General Aviation is proud to announce that construction has now finished on it's brand new Drasden facility. The Drasden facility is a huge complex of no less than 87 individual building and 3 runsways, 1 of which has an unlimited weight restriction.

General Aviation hopes that the new facility will enable it to expand into areas other than aircraft design eg, Military and Civil motor vechiles. The facility has been setup to allow expansion into other areas of design without extensive modifications to current buildings.

Built using the latest technologies the facility how allows ALL R&D, Testing and production to be carried out in the one facility. The total processing power in the facility comes to a whopping 50,000GFLOPS with the central mainframe able to process at 35,000GFLOPS. All this processing power is used to bring GA customers the very best.

The Drasden facility house the following 35 Wind Tunnels, 7 Production plants, 13 aircraft hangers, 1 mainframe centre, 20 office buildings as well as 11 spare building.


Any question you may have about the facility will be happily answered.
Pedaphiliac
16-06-2004, 09:30
We, with our passion of aviation, donate 600 Billion Dollars for Research, enlargement of the facility, and equipment.

Additional funds of 200 Billion a year will be donated.

Good luck.
General Aviation LTD
16-06-2004, 10:53
Thank you for your generous donation.