CSJMI Ground Unit Packages (Reopened!) - Page 2
Das Furer
30-05-2004, 19:36
ooc: oh i see, I though the MFG's or whatever where replacements my bad.
ic: offer accepted, money will be handed over via moneytrain.
Die judentoten
30-05-2004, 19:39
25 X Mechanized Divisions order accepted..money will be given at an undisclosed location in a black breifcase.
Conservative Patriots
30-05-2004, 19:40
If that is acceptable, the total is $32.7015 billion, and is confirmed .
accepted.. money will be sent to our country in an unspecified escort naval fleet.
United Elias
30-05-2004, 19:46
We are currently in the process of restructuring frontline divisions to a system of Composite Brigades, i.e self supporting with logstics, engineer and medical battalions incorporated into it, and we requre a package for our Combat Engineer Battalions in Armoured and Mechanised Divisions with modern equipment .(our current Engineer Brigades are using M88s and BMP-2 versions) Would this be possible?
Clan Smoke Jaguar
31-05-2004, 06:44
OOC: No problem. I'd actually intended to do battalions initially, but later decided that the return wouldn't even come close to matching the amount of time that would be invested in it.
IC:
Our current standard mechanized engineer battalion looks like this*:
HHC
2xCPV (Command Post Vehicle)
12xArmored Breaching Vehicle)
12xHMMWV
6xHEMTT cargo
2x2.5 ton truck
60 personnel
A Company
1xCPV (Command Post Vehicle)
4xACE (Armored Combat Earthmover)
4xCEV (Combat Engineering Vehicle)
4xAVLB (Armored Vehicle Launched Bridge)
4xMCLIC (Mince Clearing Line Charge)
2xM548 (volcano)
9xAPC
5xHMMWV
1x5-ton truck
1x2.5-ton truck
103 personnel
B Company
1xCPV (Command Post Vehicle)
4xACE (Armored Combat Earthmover)
4xCEV (Combat Engineering Vehicle)
4xAVLB (Armored Vehicle Launched Bridge)
4xMCLIC (Mince Clearing Line Charge)
2xM548 (volcano)
9xAPC
5xHMMWV
1x5-ton truck
1x2.5-ton truck
103 personnel
C Company
1xCPV (Command Post Vehicle)
4xACE (Armored Combat Earthmover)
4xCEV (Combat Engineering Vehicle)
4xAVLB (Armored Vehicle Launched Bridge)
4xMCLIC (Mince Clearing Line Charge)
2xM548 (volcano)
9xAPC
5xHMMWV
1x5-ton truck
1x2.5-ton truck
103 personnel
Total:
369 personnel
5xCPV
27xAPC
12xACE
12xCEV
12xAVLB
12xArmored Breaching Vehicle
12xMCLIC (trailer)
6xMine Dispenser (M548 truck w/ volcano)
27xHMMWV
6xHEMTT
3x5-ton truck
5x2.5-ton truck
Vehicle options**:
Engineer APC: M113A4, M113A3, Nova Cat-E, Mist Lynx-E, LAV-E, Stormcrow-E***
Command Post Vehicle: M4 C2V, M577A4, M577A3, LAV-CC
ACE: DEUCE or ACE
CEV: M946 (Iron Cheetah Chassis), M728 (M60 Chassis)
AVLB: Iron Cheetah AVLB, Wolverine (M1 Chassis), M60 AVLB
ABV: Kodiak (Iron Cheetah Chassis), Grizzly (M1 Chassis)
MCLIC: standard
Mine Dispensar: standard
HMMWV: M114 series, M998A2 series, M998A1 series
HEMTT: standard
5-Ton Truck: 7-ton truck or 5-ton truck
2.5-Ton Truck: standard
Notes:
*Armored Recovery vehicles, at least in our army, are organic to combat battalions, rather than the engineering units, which focus entirely on creating & removing obstacles & fighting positions. Thus, as there are few truly heavy units, M88s are not commonly found in the engineer battalions at division and brigade level.
Available ARVs are M88A2, M88A1, AAVR7A1, and LAV-ARV
The M88A2 still fulfills most requirements, even for our forces. However, a new unit, dubbed the M97, is due to enter service soon, and could be made available.
**The listings for units go in descending order starting with the most recommended. This could change based on the units being supported though (ie, Grizzly's and Wolverines would be better for supporting a force of fast tanks like M1s, as the Iron Cheetah-based units are notably slower).
***APCs like the M113 are the most recommended, as they have greater cargo capacity.
United Elias
31-05-2004, 10:55
Very nice, thanks, before I start worrying about which vehicles I will use for particular type of divisions I would like a little advice if possible. The ethos surrounding my new force organisation is basically similar to what the US Army is attempting to do which is bring certain unit types from Division level to Brigade level.
In fact having checked my listings I see that in my proposed 'Armoured Cavalry Battalions' (the basis of my armoured brigades) there is organic recovery in the form of a single platoon of 6 M88A2s. However I also planned to have a medical company as well as a recon and logistics companies as well in the same battalion. This means that I have a battalion of about 1,370 personnel but its more or less self-deployable. Now I am starting to think its better to bring these units back up to Brigade level, so what would you suggest?
McQuaide
03-06-2004, 09:13
OOC: For what it's worth, I would follow the example of the major fighting forces of the real world. With the exception of Marine Corps expeditionary battalions (very cool fighting units, by the way) the US doesn't do a whole lot of independent operations at the battalion level.
Battalions are traditionally comrised of a few (3-5 from what I've seen) companies. If this is the case, adding medical, recon, and logistics companies would obviously water down your units with way too much support stuff. If you were to shrink these units to platoons though, you would lose a lot of the capabilities you would need for these units to operate. What makes Brigade Combat Teams attractive to the 'New Army' and most smaller modern armies is that they have many of the support assets doing many of the same functions, while still supporting a good deal of fighting forces.
Don't give up on self-sufficient battalions, though. Take a look at the Marine expeditionary battalions, they perform a cool function. They surrender a lot of fighting strength and endurance for mobility and flexibility. Kinda cool.
(And a million appologies to CSJ for momentarily hijacking his storefront. This is but marginally topical)
Conservative Patriots
05-06-2004, 02:40
Conservative Patriots would like to order 3 armored Divisions @ $9billion ea = 27billion.
wired upon confirmation.
thanx.
Conservative Patriots
05-06-2004, 02:40
Conservative Patriots would like to order 3 armored Divisions @ $9billion ea = 27billion.
wired upon confirmation.
thanx.
Clan Smoke Jaguar
05-06-2004, 04:35
Very nice, thanks, before I start worrying about which vehicles I will use for particular type of divisions I would like a little advice if possible. The ethos surrounding my new force organisation is basically similar to what the US Army is attempting to do which is bring certain unit types from Division level to Brigade level.
In fact having checked my listings I see that in my proposed 'Armoured Cavalry Battalions' (the basis of my armoured brigades) there is organic recovery in the form of a single platoon of 6 M88A2s. However I also planned to have a medical company as well as a recon and logistics companies as well in the same battalion. This means that I have a battalion of about 1,370 personnel but its more or less self-deployable. Now I am starting to think its better to bring these units back up to Brigade level, so what would you suggest?
Sticking all that support on a battalion is only really beneficial if you expect it to be operating alone. Otherwise, it's more of a hinderance than anything else.
In reality, the size of a nation's primary fighting unit is based on the size of its army and the size of the operations it's expected to fight. For example, the US is dropping down to brigade-level because they expect to be fighting primarily small brushfire wars and police actions such as the operations in Somalia and the Balkans. The force that they're putting together would, however, suffer serious defficiencies if it were put against, say China or India, where larger unit actions would prevail.
In short, reinforced battalions, and even reinforced brigades should not be the rule if you expect to be fighting a major war. You will find larger formations to be much more useful for that.
Conservative Patriots would like to order 3 armored Divisions @ $9billion ea = 27billion.
wired upon confirmation.
thanx.
$27 billion confirmed
ETA for the last unit is 15 NS months
Clan Smoke Jaguar
05-06-2004, 04:49
MINISTRY OF DEFENSE ENVOY
The Commonwealth of McQuaide, a small, democratically governed state located in what was once the Georgian Republic, has been quite active in the recent weeks, and it appears that the world will not become more peaceful any time soon.
Ministry of Defense strategic planning teams have forseen the need for highly mobile, well-commanded and survivable military units for the purposes ofnational defense, peacekeeping operations and humanitarian missions. McQuaide has never had the desire to become an empire, and will never consider the use of military force to aquire land, resources, or subjects.
In order to emerge from engagements victorious, it is considered by this ministry that the best equipment become available for use. Long-range predictions forsee a maximum armed forces size of three army corps, one Marine corps, up to 18 wings of assorted aircraft, a CVBG, and two amphibious ready groups capable of brigade-sized deployments. At the moment, the Commonwealth is prepared to procure a reinforced corps.
It is clear to our administration that the Clan Smoke Jaguar equipment offerings are the best choice for our armed forces. We are willing to provide much in order to procure such equipment. In return for Most Favored Nation or Nation in Good Standing status with Clan Smoke Jaguar, we are willing to offer you the following, and are willing to consider any additional requests:
1) A Non-Aggression agreement. Under no circumstances will the Commonwealth of McQuaide ever employ offensive military force against Clan Smoke Jaguar.
2) A Mutual Defense On Demand aggreement. The Commonwealth is willing to dedicate up to 1/3 of the total standing strength of the McQuaide armed forces to operations in support of Clan Smoke Jaguar military operations whenever required by Clan Smoke Jaguar.
3) Most Favored Nation status. The Commonwealth of McQuaide will not levvy any tax or tarriff on the import of any product from Clan Smoke Jaguar.
4) Full cultural exchange privilages. Clan Smoke Jaguar citizens will be extended special quasi-citizenship rights within Commonwealth borders.
5) Lend/Lease privilages for the following facilities:
a) 2 mile x 2 mile naval base in New Dublin harbor, just 6 miles from the capital city of New Dublin. Clan Smoke Jaguar will be allowed to base up to 6,000 personel at this facility, with reasonable restrictions on defensive weaponry. Although nuclear powered vessels will be allowed, vessels carrying nuclear, biological, or chemical weapons will not.
b) 3 mile x 1 mile air base in the central region of McQuaide, allowing up to 8,000 personel and reasonable restrictions on defensive weaponry. No aircraft carrying nuclear, biological, or chemical weapons will be permitted.
6) Exclusive uranium extraction rights to 85% of the McQuaide Uranium Reserve. That which is not presently owned by private enterprise in McQuaide is considered the Uranium Reserve.
Should there be any points of this offer that Clan Smoke Jaguar wishes to discuss, our military envoy is fully authorized to negotiate on the behalf of the Commonwealth.
OOC: Sorry, missed this last time around.
IC:
This offer would be more than sufficient for NGS status. MFN however, is something that must be earned over time. Only our closest and most trusted allies achieve that status.
McQuaide
05-06-2004, 05:03
The Commonwealth of McQuaide accepts the Clan Smoke Jaguar offer of NGS status in return for our original offer. We are thus forwarding the following purchase order for your approval:
1x Reserve Corps Signals Brigade
Basic Cost $500 million
1x Reserve Light Infantry Brigade (Military Police)
Basic Cost $95 million
1x Reserve Corps Heavy Artillery Brigade
Basic Cost $650 million
Replace M577A3 with M4 C2V: +$84 million
TOTAL $734 million
1x Reserve Corps Aviation Brigade
Basic Cost $7.4 billion
Replace UH-60L with UH-60M: +$1.15 billion
TOTAL $8.55 billion
1x Reserve Corps Engineering Brigade
Basic Cost 1.25 billion
Replace M113A3 variants with M113A4: +$35 million
Replace M577A3 with M4 C2V: +$25 million
TOTAL $1.31 billion
1x Reserve Corps Air Defense Brigade
Basic Cost $2.75 billion
1x Reinforced Armored BCT:
Basic Cost: $2 billion
*Replace Iron Cheetah Export with Iron Cheetah II: +$410 million
Replace M113A3 variants with M113A4: +$25 million
Replace M577A3 with M4 C2V: +$13 million
TOTAL $2.448 billion
1x Reinforced Urban Combat BCT
Basic Cost $2.5 billion
*Replace Merkava 4 with Merkava 4SJ: +$85 million
Replace M113A3 variants with M113A4: +$45 million
Replace M577A3 with M4 C2V: +$150 million
TOTAL $2.78 billion
4x Light Infantry Brigade
Basic Cost x4 $380 million
2x Mechanized Divisions:
Basic Cost $8.75 billion
*Replace Iron Cheetah Export with Iron Cheetah II: +$810 million
Replace M113A3 variants with M113A4: +$85 million
Replace M577A3 with M4 C2V: +$450 million
TOTAL x2 Divisions $20.19 billion
1xReinforced Mechanized Airborne BCT:
Basic Cost $1.1 billion
*Replace Stormcrow Export variants with Stormcrow II: +$100 million
Replace M113A3 variants with M113A4: +$35 million
Replace M119A1 with M198: +$10 million
TOTAL $1.245 billion
1x Reinforced Airmobile BCT:
Basic Cost $4.5 billion
Replace M119A1 with M198: +$10 million
Replace CH-47F with CH-53E Super Stallion: +$500 million
Replace UH-60L with UH-60M: +$500 million
TOTAL $5.51 billion
2x Reinforced Airborne Infantry BCT:
Basic Cost $500 million
Replace M119A1 with M198: +$10 million
Total x2 Brigades $1.02 billion
2x Divisional Light Artillery Brigade
Basic Cost $300 million
Replace M119A1 with M198: +$30 million
TOTAL x2 $660 million
2x Divisional Light Aviation Brigade
Basic Cost $2.15 billion
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
Replace UH-60L with UH-60M: +$500 million
Replace OH-58D with RAH-66A Comanche: +$625 million
TOTAL x2 $8.85 billion
2x Divisional Light Engineering Brigade
Basic Cost $400 million
Replace LAV-AG with LAV-105: +$10 million
TOTAL x2 $820 million
2x Divisional Light Air Defense Brigade
Basic Cost $500 million
TOTAL x2 $1 billion
1x Reinforced Airmobile Brigade Combat Team
Basic Cost $4.5 billion
Replace M119A1 with M198: +$10 million
Replace CH-47F with CH-53E Super Stallion: +$500 million
Replace UH-60L with UH-60M: +$500 million
TOTAL $5.51 billion
3x Reinforced Light Mechanized Brigade Combat Teams
Basic Cost $1.65 billion
TOTAL x3 $4.95 billion
TOTAL Purchase Cost Ground Forces: $69,302,000,000.00
(without any NGS discounts)
The Commonwealth desires that this sum be paid in equal payments during the time it takes to deliver the equipment. The Commonwealth thanks you for this arrangement and looks forward to further dealings as we grow.
