The Incorporated States of The Arctic Tundra is now contructing and selling Seawolf Class attack Submarines. We are in production with the countries of Sharkuras and The Free Land of Snow City.
http://img.villagephotos.com/p/2003-7/280747/seawolf1.jpg
Builders General Dynamics Electric Boat Division
Power Plant One S6W reactor
one shaft at with 52,000 shp with pumpjet propulsor
Improved Performance Machinery Program Phase II one secondary propulsion submerged motor
Length 353 feet (107.6 meters)
Draft 35 feet (10.67 meters)
Beam 40 feet (12.2 meters)
Displacement 7,460 ton surface displacement
9,137 tons submerged displacement
Speed Official: 25+ knots (28+ miles per hour, 46.3+ kph)
Actual: 35 knots maximum submerged speed
Actual: 20 knots tactical ["silent"] speed
Operating Depth Official: "greater than 800 feet"
Actual: About 1600 feet
Jane's Fighting Ships: 2000 feet
Armament eight 660-mm torpedo tubes
50 Tomahawk cruise missiles or
50 Harpoon antiship missiles or
50 Mark 48 ADCAP torpedoes or
up to 100 mines
Crew 12 Officers; 121 Enlisted (not included)
Total Cost is 1.5 billion USD.
The submarines will be delivered to you within one month of this time, we currently have 20 built and are producing them at the rate of 1 per week.
Pres. Pavel Andreievich Chekov
ISTAT
http://img.villagephotos.com/p/2003-7/280747/seawolf1.jpg
Builders General Dynamics Electric Boat Division
Power Plant One S6W reactor
one shaft at with 52,000 shp with pumpjet propulsor
Improved Performance Machinery Program Phase II one secondary propulsion submerged motor
Length 353 feet (107.6 meters)
Draft 35 feet (10.67 meters)
Beam 40 feet (12.2 meters)
Displacement 7,460 ton surface displacement
9,137 tons submerged displacement
Speed Official: 25+ knots (28+ miles per hour, 46.3+ kph)
Actual: 35 knots maximum submerged speed
Actual: 20 knots tactical ["silent"] speed
Operating Depth Official: "greater than 800 feet"
Actual: About 1600 feet
Jane's Fighting Ships: 2000 feet
Armament eight 660-mm torpedo tubes
50 Tomahawk cruise missiles or
50 Harpoon antiship missiles or
50 Mark 48 ADCAP torpedoes or
up to 100 mines
Crew 12 Officers; 121 Enlisted (not included)
Total Cost is 1.5 billion USD.
The submarines will be delivered to you within one month of this time, we currently have 20 built and are producing them at the rate of 1 per week.
Pres. Pavel Andreievich Chekov