful. You start getting the hint when 75% of all the posts are from you writing BUMP

I had trains first. He was only selling railways at the time. I thought we could work from each other's successes. So it wasn't really a copy.

If this doesn't work out i'll let this thread die.
Moleland
17-09-2004, 14:23
ok!

Good luck to ya! (The last person whose srorefront didn't start off well, suddenly became really popular. So, don't give up!)
Spammernite
17-09-2004, 14:42
OOC: I hope your trains derail.
Moleland
17-09-2004, 14:43
Charming!
Japanese Antarctica
17-09-2004, 14:46
OOC: I hope your trains derail.

OOC: Why make that comment OOC? I don't have any trains in real life. But thanks for bumping my thread.
Spammernite
17-09-2004, 14:49
no prob
Japanese Antarctica
17-09-2004, 16:37
bump
Former Soviet Mafia
17-09-2004, 17:12
We would like to order 2 DF200 trains. $11 Million will be wired when the order is confirmed.

OOC: just want to help you out bro.
Japanese Antarctica
17-09-2004, 17:20
We would like to order 2 DF200 trains. $11 Million will be wired when the order is confirmed.

OOC: just want to help you out bro.

Order Confirmed. Construction and shipping will take 1 NS year. Thank you for buying JAT locomotives.
Japanese Antarctica
17-09-2004, 18:36
bump
Japanese Antarctica
17-09-2004, 19:35
OOC:

bump.

come on, everyone needs trains for their country to run smoothly. you know you want to buy.
The Skyline
17-09-2004, 19:48
The Skyline wants to order the following trains

*10 Shinkansen 500s
*10 681 Series
*5 DF200s
Arribastan
17-09-2004, 20:05
We will buy 100 Shinkansen 500 trains
$4 billion will be wired upon confirmation.
~Alex Wolfe, Minister of Transport
Demidia
17-09-2004, 20:24
The Republic od Demidia has recently come back into the realm of Nationstates, as such much of our public transport is detieriorated and useless, as such we are in a massive renovation of public works, so we require 100 Shinkansen 500 trains if you please.
The total will be wired upon delivery.

Honorable Patrick Mince
Minister of Transportation
Republic of Demidia

OOC: Go to the GDP Calc and plug in Demidia, you will see we have quite enough cash.
Arribastan
17-09-2004, 20:30
OOC: Go to the GDP Calc and plug in Demidia, you will see we have quite enough cash.
OOC: Are you resurrected, too?
Japanese Antarctica
17-09-2004, 20:40
We will buy 100 Shinkansen 500 trains
$4 billion will be wired upon confirmation.
~Alex Wolfe, Minister of Transport
The Republic od Demidia has recently come back into the realm of Nationstates, as such much of our public transport is detieriorated and useless, as such we are in a massive renovation of public works, so we require 100 Shinkansen 500 trains if you please.
The total will be wired upon delivery.

Honorable Patrick Mince
Minister of Transportation
Republic of Demidia

OOC: Go to the GDP Calc and plug in Demidia, you will see we have quite enough cash.

OOC: WHOA. You really need that many?

IC:

Both orders confirmed. But due to the massive order, it will take 20 NS years to build all. 5 Trains will be shipped every year, for the following 20 years.
Japanese Antarctica
17-09-2004, 20:43
The Skyline wants to order the following trains

*10 Shinkansen 500s
*10 681 Series
*5 DF200s

Since you didn't do your math, the 30% laziness tax applies. $675 is the total, your order will be shipped when the money arrives.

We hope that all clients are pleased with their order, and thank you for buying from JAT, the best trains in the world.
Japanese Antarctica
17-09-2004, 21:04
bump for update
Demidia
17-09-2004, 21:50
OOC: Are you resurrected, too?
yep
Japanese Antarctica
17-09-2004, 22:38
bump
The Voltarum
18-09-2004, 00:39
The High Order has decided that due to increased travel between our nation and our settlements in the North Sector Naval Base, alogn with the increase of rogue ice bergs heading our naval traffic, a new rail system must be installed between our land and the base. The Voltarum enginneers are ready to build a track across the unoccupied land to your border and if your government is willing, emply a connection across your country to the Base. The use of your tracks will, of course, will compensated for.