3P0x1 to CSJMI:
5 urban combat divisions @ $9 Billion ea = $45billion.
money to be delivered by a mail courier.
Natashria
05-06-2004, 19:54
The People's Republic of Natashria would like to commision one armored division @ nine billion dollars. upon confirmation of shipment, the money will be flown in by cargo plane.
Defense Department, Military procurement.
Clan Smoke Jaguar
06-06-2004, 06:09
The Commonwealth of McQuaide accepts the Clan Smoke Jaguar offer of NGS status in return for our original offer. We are thus forwarding the following purchase order for your approval:
1x Reserve Corps Signals Brigade
Basic Cost $500 million
1x Reserve Light Infantry Brigade (Military Police)
Basic Cost $95 million
1x Reserve Corps Heavy Artillery Brigade
Basic Cost $650 million
Replace M577A3 with M4 C2V: +$84 million
TOTAL $734 million
1x Reserve Corps Aviation Brigade
Basic Cost $7.4 billion
Replace UH-60L with UH-60M: +$1.15 billion
TOTAL $8.55 billion
1x Reserve Corps Engineering Brigade
Basic Cost 1.25 billion
Replace M113A3 variants with M113A4: +$35 million
Replace M577A3 with M4 C2V: +$25 million
TOTAL $1.31 billion
1x Reserve Corps Air Defense Brigade
Basic Cost $2.75 billion
1x Reinforced Armored BCT:
Basic Cost: $2 billion
*Replace Iron Cheetah Export with Iron Cheetah II: +$410 million
Replace M113A3 variants with M113A4: +$25 million
Replace M577A3 with M4 C2V: +$13 million
TOTAL $2.448 billion
1x Reinforced Urban Combat BCT
Basic Cost $2.5 billion
*Replace Merkava 4 with Merkava 4SJ: +$85 million
Replace M113A3 variants with M113A4: +$45 million
Replace M577A3 with M4 C2V: +$150 million
TOTAL $2.78 billion
4x Light Infantry Brigade
Basic Cost x4 $380 million
2x Mechanized Divisions:
Basic Cost $8.75 billion
*Replace Iron Cheetah Export with Iron Cheetah II: +$810 million
Replace M113A3 variants with M113A4: +$85 million
Replace M577A3 with M4 C2V: +$450 million
TOTAL x2 Divisions $20.19 billion
1xReinforced Mechanized Airborne BCT:
Basic Cost $1.1 billion
*Replace Stormcrow Export variants with Stormcrow II: +$100 million
Replace M113A3 variants with M113A4: +$35 million
Replace M119A1 with M198: +$10 million
TOTAL $1.245 billion
1x Reinforced Airmobile BCT:
Basic Cost $4.5 billion
Replace M119A1 with M198: +$10 million
Replace CH-47F with CH-53E Super Stallion: +$500 million
Replace UH-60L with UH-60M: +$500 million
TOTAL $5.51 billion
2x Reinforced Airborne Infantry BCT:
Basic Cost $500 million
Replace M119A1 with M198: +$10 million
Total x2 Brigades $1.02 billion
2x Divisional Light Artillery Brigade
Basic Cost $300 million
Replace M119A1 with M198: +$30 million
TOTAL x2 $660 million
2x Divisional Light Aviation Brigade
Basic Cost $2.15 billion
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
Replace UH-60L with UH-60M: +$500 million
Replace OH-58D with RAH-66A Comanche: +$625 million
TOTAL x2 $8.85 billion
2x Divisional Light Engineering Brigade
Basic Cost $400 million
Replace LAV-AG with LAV-105: +$10 million
TOTAL x2 $820 million
2x Divisional Light Air Defense Brigade
Basic Cost $500 million
TOTAL x2 $1 billion
1x Reinforced Airmobile Brigade Combat Team
Basic Cost $4.5 billion
Replace M119A1 with M198: +$10 million
Replace CH-47F with CH-53E Super Stallion: +$500 million
Replace UH-60L with UH-60M: +$500 million
TOTAL $5.51 billion
3x Reinforced Light Mechanized Brigade Combat Teams
Basic Cost $1.65 billion
TOTAL x3 $4.95 billion
TOTAL Purchase Cost Ground Forces: $69,302,000,000.00
(without any NGS discounts)
The Commonwealth desires that this sum be paid in equal payments during the time it takes to deliver the equipment. The Commonwealth thanks you for this arrangement and looks forward to further dealings as we grow.
OOC: Sorry, no special NGS discounts. The better tech and elimination of trade barriers are what you get, which are worth more anyway.
Delivery will take quite some time because of your lower economy. We don't want to get ahead of it :wink:
IC:
$69.302 billion confirmed
The delivery will take place over 7 NS years
3P0x1 to CSJMI:
5 urban combat divisions @ $9 Billion ea = $45billion.
money to be delivered by a mail courier.
$45 billion confirmed
ETA for the last shipment is 2 NS years
The People's Republic of Natashria would like to commision one armored division @ nine billion dollars. upon confirmation of shipment, the money will be flown in by cargo plane.
Defense Department, Military procurement.
We are afraid that with such a weak economy, you could not hope to pay off the cost of this in any meaningful time. If you must have armor, we advise getting a brigade or two with M60s, as that's about what you can afford.
Die judentoten
06-06-2004, 20:11
Die Judentoten would like to purchase 10 Mech Airborne divisions to strengthen our military.
10 X Mech Airborne Divisions
60billion poons are being wired upon confirmation.
Die judentoten
06-06-2004, 20:12
Die Judentoten would like to purchase 10 Mech Airborne divisions to strengthen our military.
10 X Mech Airborne Divisions
60billion poons are being wired upon confirmation.
Imperial Czar Russia
06-06-2004, 21:01
Czar Forces will buy the ARMORED DIVISION PACKAGE
Role: Integrated heavy combat and maneuver force for engaging and destroying enemy formations, including spearheading attacks or mobile defenses, and for exploiting breaches.
Cost: $9 billion standard, $13 billion max (MFN & NGS only), $5.35 billion min
btw we take the $5.35 billion min
Teh ninjas
11-06-2004, 22:21
The Democratic Republic of Teh Ninja's wishes to purchase the following Division Packages:
2 Mechanized Infantry Divisions@8.75=17.5B
2 Urban Combat Divisions@9B=18B
1 Armored Division Package@9B=9B
TOTAL=44,500,000,000
The money is sent once confirmation of order is accomplished.
Clan Smoke Jaguar
12-06-2004, 06:45
Die Judentoten would like to purchase 10 Mech Airborne divisions to strengthen our military.
10 X Mech Airborne Divisions
60billion poons are being wired upon confirmation.
$60 billion confirmed
ETA for the last shipment is 3 NS years
Czar Forces will buy the ARMORED DIVISION PACKAGE
Role: Integrated heavy combat and maneuver force for engaging and destroying enemy formations, including spearheading attacks or mobile defenses, and for exploiting breaches.
Cost: $9 billion standard, $13 billion max (MFN & NGS only), $5.35 billion min
btw we take the $5.35 billion min
IC: $5.35 billion confirmed
ETA for the last unit is 9 NS months
The Democratic Republic of Teh Ninja's wishes to purchase the following Division Packages:
2 Mechanized Infantry Divisions@8.75=17.5B
2 Urban Combat Divisions@9B=18B
1 Armored Division Package@9B=9B
TOTAL=44,500,000,000
The money is sent once confirmation of order is accomplished.
$44.5 billion confirmed
ETA for the last unit is 18 NS months
The Omzian Army, responding to a new requirement for light mechanized infantry divisions for both rapid deployment and high mobility, is currently deciding to negotiating a contract with CSJMI for a total of two Light Mechanized Infantry Division Package to outfit two existing light infantry cold weather divisions, and three Light Armored Brigade (Brigade Combat Team) Packages to outfit other units for such operational requirements (all ordered package units are to be in the "maximum" configuraton). The total as calculated, is $24.455 billion. We hope as part of the deal, the payment could be paid over a period of five years if possible, with 60 installments of approx. $0.407583 billion dollars each.
Also, as the Omzian Army is reviewing its requirements to replace the aging (upgraded) LAV vehicles, and as the Omzian Army has already rejected the Stryker series of vehicles because of poor performance, we are considering to employ the CSJMI LAV-IV military-wide in another deal.
We hope that CSJMI accepts such proposal.
Conservative Patriots
20-06-2004, 02:10
CP wishes to acquire 19 Light Infantry Divisions @ 2.5billion ea
47.5billion wired upon confirmation.
Teh ninjas
22-06-2004, 20:20
The Emperor would like to purchase the following Packages:
2 Light Armored Division Packages@8.5=17B
1 Armored Division Package@9B=9B
1 Mechanized Airborne Package@6B=6B
2 Mechanized Infantry Packages@8.75=17.5B
1 Light Mechanized Division Packages@8.5=8.5
1 Airmobile Infantry Division Packages@8.3=8.3B
Total=66,300,000,000
Money shall be sent once order is confirmed.
Clan Smoke Jaguar
23-06-2004, 06:07
The Omzian Army, responding to a new requirement for light mechanized infantry divisions for both rapid deployment and high mobility, is currently deciding to negotiating a contract with CSJMI for a total of two Light Mechanized Infantry Division Package to outfit two existing light infantry cold weather divisions, and three Light Armored Brigade (Brigade Combat Team) Packages to outfit other units for such operational requirements (all ordered package units are to be in the "maximum" configuraton). The total as calculated, is $24.455 billion. We hope as part of the deal, the payment could be paid over a period of five years if possible, with 60 installments of approx. $0.407583 billion dollars each.
Also, as the Omzian Army is reviewing its requirements to replace the aging (upgraded) LAV vehicles, and as the Omzian Army has already rejected the Stryker series of vehicles because of poor performance, we are considering to employ the CSJMI LAV-IV military-wide in another deal.
We hope that CSJMI accepts such proposal.
With the MFN discount, the total comes to $21.5204 billion
Delivery will be made over the course of 2 NS years
We appreciate the consideration and will be happy to provide should you decide on acquiring the LAV-IV series vehicles.
CP wishes to acquire 19 Light Infantry Divisions @ 2.5billion ea
47.5billion wired upon confirmation.
$47.5 billion confirmed
ETA for the last shipment is 3 NS years
The Emperor would like to purchase the following Packages:
2 Light Armored Division Packages@8.5=17B
1 Armored Division Package@9B=9B
1 Mechanized Airborne Package@6B=6B
2 Mechanized Infantry Packages@8.75=17.5B
1 Light Mechanized Division Packages@8.5=8.5
1 Airmobile Infantry Division Packages@8.3=8.3B
Total=66,300,000,000
Money shall be sent once order is confirmed.
$66.3 billion confirmed
ETA for the last shipment is 3 NS years
We are glad to have the contract proposal accepted. As the Omzian government will be processing the payment to CSJMI for such military sales, we eagerly awaits the delivery, while continues to evaluate the LAV-IV.
Conservative Patriots
23-06-2004, 07:34
Conservative patriots would like to order
5 airborne infantry divisions @ $3.25billion
=16.25 billion dollars wired on confirmation
Al-Sabir
23-06-2004, 14:54
First, we would like to purchase a large number of packages to reinforce our entire army, however we don't require the helos or small arms (also BDUs, Land Warrior Systems, etc.) in the packages. We don't know the exact price of the procurement after removal of these items and after the modifications listed below, as some prices aren't listed in any of your threads, so we would be grateful if you could help us out here.
Second, in one of your previous posts, you said something about the upcoming new M97 as replacement for the aging M88A2 Hercules. We are curious if this new armored recovery vehicle could be made available soon and could replace all 232 M88A2 Hercules vehicles in this procurement order?
Third, we would like the older CLAWS vehicle to be replaced by the MERAD Basalisk, 72 vehicles in this procurement order should be replaced, the MERAD costs $41,000 more, 72 x $41,000 = $2,952,000 extra, but this hasn't yet been added to final costs.
Fourth, we would appreciate it if the Avenger FAADV could be modified to be able to launch the more sophisticated and advanced FIM-256 Black Fly SAM.
- Two Armored Divisions, Cost: $9 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$1 billion
*Replace M1A2 Abrams with Timberwolf: +$35 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$300 million
Replace M113A3 variants with M113A4: +$80 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$450 million
Subtotal $21,930,000,000.
