NationStates Jolt Archive


CTSS-001 CAS Independence Mission Follow topic

28-12-2003, 17:29
TOPIC IS FURTHERMENT IN CAS INDEPENDENCE MISSION, UPDATES AS NECCESSARY.



CAOC Aerospace Command Center Operational Update:

---- Mission Statis ----

Confederate Aerospace Ship Independence

-- Flight Statis:
-98.99% Overall Check,
-100% Check to Operations Systems

-- Shuttle Statis:
-100% Mission Ready Check
-98.99% Overall Flight Check
-99.99% Thruster Ratio Check
-100% Communications Cherck
-99.98% Fuel Burn Check
-100% Overall Shuttle System Readiness Check

-- Schedule Statis
1. 0600 Hours, 6:00 AM, EST Launch--COMPLETE--
----Halted until 0622, 6:22 AM, EST for launch check
2. Orbital Specification/Bay Door Open 1050 Hours, 10:50 AM, EST--COMPLETE--
----Launch caused 1100 Hours, 11:00 AM, EST update
3. Main Bay Doors open for Cargo Deployment 1130 Hours, 11:30 AM, EST--IMCOMPLETE--

CAOC Shuttle Problem List:

-- 1118 Hours, 11:18 AM, EST telementry recieved on problem with ONE(1) forward retro thruster.
-SOLUTION- Problem Filed and Logged, Solution is decided to monitor situation for further developments.
28-12-2003, 17:38
CTSS-001 Independence Mission Log Update:
-- Telementry Recieved, 1129 Hours, 11:29 AM, TST/EST that forward retro-thruster caused malfunction in first retro-thruster panel in nose of shuttle, canceled Main Bay Door opening for checklist and review of situation.

CAOC Aerospace Mission Control has concluded that any problems continue that mission will be halted completly and a review of CTS-001 Independence will comence, which will further Space Repair Operation suggested by CAOC Mission Control Officer Michael Dunkat.
28-12-2003, 17:50
CAOC Aerospace Mission Control--

Chief Aerospace Officer and Chief Administrator Thomas Senera has stated and concluded with the Confederate Aerospace Administration Board that the problem has been fixed and mission will continue.

CTSS-001 Independence Mission Update:

-- 1200 Hours, 12:00 PM, T/EST Confederate Shuttle Independence will commence Main Shuttle Bay Opening and ready Shuttle Cargo SS-01 Main Station Section for Space Station Reliant to be deployed.
28-12-2003, 17:54
CAOC Aerospace Command Center Operational Update:

---- Mission Statis ----

Confederate Aerospace Ship Independence

-- Flight Statis:
-98.99% Overall Check,
-100% Check to Operations Systems

-- Shuttle Statis:
-100% Mission Ready Check
-98.97% Overall Flight Check
-98.90% Thruster Ratio Check
-100% Communications Cherck
-99.90% Fuel Burn Check
-100% Overall Shuttle System Readiness Check

-- Schedule Statis
1. 0600 Hours, 6:00 AM, EST Launch--COMPLETE--
----Halted until 0622, 6:22 AM, EST for launch check
2. Orbital Specification/Bay Door Open 1050 Hours, 10:50 AM, EST--COMPLETE--
----Launch caused 1100 Hours, 11:00 AM, EST update
3. Main Bay Doors open for Cargo Deployment (Resceduled)1200 Hours, 12:00 AM, T/EST--OPERATION UNDERWAY--
28-12-2003, 18:03
STSS-001 Flight Commander Ronert Godart reports to CAOC Aerospace Mission Control of Independence Shuttle Main Bay Door's opening.

Cargo will be deployed after checklist is complete
28-12-2003, 18:15
Checklist Halted----

STSS-001 Independence Orbit Telementry Confirmed----

Continue Later----
29-12-2003, 01:22
STSS-001 Independence Flight Commander Ronert Godart reports to CAOC Aerospace Mission Control that the shuttle is back in operation after some odd hours of repair and refits via space walks towards the hull and ends. Retro-thrusters are fixed as with minor and one major compnent with the shuttle, mission will continue as planned.
29-12-2003, 01:29
http://www.medphys.ucl.ac.uk/~martins/orbit/images/gallery50.jpg

-STSS-001 Flight Commander Ronert Godart sent back this image of the earth while the repair operations were underway, promising that the images of the space station component will be shown when ready.
29-12-2003, 08:59
-- Confederate Aerospace Operations Command --

CAS Independence is currently on her way home as we speak. We here at the CAOC Aerospace Mission Control apologize for lack of communication of the mission at hand. Probelsm of recent have caused concern, yet our staff thought over the situations and either solved it or figured out how to solve it when the Shuttle lands.

Images will now be posted as to the deployment of the space component and many others as possible, for Tulrania wishes all to see the beauty of this magnificent Earth and this wonderful vehicle called the Space Shuttle.

-- CTSS-001 Mission 1, Tulranian Space Station Component Deployment --

In the absence of communication publicly the Confederate Aerospace Administration Board has been busy fixing and assiting the crew of the CTSS-001 Independence with repairs on the outside, while the crew was in suits, and inside, while it was easier.

We are sorry for any inconvenience as we are waiting for word from the shuttle about it's current operation of re-entry to the Earth's atmosphere, heading to the Tulranian Aerospace Center where the landing strip has been built and placed.

Images from the crew of the CTSS-001 Independence will now be displayed for the viewing pleasure of all, since this may be the last time before another launch of the CTSS-001 Independence will occur, mainly because of shuttle problems.
29-12-2003, 09:25
http://www.orbitmods.com/modules/Gallery/main/almaz.jpg

-- 0313 Hours, 3:13 AM, T/EST radial image recieved from shuttle overhead new orbital station.

-- The CT-OS-01 Zvezda Reliant was successfully deployed via CTSS-001 Independence Main Bay Arm and space walks. It will now be tested and refitted after CTSS-001 Independence's refits.

-- UPDATE --

-- CTSS-001 Independence telementry recieved of beginning atmosphereic decent, image captured for the first time by the newely deployed CT-OS-01 Zvezda Reliant camara, deployed just for this occasion to get first image of a shuttle re-entring the Earth's Atmosphere.
--The deployed camara, as expected, burnt up after transmission of this image.

http://www.medphys.ucl.ac.uk/~martins/orbit/images/gallery46.jpg