This process will also of course require the purchase of vehicles to service these tracks. If the above proposal is acceptable, the Voltarum would like to purchase 7 Shinkansen 500, and 20 DF200.

The purchase price of $390 Million will be wired upon agreement of these terms.

For Antarctica,
Chancellor Xerco
Premier of the Order
Japanese Antarctica
18-09-2004, 12:40
The High Order has decided that due to increased travel between our nation and our settlements in the North Sector Naval Base, alogn with the increase of rogue ice bergs heading our naval traffic, a new rail system must be installed between our land and the base. The Voltarum enginneers are ready to build a track across the unoccupied land to your border and if your government is willing, emply a connection across your country to the Base. The use of your tracks will, of course, will compensated for.

This process will also of course require the purchase of vehicles to service these tracks. If the above proposal is acceptable, the Voltarum would like to purchase 7 Shinkansen 500, and 20 DF200.

The purchase price of $390 Million will be wired upon agreement of these terms.

For Antarctica,
Chancellor Xerco
Premier of the Order

Order confirmed. JAT will give a $90 Million rebate to you, as expensive shipping is not needed since you are our neighbor. For this reason, expect the tracks to be laid and trains to be delivered in less than 1 NS year.

Thank you for purchasing JAT locomotives.
Napoleonic Empire
18-09-2004, 13:18
[OOC: If you would offer some more, antique locomotives, we may be able to work something out.]
Warta Endor
18-09-2004, 14:38
The people's Republic of Warta Endor wants to place the following order:
-40 681 series worth 360 million
-25 DF 200 worth 137.5 million

Department of Trasport and Industries

ps. could you help with building a railroad on Sumatra???
Japanese Antarctica
18-09-2004, 15:05
[OOC: If you would offer some more, antique locomotives, we may be able to work something out.]

OOC: Sorry, earliest we have is post-WWII (1960's)

[quote=Warta Endor]The people's Republic of Warta Endor wants to place the following order:
-40 681 series worth 360 million
-25 DF 200 worth 137.5 million

Department of Trasport and Industries

ps. could you help with building a railroad on Sumatra???[/img]

Order Confirmed. Will ship once money is received. Expect delivery in 1.5 NS years. As for your request to lay rails, yes, we can do that, but we'll need to know what you want to connect (ie which cities/locations). If you want us to connect two islands, then the price will go up as well. Telegram the ministry of commerce for details.

Thank you for your order.

-Gekko Yoshinobu
Minister of Commerce
Japanese Antarctica
18-09-2004, 20:07
bump
The Voltarum
18-09-2004, 22:02
Excellent. The Voltarum Ministry of Engineering has already started to extend our track northwestward across deserted land toward your southeastern border.

Chancellor Lignar Twigroot
High Minister of Transportation
Japanese Antarctica
18-09-2004, 22:35
Perfect. We'll meet you there. Only thing holding us up is a 1/2 km tunnel we are building through hills a few kms north of the border.
Japanese Antarctica
18-09-2004, 23:59
bump
Japanese Antarctica
19-09-2004, 14:02
bump for edit
Japanese Antarctica
19-09-2004, 14:35
bump for update
Japanese Antarctica
19-09-2004, 16:01
bump
Warta Endor
19-09-2004, 16:15
***********Telegram from Department of Transportation**************

The railway would be build on Sumatra as said. The railroad will connect Palembang (in the south) and Rantrauprapat in the North. Conditions will be harsh for the terrain is mainly Jungle and Wetlands.