- Three Armored Cavalry Regiments, Cost $3.5 billion standard
*Replace M1A2 Abrams with Timberwolf: +$160 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$100 million
Replace M113A3 variants with M113A4: +$25 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
Replace M577A3 with M4 C2V: +$90 million
*Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker II: +$20 million
Subtotal: $11,790,000,000
- Three Theater Air Defense Groups (MFN & NGS only), Cost 11.5 billion standard
*Replace Grendel with Odin (1152 missiles instead of 1920): +$4.25 billion
Subtotal: $47,250,000,000
- Two Corps Engineer Brigades, Cost $1,25 billion standard
Replace M113A3 variants with M113A4: +$35 million
Replace M577A3 with M4 C2V: +$25 million
Subtotal: $2,620,000,000
Overall subtotal: $83,590,000,000
Money will be wired in ten equal installments, one wil be wired every NS month until payment is complete.
OOC: I realize I requested quite some modifications, if you don't feel like calculating it yourself or if you don't have enough time, give me some numbers and I'll do it myself.
The Commonwealth would like the following Packages in order to greatly increase it's Home Defense Forces:
1 Armored Division
1 Light Armored Division
2 Mechanized Infantry
4 Light Infantry Divisions
1 Light Mechanized Divisions
TOTAL=53.5B
The money shall be wired once our order is confirmed.
Thanks
Die judentoten
27-06-2004, 02:59
Die judentoten
27-06-2004, 03:00
Our Government has approved funds for re-building our military:
1 Armored Division
2 Light Armored Division
2 Mechanized Infantry Division
2 Light Mechanized Infantry Division
4 Light Infantry Division
TOTAL=70.5B
Funds wired.
Unreal Tournaments
27-06-2004, 04:10
The Armed Republic of Unreal Tournaments would like to purchase:
* 40X LAV-CC (Command & Control) vehicles ($32,000,000)
* 25X M4 AMTV medical vehicles ($75,000,000)
* 100X M1070/M1000 HETS transport systems ($60,000,000)
* 500X Sabra Mk.2 MBT tanks ($1,350,000,000)
* 30X FlakPz 1A2 Gepard Air Defense Tanks ($120,000,000)
*100X Stormcrow AIFV vehicles ($300,000,000)
*100X DSR-1 Sniper Rifles ($770,000)
*1000X AN/PVS-7 NVG night vision goggles ($2,500,000)
*1000X Ghillie Suit Accessory Kits ($250,000)
and
*a can of cola from one of your vending machines, since I'm thirsty ($1) :)
Total comes to: $1,940,520,001
Clan Smoke Jaguar
28-06-2004, 09:16
Conservative patriots would like to order
5 airborne infantry divisions @ $3.25billion
=16.25 billion dollars wired on confirmation
$16.25 billion confirmed
ETA for the last shipment is 4 NS months
First, we would like to purchase a large number of packages to reinforce our entire army, however we don't require the helos or small arms in the packages. We don't know the exact price of the procurement after removal of these items and after the modifications listed below, as some prices aren't listed in any of your threads, so we would be grateful if you could help us out here.
Second, in one of your previous posts, you said something about the upcoming new M97 as replacement for the aging M88A2 Hercules. We are curious if this new armored recovery vehicle could be made available soon and could replace all 232 M88A2 Hercules vehicles in this procurement order?
Third, we would like the older CLAWS vehicle to be replaced by the MERAD Basalisk, 72 vehicles in this procurement order should be replaced, the MERAD costs $41,000 more, 72 x $41,000 = $2,952,000 extra, but this hasn't yet been added to final costs.
Fourth, we would appreciate it if the Avenger FAADV could be modified to be able to launch the more sophisticated and advanced FIM-256 Black Fly SAM.
- Two Armored Divisions, Cost: $9 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$1 billion
*Replace M1A2 Abrams with Timberwolf: +$35 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$300 million
Replace M113A3 variants with M113A4: +$80 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$450 million
Subtotal $21,930,000,000.
- Three Armored Cavalry Regiments, Cost $3.5 billion standard
*Replace M1A2 Abrams with Timberwolf: +$160 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$100 million
Replace M113A3 variants with M113A4: +$25 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
Replace M577A3 with M4 C2V: +$90 million
*Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker II: +$20 million
Subtotal: $11,790,000,000
- Three Theater Air Defense Groups (MFN & NGS only), Cost 11.5 billion standard
*Replace Grendel with Odin (1152 missiles instead of 1920): +$4.25 billion
Subtotal: $47,250,000,000
- Two Corps Engineer Brigades, Cost $1,25 billion standard
Replace M113A3 variants with M113A4: +$35 million
Replace M577A3 with M4 C2V: +$25 million
Subtotal: $2,620,000,000
Overall subtotal: $83,590,000,000
Money will be wired in ten equal installments, one wil be wired every NS month until payment is complete.
OOC: I realize I requested quite some modifications, if you don't feel like calculating it yourself or if you don't have enough time, give me some numbers and I'll do it myself.
Removing the helicopters and small arms will cut off the following:
Armored Division: $2.5 billion
Armored Cavalry Regiment: $1.25 billion
The M97s are coming available now, but haven't been added to the listing yet. Adding them will cost $100 million for the armored divisions, $40 million for the armored cavalry regiments, and $15 million for the engineer brigades.
For replacing the CLAWS with the MERAD, the cost must also include the difference in missile costs, and will be $140 million for each division.
Modifying the Avengers as dedicated black fly launchers is relatively cheap, but the missiles again aren't. The total cost would be $60 million per division, $30 million per armored cavalry regiment, and $80 million per air defense group.
With those modifications, the totals are as follows:
Armored Division: $8.765 billion each ($17.53 billion)
Armored Cavalry Regiment: $2.75 billion each ($8.25 billion)
Theater Air Defense Group ADV: $15.83 billion each ($47.49 billion)
Corps Engineer Brigade: $1.325 billion each ($2.65 billion)
Grand total: $75.92 billion
ETA for the last shipment will be 15 NS months
OOC: I know I don't have everything in the package store. I'm sure you can imagine why - it's such a monumental effort to upgrade it that I rarely do so. If there's something you want and I don't have it listed, you can just ask. I actually do have a full listing for prices of all my stuff tucked away.
The Commonwealth would like the following Packages in order to greatly increase it's Home Defense Forces:
1 Armored Division
1 Light Armored Division
2 Mechanized Infantry
4 Light Infantry Divisions
1 Light Mechanized Divisions
TOTAL=53.5B
The money shall be wired once our order is confirmed.
Thanks
$53.5 billion confirmed
ETA for the last shipment is 2 NS years
Our Government has approved funds for re-building our military:
1 Armored Division
2 Light Armored Division
2 Mechanized Infantry Division
2 Light Mechanized Infantry Division
4 Light Infantry Division
TOTAL=70.5B
Funds wired.
$70.5 billion confirmed
ETA for the last shipment is 2.5 NS years
Canabis culture
28-06-2004, 09:26
I would like to order 1 ARMORED DIVISION PACKAGE max 13 bil
please send telegram for response
Golden Falcon
10-08-2004, 00:56
I would like to buy the following packages:
2x ARMORED DIVISION with the following changes:
Replace Iron Cheetah Export with Iron Cheetah: +$175 million
Replace M1A2 Abrams with M1A2 SEP: +$5.5 million
Replace Mist Lynx Export variants with Mist Lynx: +$100 million
Replace M113A3 variants with M113A4: +$80 million
1x MECHANIZED INFANTRY DIVISION with the following changes:
Replace Mist Lynx Export variants with Mist Lynx: +$115 million
1x AIRBORNE INFANTRY DIVISION with the following changes:
Replace M119A1 with M198: +$26 million
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
Replace UH-60L with UH-1Y Iroquois: +$155 million
1x DIVISIONAL ARTILLERY BRIGADE (Heavy)
1xDIVISIONAL ARTILLERY BRIGADE (Light)
2x CORPS ROCKET ARTILLERY BRIGADE
1x SSM BRIGADE
The Colony of Yelm wishes to purchase:
4 Armored Divisions@9b=36b
2 Light Armored Divisions@8.5b=17b
6 Mechanized Infantry Divisions@8.75b=52.5b
1 Urban Combat Division@9b=9b
2 Mechanized Airborne Divisions@6b=12b
10 Light Infantry Divisions@2.5b=25b
TOTAL=151.5b
Money wired once order is confirmed.
Clan Smoke Jaguar
13-09-2004, 17:57
I would like to buy the following packages:
2x ARMORED DIVISION with the following changes:
Replace Iron Cheetah Export with Iron Cheetah: +$175 million
Replace M1A2 Abrams with M1A2 SEP: +$5.5 million
Replace Mist Lynx Export variants with Mist Lynx: +$100 million
Replace M113A3 variants with M113A4: +$80 million
1x MECHANIZED INFANTRY DIVISION with the following changes:
Replace Mist Lynx Export variants with Mist Lynx: +$115 million
1x AIRBORNE INFANTRY DIVISION with the following changes:
Replace M119A1 with M198: +$26 million
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
Replace UH-60L with UH-1Y Iroquois: +$155 million
1x DIVISIONAL ARTILLERY BRIGADE (Heavy)
1xDIVISIONAL ARTILLERY BRIGADE (Light)
2x CORPS ROCKET ARTILLERY BRIGADE
1x SSM BRIGADE
OOC: I apologize for the wait (serious internet trouble)
Total is $35.1175 billion, and due to the delay I'll consider it to have been paid for and delivered some time ago.
Clan Smoke Jaguar
13-09-2004, 17:58
The Colony of Yelm wishes to purchase:
4 Armored Divisions@9b=36b
2 Light Armored Divisions@8.5b=17b
6 Mechanized Infantry Divisions@8.75b=52.5b
1 Urban Combat Division@9b=9b
2 Mechanized Airborne Divisions@6b=12b
10 Light Infantry Divisions@2.5b=25b
TOTAL=151.5b
Money wired once order is confirmed.
OOC: I apologize for the delay, and will just consider this to have been paid for and delivered by now.
Golden Falcon
15-09-2004, 02:16
Alright, and thank you
Angelico
13-12-2004, 06:17
The Protectorate of Angelico desires to establish with Clan Smoke Jaguar a lasting commercial and diplomatic partnership. Though the Protectorate is presently of small size, there is a comprehensive and long-term plan for the modernization and expansion of the Angelican Armed Forces. Our nation desires a role as a leader within the Black Sea and Mediterranean Sea communities, rather than a role as an aggressor or conqueror. It is the opinion of the President that the development of a modern, well-trained military is essential to both the establishment of Angelico as a respected state, and for the unification and pride of the Angelican people.
Through extensive research and planning, it has been determined that the optimal method of modernization of the armed forces is through an exclusive contract with a single nation capable of meeting all Protectorate needs. It is obvious to the Protectorate Bureau of Defense Affairs that Clan Smoke Jaguar is the superior choice.
The Protectorate considers the achievement of Nation in Good Standing status with Clan Smoke Jaguar to be of the upmost importance. As such, the Protectorate is prepared to offer the following in return for NGS Status:
Contractual status of Clan Smoke Jaguar as the exclusive supplier of military goods to the Protectorate of Angelico. This contract calls for all military supplies for the expansion of Angelican military forces to be purchased from Clan Smoke Jaguar, unless the needed item is not offered by Clan Smoke Jaguar. With $415,076,000,000 earmarked for Army purchases alone, and equally large sums set aside in future budgets for air and naval purchases, it will be assured that this arrangement will result in a generation's worth of income for Clan Smoke Jaguar, paid off yearly.
Military non-aggression pact and mutual defense pact.
Most Favored Nation Status
Full rights to Citizens of Clan Smoke Jaguar. Citizens of Clan Smoke Jaguar shall be welcomed in Angelican universities, hospitals, and other facilities, enjoying the same rights as Angelican citizens. In case of legal trouble, Citizens of Clan Smoke Jaguar citizens can be extradicted to Citizens of their own Courts, on the condition that similar rights be extended in the trial process.
Exchange of embassy facilities. The government of Vast Principals will be provided with one of our four-story, spacious and modern embassy facilities in our capital's 'Embassy Row'. These buildings, under construction now on the banks of the Iskur river, are equipped with the modern communications and security systems that modern diplomatic missions demand. We will also offer a similar, but smaller, consular facility in our coastal industrial port city of Varna.
Unlimited port-of-call, fueling, and repair rights at our port city of Varna.
Access to Danube River port of Ruse, with free right of movement of non-military equipment between Varna and Ruse.
Full and unrestricted access to the Angelican Multi-Agency Intelligence Analysis Center, and all intelligence products thereof, including satellite reconnaissance feeds, communications intercepts, airborne intelligence gathering products, and Human Intelligence products.
Of course, the Protectorate is also willing to consider any further requests from Clan Smoke Jaguar.
Clan Smoke Jaguar
13-12-2004, 16:39
The Protectorate of Angelico desires to establish with Clan Smoke Jaguar a lasting commercial and diplomatic partnership. Though the Protectorate is presently of small size, there is a comprehensive and long-term plan for the modernization and expansion of the Angelican Armed Forces. Our nation desires a role as a leader within the Black Sea and Mediterranean Sea communities, rather than a role as an aggressor or conqueror. It is the opinion of the President that the development of a modern, well-trained military is essential to both the establishment of Angelico as a respected state, and for the unification and pride of the Angelican people.