Department of Transportation


******Telegram to Department of Commerce of Japanese Antartica*******
Warta Endor
19-09-2004, 17:57
ps Money Wired.
Japanese Antarctica
20-09-2004, 21:32
***********Telegram from Department of Transportation**************

The railway would be build on Sumatra as said. The railroad will connect Palembang (in the south) and Rantrauprapat in the North. Conditions will be harsh for the terrain is mainly Jungle and Wetlands.


Department of Transportation


******Telegram to Department of Commerce of Japanese Antartica*******

OOC: eh, i'm not too familiar with Indonesia. Do you have a map with both cities? Distance between the two? Thanks.

IC:

Before the order is completed, please fill out the following form:

Lenth of rail: (in km please)
Track Gauge: (standard if you are not sure)
Stations: (how many stops along the way)

Estimated total is currently $800 million.

OOC2: If anyone knows the appropriate price, please help me set rates for rail lines.
Warta Endor
21-09-2004, 14:10
Well, I attached a map to this reply. The Railway routes are red. Basicly said I want to connect Palembang and Medan. I also put in a second route. If possible I would like to have them both build
Warta Endor
21-09-2004, 14:13
O yeah,
-Track length: about 1500/2000 km total (both routes)
-Gauge: Standard :confused:
-Stations: 30 main (eastern)route and about 10 (western) route
The western route goes through Mauntainous Terrain.

:D
Warta Endor
22-09-2004, 15:13
-Stations: 60 main (eastern)route and about 50 (western) route, these are passenger stations
-Station:25 (eastern) and 15(western Route)
Japanese Antarctica
23-09-2004, 19:42
OOC: Sorry for the delay, my router was giving me problems.

IC:

Total calculated price is $1.5 Billion. Construction will begin immeadiately, expect it to be complete in 6-10 NS years.
Warta Endor
24-09-2004, 14:04
Money will be wired. Bytheway, could your engineers investigate the building of a tunnel from sumatra to singapore and sumatra to Java (see map)??? In the style of the English Channel tunnel (2 main tubes, one maintenance tube).
Japanese Antarctica
24-09-2004, 19:53
Money will be wired. Bytheway, could your engineers investigate the building of a tunnel from sumatra to singapore and sumatra to Java (see map)??? In the style of the English Channel tunnel (2 main tubes, one maintenance tube).

Order accepted. Price is $500 million. Will begin work as soon as money is received.
Warta Endor
24-09-2004, 20:22
Money wired
Popery121
24-09-2004, 21:39
I would like 100 e81s for 400 mil.

* money wired upon confirmation*
BrophyBronco
24-09-2004, 21:50
I would like to purchase 100 Shikanson 500 for 4 billion

*Money Wired*
Japanese Antarctica
24-09-2004, 22:14
I would like 100 e81s for 400 mil.

* money wired upon confirmation*

I would like to purchase 100 Shikanson 500 for 4 billion

*Money Wired*

confirmed and confirmed.
The Conquer
25-09-2004, 02:16
I would like to buy:

25 Shinkansen 500s each 40million = 1 billion

and money is wired upon conformation.
Japanese Antarctica
25-09-2004, 16:11
I would like to buy:

25 Shinkansen 500s each 40million = 1 billion

and money is wired upon conformation.

Order Confirmed. Expect delivery in 3 NS years.
Warta Endor
27-09-2004, 18:40
The PRWE wants to order :
-8 Shinkansen 500 worth 320 million
Japanese Antarctica
27-09-2004, 19:47
The PRWE wants to order :
-8 Shinkansen 500 worth 320 million

Order confirmed. Expect delivery in 1.5 NS years.
Warta Endor
28-09-2004, 16:57
Order accepted. Price is $500 million. Will begin work as soon as money is received.

Is this about the tunnels?? if yes, when are they finished???
Japanese Antarctica
30-09-2004, 23:54
Is this about the tunnels?? if yes, when are they finished???

Estimated time is 2-3 NS years.

OOC: Technically it's complete now, sorry i wasn't able to respond.