Through extensive research and planning, it has been determined that the optimal method of modernization of the armed forces is through an exclusive contract with a single nation capable of meeting all Protectorate needs. It is obvious to the Protectorate Bureau of Defense Affairs that Clan Smoke Jaguar is the superior choice.
The Protectorate considers the achievement of Nation in Good Standing status with Clan Smoke Jaguar to be of the upmost importance. As such, the Protectorate is prepared to offer the following in return for NGS Status:
Contractual status of Clan Smoke Jaguar as the exclusive supplier of military goods to the Protectorate of Angelico. This contract calls for all military supplies for the expansion of Angelican military forces to be purchased from Clan Smoke Jaguar, unless the needed item is not offered by Clan Smoke Jaguar. With $415,076,000,000 earmarked for Army purchases alone, and equally large sums set aside in future budgets for air and naval purchases, it will be assured that this arrangement will result in a generation's worth of income for Clan Smoke Jaguar, paid off yearly.
Military non-aggression pact and mutual defense pact.
Most Favored Nation Status
Full rights to Citizens of Clan Smoke Jaguar. Citizens of Clan Smoke Jaguar shall be welcomed in Angelican universities, hospitals, and other facilities, enjoying the same rights as Angelican citizens. In case of legal trouble, Citizens of Clan Smoke Jaguar citizens can be extradicted to Citizens of their own Courts, on the condition that similar rights be extended in the trial process.
Exchange of embassy facilities. The government of Vast Principals will be provided with one of our four-story, spacious and modern embassy facilities in our capital's 'Embassy Row'. These buildings, under construction now on the banks of the Iskur river, are equipped with the modern communications and security systems that modern diplomatic missions demand. We will also offer a similar, but smaller, consular facility in our coastal industrial port city of Varna.
Unlimited port-of-call, fueling, and repair rights at our port city of Varna.
Access to Danube River port of Ruse, with free right of movement of non-military equipment between Varna and Ruse.
Full and unrestricted access to the Angelican Multi-Agency Intelligence Analysis Center, and all intelligence products thereof, including satellite reconnaissance feeds, communications intercepts, airborne intelligence gathering products, and Human Intelligence products.
Of course, the Protectorate is also willing to consider any further requests from Clan Smoke Jaguar.
The Free Land of Clan Smoke Jaguar is quite impressed with the Protectorate of Angelico's offer, and we see this as more than sufficient to warrant NGS status. It will take a few weeks for a vote to be cast to make it official, but we expect no problems regarding the acceptance.
OOC: The only thing that makes me curious is that large amount being earmarked for ground forces. Assuming a 1 day = 1 NS year timeline, it will take you about 20 NS years just to put that much into procurement, assuming economy doesn't increase or decrease of course. When combined with the other branches, that would take about 40 NS years to pay it all off. If that's the plan, it's fine, but I just want to make sure it's clarified.
Angelico
13-12-2004, 19:48
OOC: The only thing that makes me curious is that large amount being earmarked for ground forces. Assuming a 1 day = 1 NS year timeline, it will take you about 20 NS years just to put that much into procurement, assuming economy doesn't increase or decrease of course. When combined with the other branches, that would take about 40 NS years to pay it all off. If that's the plan, it's fine, but I just want to make sure it's clarified.
OOC:
I'm seeing these reforms to take about 20-30 NS years, with the country going through a series of pro-business reforms and increasing defense spending versus welfare and other issues to shorten the time. The purchases will be made incrementally, with ground, naval, and air units being brought online at the same time, and thus each branch being given the opportunity to expand over time. The thing is that the armed forces that Angelico inherited at creation from Bulgaria are small and antiquated, so complete replacement is necessary.
Angelico
15-12-2004, 05:20
Bump for CSJ Attention/Confirmation of deal
Golden Falcon
16-12-2004, 22:11
I would like to order the following:
1x LIGHT MECHANIZED INFANTRY DIVISION
Replace M2001A1 Crusader with M2014 Pikeman
Replace AH-64D with AH-1W Supercobra
2x LIGHT INFANTRY DIVISION PACKAGE
Replace AH-1W with RAH-66A Comanche
Replace M119A1 with M2015 Lancer
1x AIRMOBILE INFANTRY DIVISION PACKAGE
Replace AH-64D with AH-1Z Ultracobra
Replace CH-47F with CH-53E Super Stallion
Replace M119A1 with M198
Replace UH-60L with UH-1Y Iroquois
5x ARMORED CAVALRY REGIMENT PACKAGE
Replace M1A2 Abrams with Iron Cheetah II
Replace Mist Lynx Export variants with Mist Lynx
Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker
Replace AH-64D with RAH-66A Comanche
Replace UH-60L with UH-60M
2x REINFORCED MECHANIZED INFANTRY BRIGADE PACKAGE
Replace Iron Cheetah Export with Iron Cheetah
Replace M113A3 variants with M113A4
Replace Mist Lynx Export variants with Mist Lynx
Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker
Replace M577A3 with M4 C2V
2x CORPS HEAVY ARTILLERY BRIGADE
Replace M2001A1 Crusader with M2012 Cavalier
Replace Mist Lynx Export FISTV with Mist Lynx II
Replace M577A3 with M4 C2V
Wirraway
16-12-2004, 22:38
TAG-for later purchases.
Angelico
20-12-2004, 06:05
Bump
Clan Smoke Jaguar
28-12-2004, 00:23
OOC:
I'm seeing these reforms to take about 20-30 NS years, with the country going through a series of pro-business reforms and increasing defense spending versus welfare and other issues to shorten the time. The purchases will be made incrementally, with ground, naval, and air units being brought online at the same time, and thus each branch being given the opportunity to expand over time. The thing is that the armed forces that Angelico inherited at creation from Bulgaria are small and antiquated, so complete replacement is necessary.
After some debate, the Smoke Jaguar Government and CSJMI have agreed to the terms, and granted the nation of Angelico NGS status. We believe that this agreement will be of great benefit to both nations, and may go so far as to facilitate even greater cooperation in the future.
Clan Smoke Jaguar
28-12-2004, 00:24
I would like to order the following:
1x LIGHT MECHANIZED INFANTRY DIVISION
Replace M2001A1 Crusader with M2014 Pikeman
Replace AH-64D with AH-1W Supercobra
2x LIGHT INFANTRY DIVISION PACKAGE
Replace AH-1W with RAH-66A Comanche
Replace M119A1 with M2015 Lancer
1x AIRMOBILE INFANTRY DIVISION PACKAGE
Replace AH-64D with AH-1Z Ultracobra
Replace CH-47F with CH-53E Super Stallion
Replace M119A1 with M198
Replace UH-60L with UH-1Y Iroquois
5x ARMORED CAVALRY REGIMENT PACKAGE
Replace M1A2 Abrams with Iron Cheetah II
Replace Mist Lynx Export variants with Mist Lynx
Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker
Replace AH-64D with RAH-66A Comanche
Replace UH-60L with UH-60M
2x REINFORCED MECHANIZED INFANTRY BRIGADE PACKAGE
Replace Iron Cheetah Export with Iron Cheetah
Replace M113A3 variants with M113A4
Replace Mist Lynx Export variants with Mist Lynx
Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker
Replace M577A3 with M4 C2V
2x CORPS HEAVY ARTILLERY BRIGADE
Replace M2001A1 Crusader with M2012 Cavalier
Replace Mist Lynx Export FISTV with Mist Lynx II
Replace M577A3 with M4 C2V
OOC: Next time, please do your own math. I don't mind doing it with small orders, but big ones like this are a pain, and I only have so much time on my hands (hence this long wait).
IC:
We have confirmed the order, with delivery expected over the next 2 NS years.
Angelico
28-12-2004, 23:15
The Protectorate of Angelico is pleased at Clan Smoke Jaguar's acceptace of our offer and subsequent presentation of NGS status to the Protectorate. The Angelican Parliament has approved the following expenditures to begin the restructuring of the Angelican Armed Forces:
Initial Purchase Order:
Corps Headquarters:
Corps Signals Brigade 500M
Corps Artillery Brigade (Light) 360M
<<Replace M119A1 with M198: +$10 million
Corps Aviation Brigade 7.4B
Corps Engineer Brigade 1.6B
<<Replace M113A3 variants with M113A4: +$35 million
Corps Air Defense Brigade 3.25B
<<*Replace Towed HUMRAAM launchers with Vespa (1152 missiles): +$500 million
Total 13.11B
Composite Airborne Division
Divisional Artillery Brigade (Light) 330M
<<Replace M119A1 with M198: +$30 million
Divisional Air Defense Brigade (Light) 500M
Light Division Aviation Brigade 3.3B
<<Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
LAV Engineer Brigade 410M
<<Replace LAV-AG with LAV-105: +$10 million
Reinforced Airborne Mechanized Brigade Combat Team 1.1B
<<*Replace Kit Fox Export with Kit Fox II: +$25 million
<<*Replace Stormcrow Export variants with Stormcrow II: +$100 million
<<Replace M113A3 variants with M113A4: +$35 million
<<Replace M119A1 with M198: +$10 million
Reinforced Airmobile Infantry Brigade Combat Team 4.6B
<<Replace M119A1 with M198: +$10 million
Reinforced Airborne Brigade 510M
<<Replace M119A1 with M198: +$10 million
Airborne Brigade 100M
Airborne Brigade 100M
Total 10.950 B
Composite Force Projection Division
Divisional Artillery Brigade (Light) 330M
<<Replace M119A1 with M198: +$30 million
Divisional Air Defense Brigade (Light) 500M
Light Division Aviation Brigade 3.3B
<<Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
LAV Engineer Brigade 410M
<<Replace LAV-AG with LAV-105: +$10 million
Light Mechanized Infantry BCT (800M)
Light Mechanized Infantry BCT (800M)
Reinforced Airmobile Infantry Brigade Combat Team 4.6B
<<Replace M119A1 with M198: +$10 million
Light Infantry Brigade 95M
Light Infantry Brigade 95M
Total 10.93B
Composite Force Projection Division
Divisional Artillery Brigade (Light) 330M
<<Replace M119A1 with M198: +$30 million
Divisional Air Defense Brigade (Light) 500M
Light Division Aviation Brigade 3.3B
<<Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
LAV Engineer Brigade 410M
<<Replace LAV-AG with LAV-105: +$10 million
Light Mechanized Infantry BCT (800M)
Light Mechanized Infantry BCT (800M)
Reinforced Airmobile Infantry Brigade Combat Team 4.6B
<<Replace M119A1 with M198: +$10 million
Light Infantry Brigade 95M
Light Infantry Brigade 95M
Total 10.93B
Armored Cavalry Regiment (3.775B)
<<*Replace M1A2 Abrams with Iron Cheetah ADS: +$110 million
<<*Replace Mist Lynx Export variants with Mist Lynx II: +$100 million
<<Replace M113A3 variants with M113A4: +$25 million
<<*Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker II: +$20 Reinforced Light Mechanized Infantry Brigade 1.8B
<<*Replace Stingray II with Stingray IISJ: +$25 million
Armored Division 9.705B
<<*Replace Iron Cheetah Export with Iron Cheetah ADS: +$290 million
<<*Replace M1A2 Abrams with Timberwolf: +$35 million
<<*Replace Mist Lynx Export variants with Mist Lynx: +$300 million
<<Replace M113A3 variants with M113A4: +$80 million
Total 15.28
Total Army Purchases: $61.2 Billion
Clan Smoke Jaguar
29-12-2004, 06:04
The Protectorate of Angelico is pleased at Clan Smoke Jaguar's acceptace of our offer and subsequent presentation of NGS status to the Protectorate. The Angelican Parliament has approved the following expenditures to begin the restructuring of the Angelican Armed Forces:
Initial Purchase Order:
Corps Headquarters:
Corps Signals Brigade 500M
Corps Artillery Brigade (Light) 360M
<<Replace M119A1 with M198: +$10 million
Corps Aviation Brigade 7.4B
Corps Engineer Brigade 1.6B
<<Replace M113A3 variants with M113A4: +$35 million
Corps Air Defense Brigade 3.25B
<<*Replace Towed HUMRAAM launchers with Vespa (1152 missiles): +$500 million
Total 13.11B
Composite Airborne Division
Divisional Artillery Brigade (Light) 330M
<<Replace M119A1 with M198: +$30 million
Divisional Air Defense Brigade (Light) 500M
Light Division Aviation Brigade 3.3B
<<Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
LAV Engineer Brigade 410M
<<Replace LAV-AG with LAV-105: +$10 million
Reinforced Airborne Mechanized Brigade Combat Team 1.1B
<<*Replace Kit Fox Export with Kit Fox II: +$25 million
<<*Replace Stormcrow Export variants with Stormcrow II: +$100 million
<<Replace M113A3 variants with M113A4: +$35 million
<<Replace M119A1 with M198: +$10 million
Reinforced Airmobile Infantry Brigade Combat Team 4.6B
<<Replace M119A1 with M198: +$10 million
Reinforced Airborne Brigade 510M
<<Replace M119A1 with M198: +$10 million
Airborne Brigade 100M
Airborne Brigade 100M
Total 10.950 B
Composite Force Projection Division
Divisional Artillery Brigade (Light) 330M
<<Replace M119A1 with M198: +$30 million
Divisional Air Defense Brigade (Light) 500M
Light Division Aviation Brigade 3.3B
<<Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
LAV Engineer Brigade 410M
<<Replace LAV-AG with LAV-105: +$10 million
Light Mechanized Infantry BCT (800M)
Light Mechanized Infantry BCT (800M)
Reinforced Airmobile Infantry Brigade Combat Team 4.6B
<<Replace M119A1 with M198: +$10 million
Light Infantry Brigade 95M
Light Infantry Brigade 95M
Total 10.93B
Composite Force Projection Division
Divisional Artillery Brigade (Light) 330M
<<Replace M119A1 with M198: +$30 million
Divisional Air Defense Brigade (Light) 500M
Light Division Aviation Brigade 3.3B
<<Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
LAV Engineer Brigade 410M
<<Replace LAV-AG with LAV-105: +$10 million
Light Mechanized Infantry BCT (800M)
Light Mechanized Infantry BCT (800M)
Reinforced Airmobile Infantry Brigade Combat Team 4.6B
<<Replace M119A1 with M198: +$10 million
Light Infantry Brigade 95M
Light Infantry Brigade 95M
Total 10.93B
Armored Cavalry Regiment (3.775B)
<<*Replace M1A2 Abrams with Iron Cheetah ADS: +$110 million
<<*Replace Mist Lynx Export variants with Mist Lynx II: +$100 million
<<Replace M113A3 variants with M113A4: +$25 million
<<*Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker II: +$20 Reinforced Light Mechanized Infantry Brigade 1.8B
<<*Replace Stingray II with Stingray IISJ: +$25 million
Armored Division 9.705B
<<*Replace Iron Cheetah Export with Iron Cheetah ADS: +$290 million
<<*Replace M1A2 Abrams with Timberwolf: +$35 million
<<*Replace Mist Lynx Export variants with Mist Lynx: +$300 million
<<Replace M113A3 variants with M113A4: +$80 million
Total 15.28
Total Army Purchases: $61.2 Billion
We are grateful that the Protectorate is pleased with the arrangement, and are honored that we have been chosen for this major undertaking. The requests of the Protectorate have been noted and confirmed, and we expect delivery of the last unit within 30 NS months.
The government of Tehoma wishes to purchase several packages from your storefront.
We wish to purchase the following:
1-Light Armored Div. (8.5 b)
1-Light Mechanized Div. (8.5 b)
1-Mechanized Airborne Div. (6 b)
1-Airborne Infantry Div. (3.25 b)
1-Armored Div. (9 b)
1-Mechanized Infantry Div. (8.75 b)
1-Urban Combat Div. (9 b)
Total bill 53 billion, wired upon confirmation of order.
Sincerely,
Low-level pencil pusher
Department of Defense
Tehoma
Clan Smoke Jaguar
30-12-2004, 09:11
The government of Tehoma wishes to purchase several packages from your storefront.
We wish to purchase the following:
1-Light Armored Div. (8.5 b)
1-Light Mechanized Div. (8.5 b)
1-Mechanized Airborne Div. (6 b)
1-Airborne Infantry Div. (3.25 b)
1-Armored Div. (9 b)
1-Mechanized Infantry Div. (8.75 b)
1-Urban Combat Div. (9 b)
Total bill 53 billion, wired upon confirmation of order.
Sincerely,
Low-level pencil pusher
Department of Defense
Tehoma
We are happy to announce that the Tehoman request has been approved, and we anticipate delivery of the last unit within 3 NS years
War34534
16-01-2005, 16:27
My nation wishes to purchase Three Armored Divisions at the cost of 27 billion.
Money wired upon confirmation.
War34534
17-01-2005, 15:32
Bump?
To: CSMJ
From: Holy Republic of Hawdawg
Re: Order
With the recent conflict we engaged in. The need for Urban Combat Divisions became very apparent.
We would like to order (10) Urban Combat Divisions with the modification of the order to reflect the Merkava 4SJ (+250 million) instead of the Merkava 4.
Total cost 92.5 billion, wired upon confirmation of order.
Sincerely,
J. Davis
Minister of Defense
Holy Republic of Hawdawg
Clan Smoke Jaguar
21-01-2005, 09:33
My nation wishes to purchase Three Armored Divisions at the cost of 27 billion.
Money wired upon confirmation.
After careful review (and some debate), we have agreed to supply you with the equipment for three complete armored divisions. The estimated time for the arrival of the final shipment is 2 NS years.
To: CSMJ
From: Holy Republic of Hawdawg
Re: Order
With the recent conflict we engaged in. The need for Urban Combat Divisions became very apparent.
We would like to order (10) Urban Combat Divisions with the modification of the order to reflect the Merkava 4SJ (+250 million) instead of the Merkava 4.
Total cost 92.5 billion, wired upon confirmation of order.
Sincerely,
J. Davis
Minister of Defense
Holy Republic of Hawdawg
The request of the Holy Republic of Hawdawg has been reviewed and accepted. We anticipate that the three divisions can be delivered within the space of 3 NS years.
Angelico
29-01-2005, 06:28
Angelican Army Purchase Request
The Protectorate of Angelico General Assembly has authorized the following purchases to be made in order to gradually expand the size of the Angelican Armed Forces to keep pace with the nation’s growing size and defense needs.
The required equipment shall be paid for in equal monthly installments over the duration of the delivery period. The overall order calls for a total of 5 new Army Corps. It is understood that such an order shall take significant time to fill, and is indeed expected.
5x ARMORED DIVISION PACKAGE
$9 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$1 billion
*Replace M1A2 Abrams with Timberwolf: +$35 million
*Replace Mist Lynx Export variants with Mist Lynx: +$300 million
Replace M113A3 variants with M113A4: +$80 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$450 million
*Replace AH-64D with AH-93C: +$850 million
*Replace UH-60L with UH-102 Kestrel: +$740 million
Unit Cost 12.555B
Total Cost 62.775B
4x MECHANIZED INFANTRY DIVISION PACKAGE
$8.75 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$810 million
*Replace M1A2 Abrams with Timberwolf: +$50 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$345 million
Replace M113A3 variants with M113A4: +$85 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$450 million
*Replace AH-64D with AH-93C: +$850 million
*Replace UH-60L with UH-102 Kestrel: +$740 million
Unit Cost 12.15B
Total Cost 48.6B
1x MECHANIZED AIRBORNE DIVISION PACKAGE
$6 billion standard
*Replace Kit Fox Export with Kit Fox II: +$80 million
*Replace Stormcrow Export Variants with Stormcrow II: +$365 million
Replace M113A3 variants with M113A4: +$95 million
*Replace LOSAT with LOSAT II: +$25 million
*Replace M119A1 with M2015 Lancer: +$65 million
*Replace M110A1 with ULH-105: +$9 million
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
*Replace UH-60L with UH-102 Kestrel: +$890 million
Unit Cost 8.679B
Total Cost 8.679B
1x AIRMOBILE INFANTRY DIVISION PACKAGE
$8.3 billion standard
*Replace LOSAT with LOSAT II: +$25 million
*Replace M119A1 with M2015 Lancer: +$65 million
*Replace AH-64D with AH-93C: +$1.275 billion
Replace CH-47F with EH-101 Merlin: Free
*Replace UH-60L with UH-102 Kestrel: +$3 billion
Unit Cost 12.665B
Total Cost 12.665B
2x AIRBORNE INFANTRY DIVISION PACKAGE
$3.25 billion standard
*Replace LOSAT with LOSAT II: +$25 million
*Replace M119A1 with LFH-155: +$55 million
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
*Replace UH-60L with UH-102 Kestrel: +$890 million
Unit Cost 5.37B
Total Cost 10.74B
9x ARMORED CAVALRY REGIMENT PACKAGE
$3.5 billion standard
*Replace M1A2 Abrams with Iron Cheetah ADS: +$110 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$100 million
Replace M113A3 variants with M113A4: +$25 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
Replace M577A3 with M4 C2V: +$90 million
*Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker II: +$20 million
*Replace AH-64D with AH-93C: +$270 million
*Replace UH-60L with UH-102 Kestrel: +$350 million
Unit Cost 4.5B
Total Cost 40.5B
4x LIGHT ARMORED CAVALRY REGIMENT PACKAGE
$2.1 billion standard
*Replace Kit Fox Export with Kit Fox II: +$50 million
*Replace Stormcrow Export variants with Stormcrow II: +$110 million
Replace M113A3 variants with M113A4: +$25 million
*Replace M119A1 with M2015 Lancer: +$25 million
Replace AH-1W with AH-1Z Ultracobra: +$260 million
*Replace UH-60L with UH-102 Kestrel: +$350 million
Unit Cost 2.92B
Total Cost 11.68B
9x ARMORED BRIGADE PACKAGE (Brigade Combat Team)
$1.2 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$410 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$50 million
*Replace M1064 SPM with Stormcrow II SPM: +$50 million
Replace M113A3 variants with M113A4: +$15 million
Replace M577A3 with M4 C2V: +$80 million
Unit Cost 1.805B
Total Cost 16.245B
8x MECHANIZED INFANTRY BRIGADE PACKAGE (Brigade Combat Team)
$1.15 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$205 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$90 million
*Replace M1064 SPM with Stormcrow II SPM: +$50 million
Replace M113A3 variants with M113A4: +$25 million
Replace M577A3 with M4 C2V: +$80 million
Unit Cost 1.6B
Total Cost 12.8B
13x REINFORCED LIGHT MECHANIZED INFANTRY BRIGADE PACKAGE (Brigade Combat Team)
$1.65 billion standard
*Replace Stingray II with Stingray IISJ: +$25 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
Unit Cost 1.71B
Total Cost 22.23B
6x REINFORCED URBAN COMBAT BRIGADE PACKAGE (Brigade Combat Team)
$2.5 billion standard
*Replace Merkava 4 with Merkava 4SJ: +$85 million
*Replace Nova Cat Export variants with Nova Cat II: +$150 million
Replace M113A3 variants with M113A4: +$45 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
*Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker II: +$25 million
Replace M577A3 with M4 C2V: +$150 million
Unit Cost 2.99B
Total Cost 17.94B
18x REINFORCED LIGHT INFANTRY BRIGADE PACKAGE
$450 million standard
*Replace M119A1 with M2015 Lancer: +$25 million
Unit Cost 475M
Total Cost 8.55B
5x CORPS HEAVY ARTILLERY BRIGADE PACKAGE
$650 million standard
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
*Replace Mist Lynx Export FISTV with Mist Lynx II: +$6 million
Replace M577A3 with M4 C2V: +$84 million
Unit Cost 775M
Total Cost 3.875B
2x SSM BRIGADE PACKAGE
$600 million standard
*Replace M51/M52/M1012 & TacTom variants with M56/M57/M1016 & Kodachis: +$550 million
Replace M577A3 with M4 C2V: +$50 million
Unit Cost 1.2B
Total Cost 2.4B
2x *THEATER AIR DEFENSE GROUP PACKAGE ADV (MFN & NGS only)
$11.5 billion standard
Total Cost 23B
5x CORPS AIR DEFENSE BRIGADE PACKAGE
$2.75 billion standard
*Replace Towed HUMRAAM launchers with Vespa (1152 missiles): +$500 million
Unit Cost 3.25B
Total Cost 16.25B
2x THEATER AVIATION GROUP PACKAGE
$6.2 billion standard
Replace CH-47F with EH-101 Merlin: Free
*Replace UH-60L with UH-102 Kestrel: +$1.5 billion
Unit Cost 7.7B
Total Cost 15.4B
5x CORPS AVIATION BRIGADE PACKAGE
$7.4 billion standard
*Replace AH-64D with AH-93C: +$1.26 billion
Replace CH-47F with EH-101 Merlin: Free
*Replace UH-60L with UH-102 Kestrel: +$2 billion
Unit Cost 10.66B
Total Cost 53.3B
5x CORPS ENGINEER BRIGADE PACKAGE
$1.25 billion standard
Replace M113A3 variants with M113A4: +$35 million
Replace M577A3 with M4 C2V: +$25 million
Unit Cost 1.31B
Total Cost 6.55B
5x CORPS SIGNAL BRIGADE PACKAGE
$500 million
Total Cost 2.5B
14x LIGHT INFANTRY BRIGADE PACKAGE
$95 million
Total Cost 1.33B
4x DIVISIONAL ARTILLERY BRIGADE PACKAGE (Heavy)
$1.2 billion standard
*Replace Mist Lynx Export FISTV with Mist Lynx II: +$20 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$90 million
Unit Cost 1.41B
Total Cost 5.64B
8x DIVISIONAL ARTILLERY BRIGADE PACKAGE (Light)
$300 million standard
*Replace M119A1 with M2015 Lancer: +$75 million
Unit Cost 375M
Total Cost 3B
4x DIVISIONAL AIR DEFENSE BRIGADE PACKAGE (Heavy)
$1 billion standard
*Replace Mist Lynx Linebacker Export with Mist Lynx II: +$50 million
*Replace Mist Lynx Export with Mist Lynx II: +$10 million
Replace M577A3 with M4 C2V: +$30 million
Unit Cost 1.09B
Total Cost 4.36B
8x DIVISIONAL AIR DEFENSE BRIGADE PACKAGE (Light)
$500 million standard
Total Cost 4B
4x HEAVY DIVISION AVIATION BRIGADE
$2.9 billion standard
*Replace M1A2 Abrams with Timberwolf: +$35 million
*Replace Mist Lynx Export CFV with Mist Lynx II CFV: +$30 million
Replace M577A3 with M4 C2V: +$20 million
Replace M113A3 variants with M113A4: +$3 million
*Replace AH-64D with AH-93C: +$850 million
*Replace UH-60L with UH-102 Kestrel: +$740 million
Unit Cost 4.578B
Total Cost 18.312B
8x LIGHT DIVISION AVIATION BRIGADE
$2.15 billion standard
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
*Replace UH-60L with UH-102 Kestrel: +$890 million
Unit Cost 4.19B
Total Cost 33.52B
4x COMBAT ENGINEER BRIGADE PACKAGE
$800 million standard
Replace M113A3 variants with M113A4: +$30 million
Replace M577A3 with M4 C2V: +$40 million
Unit Cost 870M
Total Cost 3.48B
8x LAV ENGINEER BRIGADE
$400 million standard
Replace LAV-AG with LAV-105: +$10 million
Unit Cost 410M
Total Cost 3.28B
Total Army Cost: $473,601,000,000.00B
Clan Smoke Jaguar
30-01-2005, 01:28
Angelican Army Purchase Request
The Protectorate of Angelico General Assembly has authorized the following purchases to be made in order to gradually expand the size of the Angelican Armed Forces to keep pace with the nation’s growing size and defense needs.
The required equipment shall be paid for in equal monthly installments over the duration of the delivery period. The overall order calls for a total of 5 new Army Corps. It is understood that such an order shall take significant time to fill, and is indeed expected.
5x ARMORED DIVISION PACKAGE
$9 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$1 billion
*Replace M1A2 Abrams with Timberwolf: +$35 million
*Replace Mist Lynx Export variants with Mist Lynx: +$300 million
Replace M113A3 variants with M113A4: +$80 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$450 million
*Replace AH-64D with AH-93C: +$850 million
*Replace UH-60L with UH-102 Kestrel: +$740 million
Unit Cost 12.555B
Total Cost 62.775B
4x MECHANIZED INFANTRY DIVISION PACKAGE
$8.75 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$810 million
*Replace M1A2 Abrams with Timberwolf: +$50 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$345 million
Replace M113A3 variants with M113A4: +$85 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$450 million
*Replace AH-64D with AH-93C: +$850 million
*Replace UH-60L with UH-102 Kestrel: +$740 million
Unit Cost 12.15B
Total Cost 48.6B
1x MECHANIZED AIRBORNE DIVISION PACKAGE
$6 billion standard
*Replace Kit Fox Export with Kit Fox II: +$80 million
*Replace Stormcrow Export Variants with Stormcrow II: +$365 million
Replace M113A3 variants with M113A4: +$95 million
*Replace LOSAT with LOSAT II: +$25 million
*Replace M119A1 with M2015 Lancer: +$65 million
*Replace M110A1 with ULH-105: +$9 million
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
*Replace UH-60L with UH-102 Kestrel: +$890 million
Unit Cost 8.679B
Total Cost 8.679B
1x AIRMOBILE INFANTRY DIVISION PACKAGE
$8.3 billion standard
*Replace LOSAT with LOSAT II: +$25 million
*Replace M119A1 with M2015 Lancer: +$65 million
*Replace AH-64D with AH-93C: +$1.275 billion
Replace CH-47F with EH-101 Merlin: Free
*Replace UH-60L with UH-102 Kestrel: +$3 billion
Unit Cost 12.665B
Total Cost 12.665B
2x AIRBORNE INFANTRY DIVISION PACKAGE
$3.25 billion standard
*Replace LOSAT with LOSAT II: +$25 million
*Replace M119A1 with LFH-155: +$55 million
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
*Replace UH-60L with UH-102 Kestrel: +$890 million
Unit Cost 5.37B
Total Cost 10.74B
9x ARMORED CAVALRY REGIMENT PACKAGE
$3.5 billion standard
*Replace M1A2 Abrams with Iron Cheetah ADS: +$110 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$100 million
Replace M113A3 variants with M113A4: +$25 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
Replace M577A3 with M4 C2V: +$90 million
*Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker II: +$20 million
*Replace AH-64D with AH-93C: +$270 million
*Replace UH-60L with UH-102 Kestrel: +$350 million
Unit Cost 4.5B
Total Cost 40.5B
4x LIGHT ARMORED CAVALRY REGIMENT PACKAGE
$2.1 billion standard
*Replace Kit Fox Export with Kit Fox II: +$50 million
*Replace Stormcrow Export variants with Stormcrow II: +$110 million
Replace M113A3 variants with M113A4: +$25 million
*Replace M119A1 with M2015 Lancer: +$25 million
Replace AH-1W with AH-1Z Ultracobra: +$260 million
*Replace UH-60L with UH-102 Kestrel: +$350 million
Unit Cost 2.92B
Total Cost 11.68B
9x ARMORED BRIGADE PACKAGE (Brigade Combat Team)
$1.2 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$410 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$50 million
*Replace M1064 SPM with Stormcrow II SPM: +$50 million
Replace M113A3 variants with M113A4: +$15 million
Replace M577A3 with M4 C2V: +$80 million
Unit Cost 1.805B
Total Cost 16.245B
8x MECHANIZED INFANTRY BRIGADE PACKAGE (Brigade Combat Team)
$1.15 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$205 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$90 million
*Replace M1064 SPM with Stormcrow II SPM: +$50 million
Replace M113A3 variants with M113A4: +$25 million
Replace M577A3 with M4 C2V: +$80 million
Unit Cost 1.6B
Total Cost 12.8B
13x REINFORCED LIGHT MECHANIZED INFANTRY BRIGADE PACKAGE (Brigade Combat Team)
$1.65 billion standard
*Replace Stingray II with Stingray IISJ: +$25 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
Unit Cost 1.71B
Total Cost 22.23B
6x REINFORCED URBAN COMBAT BRIGADE PACKAGE (Brigade Combat Team)
$2.5 billion standard
*Replace Merkava 4 with Merkava 4SJ: +$85 million
*Replace Nova Cat Export variants with Nova Cat II: +$150 million
Replace M113A3 variants with M113A4: +$45 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
*Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker II: +$25 million
Replace M577A3 with M4 C2V: +$150 million
Unit Cost 2.99B
Total Cost 17.94B
18x REINFORCED LIGHT INFANTRY BRIGADE PACKAGE
$450 million standard
*Replace M119A1 with M2015 Lancer: +$25 million
Unit Cost 475M
Total Cost 8.55B
5x CORPS HEAVY ARTILLERY BRIGADE PACKAGE
$650 million standard
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
*Replace Mist Lynx Export FISTV with Mist Lynx II: +$6 million
Replace M577A3 with M4 C2V: +$84 million
Unit Cost 775M
Total Cost 3.875B
2x SSM BRIGADE PACKAGE
$600 million standard
*Replace M51/M52/M1012 & TacTom variants with M56/M57/M1016 & Kodachis: +$550 million
Replace M577A3 with M4 C2V: +$50 million
Unit Cost 1.2B
Total Cost 2.4B
2x *THEATER AIR DEFENSE GROUP PACKAGE ADV (MFN & NGS only)
$11.5 billion standard
Total Cost 23B
5x CORPS AIR DEFENSE BRIGADE PACKAGE
$2.75 billion standard
*Replace Towed HUMRAAM launchers with Vespa (1152 missiles): +$500 million
Unit Cost 3.25B
Total Cost 16.25B
2x THEATER AVIATION GROUP PACKAGE
$6.2 billion standard
Replace CH-47F with EH-101 Merlin: Free
*Replace UH-60L with UH-102 Kestrel: +$1.5 billion
Unit Cost 7.7B
Total Cost 15.4B
5x CORPS AVIATION BRIGADE PACKAGE
$7.4 billion standard
*Replace AH-64D with AH-93C: +$1.26 billion
Replace CH-47F with EH-101 Merlin: Free
*Replace UH-60L with UH-102 Kestrel: +$2 billion
Unit Cost 10.66B
Total Cost 53.3B
5x CORPS ENGINEER BRIGADE PACKAGE
$1.25 billion standard
Replace M113A3 variants with M113A4: +$35 million
Replace M577A3 with M4 C2V: +$25 million
Unit Cost 1.31B
Total Cost 6.55B
5x CORPS SIGNAL BRIGADE PACKAGE
$500 million
Total Cost 2.5B
14x LIGHT INFANTRY BRIGADE PACKAGE
$95 million
Total Cost 1.33B
4x DIVISIONAL ARTILLERY BRIGADE PACKAGE (Heavy)
$1.2 billion standard
*Replace Mist Lynx Export FISTV with Mist Lynx II: +$20 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$90 million
Unit Cost 1.41B
Total Cost 5.64B
8x DIVISIONAL ARTILLERY BRIGADE PACKAGE (Light)
$300 million standard
*Replace M119A1 with M2015 Lancer: +$75 million
Unit Cost 375M
Total Cost 3B
4x DIVISIONAL AIR DEFENSE BRIGADE PACKAGE (Heavy)
$1 billion standard
*Replace Mist Lynx Linebacker Export with Mist Lynx II: +$50 million
*Replace Mist Lynx Export with Mist Lynx II: +$10 million
Replace M577A3 with M4 C2V: +$30 million
Unit Cost 1.09B
Total Cost 4.36B
8x DIVISIONAL AIR DEFENSE BRIGADE PACKAGE (Light)
$500 million standard
Total Cost 4B
4x HEAVY DIVISION AVIATION BRIGADE
$2.9 billion standard
*Replace M1A2 Abrams with Timberwolf: +$35 million
*Replace Mist Lynx Export CFV with Mist Lynx II CFV: +$30 million
Replace M577A3 with M4 C2V: +$20 million
Replace M113A3 variants with M113A4: +$3 million
*Replace AH-64D with AH-93C: +$850 million
*Replace UH-60L with UH-102 Kestrel: +$740 million
Unit Cost 4.578B
Total Cost 18.312B
8x LIGHT DIVISION AVIATION BRIGADE
$2.15 billion standard
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
*Replace UH-60L with UH-102 Kestrel: +$890 million
Unit Cost 4.19B
Total Cost 33.52B
4x COMBAT ENGINEER BRIGADE PACKAGE
$800 million standard
Replace M113A3 variants with M113A4: +$30 million
Replace M577A3 with M4 C2V: +$40 million
Unit Cost 870M
Total Cost 3.48B
8x LAV ENGINEER BRIGADE
$400 million standard
Replace LAV-AG with LAV-105: +$10 million
Unit Cost 410M
Total Cost 3.28B
Total Army Cost: $473,601,000,000.00B
We in CSJMI are happy to announce that the request has been accepted, though it is expected that it will indeed take upwards of 10 NS years to fill this (equipment for 45 equivalent divisions after all . . . ).
Vast Principles
03-02-2005, 18:14
OOC: CSJ, do you still have your other storefronts up and running/ If so, you might want to look at sorting out the links(i could do with extra purchases to my air force)
Angelico
04-02-2005, 02:39
OOC--
Vast Principles-- In the mean time, use the links from
http://forums2.jolt.co.uk/showthread.php?t=281544&highlight=clan+smoke+jaguar
to get to all of CSJ's storefronts.
These are the only links that are working right now, I think.
Clan Smoke Jaguar
16-02-2005, 07:06
OOC: I updated the basic equipment storefronts (ground, air, naval, munitions, etc), and the proper links were placed in them.
The package ones, however, need some major overhauls and I just never got around to them. Hopefully, that'll change soon enough.
To: CSMJ
From: Holy Republic of Hawdawg
Our navy after being thoroughly happy with CSMJ products has convinced us to use your store exclusively for military weapons purchases. Since we are mainly in the business of making ammunition, we will look to you for our armaments. We are in the process of a huge upgrade/retooling of our armies divisions. We will need the following packages:
(20) ARMORED DIVISION PACKAGE
Standard Cost 9 Billion
Upgrades we would like:
Replace M1A2 Abrams with M1A2 SEP: +$5.5 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Replace AH-64D with RAH-66A Comanche: +$50 million
Total Cost 189.51 Billion
(20) LIGHT ARMORED DIVISION PACKAGE
Standard Cost 8.5 Billion
Upgrades we would like:
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Total Cost 179.4 Billion
(10) MECHANIZED INFANTRY DIVISION PACKAGE
Standard Cost 8.75 Billion
Upgrades we would like:
*Replace Iron Cheetah Export with Iron Cheetah II: +$810 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$345 million
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Total Cost 103.75 Billion
(10) LIGHT MECHANIZED INFANTRY DIVISION PACKAGE
Upgrades we would like:
*Replace Stingray II with Stingray IISJ: +$120 million
*Replace Kit Fox Export with Kit Fox: +$10 million
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Total Cost 91 Billion
(10) MECHANIZED AIRBORNE DIVISION PACKAGE
Upgrades we would like:
*Replace Kit Fox Export with Kit Fox II: +$80 million
*Replace Stormcrow Export Variants with Stormcrow II: +$365 million
*Replace LOSAT with LOSAT II: +$25 million
Replace AH-1W with RAH-66A Comanche: +$1.45 billion
Replace OH-58D with RAH-66A Comanche: +$625 million
Total Cost 35.45 Billion
(10) AIRBORNE INFANTRY DIVISION PACKAGE
Upgrades we would like:
*Replace LOSAT with LOSAT II: +$25 million
Replace AH-1W with RAH-66A Comanche: +$1.45 million
Replace OH-58D with RAH-66A Comanche: +$625 million
Total Cost 41.52 Billion
The total cost of this order is 640.63 Billion and will be wired upon confirmation of the order. We look forward to dealing with you in the future as our newly selected exclusive armaments supplier.
Sincerely,
J. Davis
Minister of Defense
Holy Republic of Hawdawg
Clan Smoke Jaguar
09-03-2005, 15:36
To: CSMJ
From: Holy Republic of Hawdawg
Our navy after being thoroughly happy with CSMJ products has convinced us to use your store exclusively for military weapons purchases. Since we are mainly in the business of making ammunition, we will look to you for our armaments. We are in the process of a huge upgrade/retooling of our armies divisions. We will need the following packages:
(20) ARMORED DIVISION PACKAGE
Standard Cost 9 Billion
Upgrades we would like:
Replace M1A2 Abrams with M1A2 SEP: +$5.5 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Replace AH-64D with RAH-66A Comanche: +$50 million
Total Cost 189.51 Billion
(20) LIGHT ARMORED DIVISION PACKAGE
Standard Cost 8.5 Billion
Upgrades we would like:
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Total Cost 179.4 Billion
(10) MECHANIZED INFANTRY DIVISION PACKAGE
Standard Cost 8.75 Billion
Upgrades we would like:
*Replace Iron Cheetah Export with Iron Cheetah II: +$810 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$345 million
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Total Cost 103.75 Billion
(10) LIGHT MECHANIZED INFANTRY DIVISION PACKAGE
Upgrades we would like:
*Replace Stingray II with Stingray IISJ: +$120 million
*Replace Kit Fox Export with Kit Fox: +$10 million
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Total Cost 91 Billion
(10) MECHANIZED AIRBORNE DIVISION PACKAGE
Upgrades we would like:
*Replace Kit Fox Export with Kit Fox II: +$80 million
*Replace Stormcrow Export Variants with Stormcrow II: +$365 million
*Replace LOSAT with LOSAT II: +$25 million
Replace AH-1W with RAH-66A Comanche: +$1.45 billion
Replace OH-58D with RAH-66A Comanche: +$625 million
Total Cost 35.45 Billion
(10) AIRBORNE INFANTRY DIVISION PACKAGE
Upgrades we would like:
*Replace LOSAT with LOSAT II: +$25 million
Replace AH-1W with RAH-66A Comanche: +$1.45 million
Replace OH-58D with RAH-66A Comanche: +$625 million
Total Cost 41.52 Billion
The total cost of this order is 640.63 Billion and will be wired upon confirmation of the order. We look forward to dealing with you in the future as our newly selected exclusive armaments supplier.
Sincerely,
J. Davis
Minister of Defense
Holy Republic of Hawdawg
Though this request is indeed a massive undertaking, requiring some 80 divisions worth of equipment, we are nonetheless willing to negotiate this all at once considering Hawdawg's previous record. Due to the number and types of units requested, we anticipate that it will take somewhere from 15 to 20 years to completely fill the order, depending on the other orders we receive for ground equipments.
CSMJ stated:
Though this request is indeed a massive undertaking, requiring some 80 divisions worth of equipment, we are nonetheless willing to negotiate this all at once considering Hawdawg's previous record. Due to the number and types of units requested, we anticipate that it will take somewhere from 15 to 20 years to completely fill the order, depending on the other orders we receive for ground equipments.
Thank you, we fully expected a lengthy time frame for total fulfillment of the order. Due to the high quality and excellent performance of your equipment, we feel the wait is very worthwhile. The money was wired this morning to your Account. In addition, a 2 Billion dollar TIP has been included in the transfer.
Sincerely,
J Davis
Minister of Defense
Holy Republic of Hawdawg
To: CSMJ
From: Holy Republic of Hawdawg
Re: New Division
Our War Ministry has requested we seek out companies with the expertise in building divisions to assist us with two projects. Since we have selected your company as our "exclusive" supplier we come to for assistance. We are looking for a division to be built specifically as a Combat Engineer Division similiar to the old "SeaBees" units of lore. We are also looking for a fully functional Marine Division to be capable of 48 hour deployment upon notification. We hope that your company can assemble a team to R&D these concepts and make them a reality for our military. We are willing to provide Research and Development funding to your company for these tasks. In addition we would be interested in purchasing several divisions similiar to our previous order to update our Amphibious and Construction capabilities. We look forward to hearing from you.
Sincerely,
Jefferson Davis
Minister of Defense
Holy Republic of Hawdawg
Clan Smoke Jaguar
16-03-2005, 23:12
To: CSMJ
From: Holy Republic of Hawdawg
Re: New Division
Our War Ministry has requested we seek out companies with the expertise in building divisions to assist us with two projects. Since we have selected your company as our "exclusive" supplier we come to for assistance. We are looking for a division to be built specifically as a Combat Engineer Division similiar to the old "SeaBees" units of lore. We are also looking for a fully functional Marine Division to be capable of 48 hour deployment upon notification. We hope that your company can assemble a team to R&D these concepts and make them a reality for our military. We are willing to provide Research and Development funding to your company for these tasks. In addition we would be interested in purchasing several divisions similiar to our previous order to update our Amphibious and Construction capabilities. We look forward to hearing from you.
Sincerely,
Jefferson Davis
Minister of Defense
Holy Republic of Hawdawg
We are honoered that the Holy Republic of Hawdawg has chosen to come to us to provide for their additional needs. To that end, we are placing a significant effort into this endeaor, and indeed already have the preliminary work done for the Marine Division. The Engineering unit will take some time to look into, but we are hopeful that we can provide something desirable there as well.
Preliminary information for Marine Division
SUBORDINATE UNITS:
1 Divisional HQ
3xMarine Regiment (9 battalions)
1xTank Battalion
1xLight Armored Assault/Recon Battalion
1xAssault Amphibian Battalion
1xRecon Battalion
1xCombat Engineer Battalion
1xArtillery Regiment (3 battalions)
2xLAV-AD Platoon
Total Personnel: 15,983 + 914 Navy
MAJOR EQUIPMENT
58xM1A1
144xAAV7A1
68xLAV-IV
16xLAV-AT
8xLAV-M
40xLAV-AD
12xLAV-CC
14xLAV-L
8xLAV-ARV
54xM198 155mm TH
9xM88A2 ARV
4xAVLB
1207xAssorted HMMWV
268xAssorted Truck
Note that the division, at present, has no integral aviation assets (which also helps account for the small size). Our research suggests that similar forces, due to the fact that there is a dedicated (and trusted) aviation arm, maintain their helicopter forces in separate aviation units that are attached to the divisions. If desired, these can be provided as well.
This force would require 1-2 of our Amphibious Groups to transport and deliver, depending on the amount of supplies and the specific vessels purchased.
OOC: The Engineer Division is a ground up thing, so it will take awhile. The actual Seabee units weren't full divisions, instead they would have Brigades with 2 or more Regiments, each of 2 or more battalions. Divisions would have multiple brigades plus additional support troops.
While they merged the two brigades into a single "division" three years ago, it has an active strength of only 2 regiments (though with 4 in reserve). However, it's important to note that Naval Construction Battalions (aka CBs or Seabees) are merely heavy construction units tasked with building infrastructure such as base facilities and airfields. In WWII, they fought when they had to, but were using mostly civilian equipment and rarely went looking for combat, though they made good use of their construction equipment when such situations arose.
Combat Engineers, on the other hand, are equipped for actual fighting, and would be much more likely to hold out against a determined attack, but lack the heavy equipment (their role is creating and clearing obstacles).
Combat Engineer, I can do, though with a little work. Seabees, I don't know if I can get the info. I haven't found any sign of rosters or TOEs, so I can't even tell you how many men are in a unit, and the information might not be readily available to me.
Duke Barol
16-03-2005, 23:47
5x ARMORED DIVISION PACKAGE
$9 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$1 billion
*Replace M1A2 Abrams with Timberwolf: +$35 million
*Replace Mist Lynx Export variants with Mist Lynx: +$300 million
Replace M113A3 variants with M113A4: +$80 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$450 million
*Replace AH-64D with AH-93C: +$850 million
*Replace UH-60L with UH-102 Kestrel: +$740 million
Unit Cost 12.555B
Total Cost 62.775B
4x MECHANIZED INFANTRY DIVISION PACKAGE
$8.75 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$810 million
*Replace M1A2 Abrams with Timberwolf: +$50 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$345 million
Replace M113A3 variants with M113A4: +$85 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$450 million
*Replace AH-64D with AH-93C: +$850 million
*Replace UH-60L with UH-102 Kestrel: +$740 million
Unit Cost 12.15B
Total Cost 48.6B
1x MECHANIZED AIRBORNE DIVISION PACKAGE
$6 billion standard
*Replace Kit Fox Export with Kit Fox II: +$80 million
*Replace Stormcrow Export Variants with Stormcrow II: +$365 million
Replace M113A3 variants with M113A4: +$95 million
*Replace LOSAT with LOSAT II: +$25 million
*Replace M119A1 with M2015 Lancer: +$65 million
*Replace M110A1 with ULH-105: +$9 million
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
*Replace UH-60L with UH-102 Kestrel: +$890 million
Unit Cost 8.679B
Total Cost 8.679B
1x AIRMOBILE INFANTRY DIVISION PACKAGE
$8.3 billion standard
*Replace LOSAT with LOSAT II: +$25 million
*Replace M119A1 with M2015 Lancer: +$65 million
*Replace AH-64D with AH-93C: +$1.275 billion
Replace CH-47F with EH-101 Merlin: Free
*Replace UH-60L with UH-102 Kestrel: +$3 billion
Unit Cost 12.665B
Total Cost 12.665B
2x AIRBORNE INFANTRY DIVISION PACKAGE
$3.25 billion standard
*Replace LOSAT with LOSAT II: +$25 million
*Replace M119A1 with LFH-155: +$55 million
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
*Replace UH-60L with UH-102 Kestrel: +$890 million
Unit Cost 5.37B
Total Cost 10.74B
9x ARMORED CAVALRY REGIMENT PACKAGE
$3.5 billion standard
*Replace M1A2 Abrams with Iron Cheetah ADS: +$110 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$100 million
Replace M113A3 variants with M113A4: +$25 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
Replace M577A3 with M4 C2V: +$90 million
*Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker II: +$20 million
*Replace AH-64D with AH-93C: +$270 million
*Replace UH-60L with UH-102 Kestrel: +$350 million
Unit Cost 4.5B
Total Cost 40.5B
4x LIGHT ARMORED CAVALRY REGIMENT PACKAGE
$2.1 billion standard
*Replace Kit Fox Export with Kit Fox II: +$50 million
*Replace Stormcrow Export variants with Stormcrow II: +$110 million
Replace M113A3 variants with M113A4: +$25 million
*Replace M119A1 with M2015 Lancer: +$25 million
Replace AH-1W with AH-1Z Ultracobra: +$260 million
*Replace UH-60L with UH-102 Kestrel: +$350 million
Unit Cost 2.92B
Total Cost 11.68B
9x ARMORED BRIGADE PACKAGE (Brigade Combat Team)
$1.2 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$410 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$50 million
*Replace M1064 SPM with Stormcrow II SPM: +$50 million
Replace M113A3 variants with M113A4: +$15 million
Replace M577A3 with M4 C2V: +$80 million
Unit Cost 1.805B
Total Cost 16.245B
8x MECHANIZED INFANTRY BRIGADE PACKAGE (Brigade Combat Team)
$1.15 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$205 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$90 million
*Replace M1064 SPM with Stormcrow II SPM: +$50 million
Replace M113A3 variants with M113A4: +$25 million
Replace M577A3 with M4 C2V: +$80 million
Unit Cost 1.6B
Total Cost 12.8B
13x REINFORCED LIGHT MECHANIZED INFANTRY BRIGADE PACKAGE (Brigade Combat Team)
$1.65 billion standard
*Replace Stingray II with Stingray IISJ: +$25 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
Unit Cost 1.71B
Total Cost 22.23B
6x REINFORCED URBAN COMBAT BRIGADE PACKAGE (Brigade Combat Team)
$2.5 billion standard
*Replace Merkava 4 with Merkava 4SJ: +$85 million
*Replace Nova Cat Export variants with Nova Cat II: +$150 million
Replace M113A3 variants with M113A4: +$45 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
*Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker II: +$25 million
Replace M577A3 with M4 C2V: +$150 million
Unit Cost 2.99B
Total Cost 17.94B
18x REINFORCED LIGHT INFANTRY BRIGADE PACKAGE
$450 million standard
*Replace M119A1 with M2015 Lancer: +$25 million
Unit Cost 475M
Total Cost 8.55B
5x CORPS HEAVY ARTILLERY BRIGADE PACKAGE
$650 million standard
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
*Replace Mist Lynx Export FISTV with Mist Lynx II: +$6 million
Replace M577A3 with M4 C2V: +$84 million
Unit Cost 775M
Total Cost 3.875B
2x SSM BRIGADE PACKAGE
$600 million standard
*Replace M51/M52/M1012 & TacTom variants with M56/M57/M1016 & Kodachis: +$550 million
Replace M577A3 with M4 C2V: +$50 million
Unit Cost 1.2B
Total Cost 2.4B
2x *THEATER AIR DEFENSE GROUP PACKAGE ADV (MFN & NGS only)
$11.5 billion standard
Total Cost 23B
5x CORPS AIR DEFENSE BRIGADE PACKAGE
$2.75 billion standard
*Replace Towed HUMRAAM launchers with Vespa (1152 missiles): +$500 million
Unit Cost 3.25B
Total Cost 16.25B
2x THEATER AVIATION GROUP PACKAGE
$6.2 billion standard
Replace CH-47F with EH-101 Merlin: Free
*Replace UH-60L with UH-102 Kestrel: +$1.5 billion
Unit Cost 7.7B
Total Cost 15.4B
5x CORPS AVIATION BRIGADE PACKAGE
$7.4 billion standard
*Replace AH-64D with AH-93C: +$1.26 billion
Replace CH-47F with EH-101 Merlin: Free
*Replace UH-60L with UH-102 Kestrel: +$2 billion
Unit Cost 10.66B
Total Cost 53.3B
5x CORPS ENGINEER BRIGADE PACKAGE
$1.25 billion standard
Replace M113A3 variants with M113A4: +$35 million
Replace M577A3 with M4 C2V: +$25 million
Unit Cost 1.31B
Total Cost 6.55B
5x CORPS SIGNAL BRIGADE PACKAGE
$500 million
Total Cost 2.5B
14x LIGHT INFANTRY BRIGADE PACKAGE
$95 million
Total Cost 1.33B
4x DIVISIONAL ARTILLERY BRIGADE PACKAGE (Heavy)
$1.2 billion standard
*Replace Mist Lynx Export FISTV with Mist Lynx II: +$20 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$90 million
Unit Cost 1.41B
Total Cost 5.64B
8x DIVISIONAL ARTILLERY BRIGADE PACKAGE (Light)
$300 million standard
*Replace M119A1 with M2015 Lancer: +$75 million
Unit Cost 375M
Total Cost 3B
4x DIVISIONAL AIR DEFENSE BRIGADE PACKAGE (Heavy)
$1 billion standard
*Replace Mist Lynx Linebacker Export with Mist Lynx II: +$50 million
*Replace Mist Lynx Export with Mist Lynx II: +$10 million
Replace M577A3 with M4 C2V: +$30 million
Unit Cost 1.09B
Total Cost 4.36B
8x DIVISIONAL AIR DEFENSE BRIGADE PACKAGE (Light)
$500 million standard
Total Cost 4B
4x HEAVY DIVISION AVIATION BRIGADE
$2.9 billion standard
*Replace M1A2 Abrams with Timberwolf: +$35 million
*Replace Mist Lynx Export CFV with Mist Lynx II CFV: +$30 million
Replace M577A3 with M4 C2V: +$20 million
Replace M113A3 variants with M113A4: +$3 million
*Replace AH-64D with AH-93C: +$850 million
*Replace UH-60L with UH-102 Kestrel: +$740 million
Unit Cost 4.578B
Total Cost 18.312B
8x LIGHT DIVISION AVIATION BRIGADE
$2.15 billion standard
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
*Replace UH-60L with UH-102 Kestrel: +$890 million
Unit Cost 4.19B
Total Cost 33.52B
4x COMBAT ENGINEER BRIGADE PACKAGE
$800 million standard
Replace M113A3 variants with M113A4: +$30 million
Replace M577A3 with M4 C2V: +$40 million
Unit Cost 870M
Total Cost 3.48B
8x LAV ENGINEER BRIGADE
$400 million standard
Replace LAV-AG with LAV-105: +$10 million
Unit Cost 410M
Total Cost 3.28B
1 ARMORED DIVISION PACKAGE
1 ARMORED BATTALION PACKAGE
1 FIGHTER SQUADRON PACKAGE I also want an adition of 30 F-22's
1 MULTIROLE FIGHTER SQUADRON PACKAGE
1 HEAVY BOMBER SQUADRON PACKAGE
Can you also put together a carrier, infultration, and stealth package
I added an extra 250 billion for those.
how long is 1 ns year?
Total Army Cost: $473,751,000,000.00B
i stole this from someone who posted earlier
yet it fits my needs quite well
mony will be wired upon request
Duke Barol
Please tg me if you can
Al-Sabir
17-03-2005, 20:36
With the separate military branch status of the Al-Sabirian Arab Marine Corps being abolished due to deficiencies in the force structure and equipment, which rendered the conduction of effective combat operations impossible, as seen in recent conflicts at home and abroad, I, General Rafiq Fikri Zayn, chairman of the Joint Chiefs of Staff, hereby officially issue a request for proposals for the new table of organization and equipment of the yet-to-be-established naval infantry brigades, which will fulfill essentially the same role as the Arab Marine Corps, but under the sails of the Arab Navy. However, the staunch habits and traditions of the AMC are rendering simple transition of command impossible, so fresh units and equipment are an absolute must. Raw combat power, interoperability with coastal defence units, modular organization structure, so that up to three brigades can easily be linked into one division depending on the situation, an integrated rotary aviation battalion, compatible with the hangar capacities on Clan Smoke Jaguar's amphibious groups, and advanced Smoke Jaguar equipment are definite prerequisites. I'm convinced that CSJMI can fulfill our expectations and can even exceed those, as you have always done.
Awaiting Reply,
General Rafiq Fikri Zayn
Duke Barol
18-03-2005, 03:44
My supply list is a quite urgent necessity as i am going to war quite soon. The sooner you respond, the better.
Clan Smoke Jaguar
18-03-2005, 08:12
5x ARMORED DIVISION PACKAGE
$9 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$1 billion
*Replace M1A2 Abrams with Timberwolf: +$35 million
*Replace Mist Lynx Export variants with Mist Lynx: +$300 million
Replace M113A3 variants with M113A4: +$80 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$450 million
*Replace AH-64D with AH-93C: +$850 million
*Replace UH-60L with UH-102 Kestrel: +$740 million
Unit Cost 12.555B
Total Cost 62.775B
4x MECHANIZED INFANTRY DIVISION PACKAGE
$8.75 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$810 million
*Replace M1A2 Abrams with Timberwolf: +$50 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$345 million
Replace M113A3 variants with M113A4: +$85 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$450 million
*Replace AH-64D with AH-93C: +$850 million
*Replace UH-60L with UH-102 Kestrel: +$740 million
Unit Cost 12.15B
Total Cost 48.6B
1x MECHANIZED AIRBORNE DIVISION PACKAGE
$6 billion standard
*Replace Kit Fox Export with Kit Fox II: +$80 million
*Replace Stormcrow Export Variants with Stormcrow II: +$365 million
Replace M113A3 variants with M113A4: +$95 million
*Replace LOSAT with LOSAT II: +$25 million
*Replace M119A1 with M2015 Lancer: +$65 million
*Replace M110A1 with ULH-105: +$9 million
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
*Replace UH-60L with UH-102 Kestrel: +$890 million
Unit Cost 8.679B
Total Cost 8.679B
1x AIRMOBILE INFANTRY DIVISION PACKAGE
$8.3 billion standard
*Replace LOSAT with LOSAT II: +$25 million
*Replace M119A1 with M2015 Lancer: +$65 million
*Replace AH-64D with AH-93C: +$1.275 billion
Replace CH-47F with EH-101 Merlin: Free
*Replace UH-60L with UH-102 Kestrel: +$3 billion
Unit Cost 12.665B
Total Cost 12.665B
2x AIRBORNE INFANTRY DIVISION PACKAGE
$3.25 billion standard
*Replace LOSAT with LOSAT II: +$25 million
*Replace M119A1 with LFH-155: +$55 million
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
*Replace UH-60L with UH-102 Kestrel: +$890 million
Unit Cost 5.37B
Total Cost 10.74B
9x ARMORED CAVALRY REGIMENT PACKAGE
$3.5 billion standard
*Replace M1A2 Abrams with Iron Cheetah ADS: +$110 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$100 million
Replace M113A3 variants with M113A4: +$25 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
Replace M577A3 with M4 C2V: +$90 million
*Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker II: +$20 million
*Replace AH-64D with AH-93C: +$270 million
*Replace UH-60L with UH-102 Kestrel: +$350 million
Unit Cost 4.5B
Total Cost 40.5B
4x LIGHT ARMORED CAVALRY REGIMENT PACKAGE
$2.1 billion standard
*Replace Kit Fox Export with Kit Fox II: +$50 million
*Replace Stormcrow Export variants with Stormcrow II: +$110 million
Replace M113A3 variants with M113A4: +$25 million
*Replace M119A1 with M2015 Lancer: +$25 million
Replace AH-1W with AH-1Z Ultracobra: +$260 million
*Replace UH-60L with UH-102 Kestrel: +$350 million
Unit Cost 2.92B
Total Cost 11.68B
9x ARMORED BRIGADE PACKAGE (Brigade Combat Team)
$1.2 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$410 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$50 million
*Replace M1064 SPM with Stormcrow II SPM: +$50 million
Replace M113A3 variants with M113A4: +$15 million
Replace M577A3 with M4 C2V: +$80 million
Unit Cost 1.805B
Total Cost 16.245B
8x MECHANIZED INFANTRY BRIGADE PACKAGE (Brigade Combat Team)
$1.15 billion standard
*Replace Iron Cheetah Export with Iron Cheetah II: +$205 million
*Replace Mist Lynx Export variants with Mist Lynx II: +$90 million
*Replace M1064 SPM with Stormcrow II SPM: +$50 million
Replace M113A3 variants with M113A4: +$25 million
Replace M577A3 with M4 C2V: +$80 million
Unit Cost 1.6B
Total Cost 12.8B
13x REINFORCED LIGHT MECHANIZED INFANTRY BRIGADE PACKAGE (Brigade Combat Team)
$1.65 billion standard
*Replace Stingray II with Stingray IISJ: +$25 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
Unit Cost 1.71B
Total Cost 22.23B
6x REINFORCED URBAN COMBAT BRIGADE PACKAGE (Brigade Combat Team)
$2.5 billion standard
*Replace Merkava 4 with Merkava 4SJ: +$85 million
*Replace Nova Cat Export variants with Nova Cat II: +$150 million
Replace M113A3 variants with M113A4: +$45 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
*Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker II: +$25 million
Replace M577A3 with M4 C2V: +$150 million
Unit Cost 2.99B
Total Cost 17.94B
18x REINFORCED LIGHT INFANTRY BRIGADE PACKAGE
$450 million standard
*Replace M119A1 with M2015 Lancer: +$25 million
Unit Cost 475M
Total Cost 8.55B
5x CORPS HEAVY ARTILLERY BRIGADE PACKAGE
$650 million standard
*Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
*Replace Mist Lynx Export FISTV with Mist Lynx II: +$6 million
Replace M577A3 with M4 C2V: +$84 million
Unit Cost 775M
Total Cost 3.875B
2x SSM BRIGADE PACKAGE
$600 million standard
*Replace M51/M52/M1012 & TacTom variants with M56/M57/M1016 & Kodachis: +$550 million
Replace M577A3 with M4 C2V: +$50 million
Unit Cost 1.2B
Total Cost 2.4B
2x *THEATER AIR DEFENSE GROUP PACKAGE ADV (MFN & NGS only)
$11.5 billion standard
Total Cost 23B
5x CORPS AIR DEFENSE BRIGADE PACKAGE
$2.75 billion standard
*Replace Towed HUMRAAM launchers with Vespa (1152 missiles): +$500 million
Unit Cost 3.25B
Total Cost 16.25B
2x THEATER AVIATION GROUP PACKAGE
$6.2 billion standard
Replace CH-47F with EH-101 Merlin: Free
*Replace UH-60L with UH-102 Kestrel: +$1.5 billion
Unit Cost 7.7B
Total Cost 15.4B
5x CORPS AVIATION BRIGADE PACKAGE
$7.4 billion standard
*Replace AH-64D with AH-93C: +$1.26 billion
Replace CH-47F with EH-101 Merlin: Free
*Replace UH-60L with UH-102 Kestrel: +$2 billion
Unit Cost 10.66B
Total Cost 53.3B
5x CORPS ENGINEER BRIGADE PACKAGE
$1.25 billion standard
Replace M113A3 variants with M113A4: +$35 million
Replace M577A3 with M4 C2V: +$25 million
Unit Cost 1.31B
Total Cost 6.55B
5x CORPS SIGNAL BRIGADE PACKAGE
$500 million
Total Cost 2.5B
14x LIGHT INFANTRY BRIGADE PACKAGE
$95 million
Total Cost 1.33B
4x DIVISIONAL ARTILLERY BRIGADE PACKAGE (Heavy)
$1.2 billion standard
*Replace Mist Lynx Export FISTV with Mist Lynx II: +$20 million
*Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$90 million
Unit Cost 1.41B
Total Cost 5.64B
8x DIVISIONAL ARTILLERY BRIGADE PACKAGE (Light)
$300 million standard
*Replace M119A1 with M2015 Lancer: +$75 million
Unit Cost 375M
Total Cost 3B
4x DIVISIONAL AIR DEFENSE BRIGADE PACKAGE (Heavy)
$1 billion standard
*Replace Mist Lynx Linebacker Export with Mist Lynx II: +$50 million
*Replace Mist Lynx Export with Mist Lynx II: +$10 million
Replace M577A3 with M4 C2V: +$30 million
Unit Cost 1.09B
Total Cost 4.36B
8x DIVISIONAL AIR DEFENSE BRIGADE PACKAGE (Light)
$500 million standard
Total Cost 4B
4x HEAVY DIVISION AVIATION BRIGADE
$2.9 billion standard
*Replace M1A2 Abrams with Timberwolf: +$35 million
*Replace Mist Lynx Export CFV with Mist Lynx II CFV: +$30 million
Replace M577A3 with M4 C2V: +$20 million
Replace M113A3 variants with M113A4: +$3 million
*Replace AH-64D with AH-93C: +$850 million
*Replace UH-60L with UH-102 Kestrel: +$740 million
Unit Cost 4.578B
Total Cost 18.312B
8x LIGHT DIVISION AVIATION BRIGADE
$2.15 billion standard
Replace AH-1W with AH-1Z Ultracobra: +$1.15 billion
*Replace UH-60L with UH-102 Kestrel: +$890 million
Unit Cost 4.19B
Total Cost 33.52B
4x COMBAT ENGINEER BRIGADE PACKAGE
$800 million standard
Replace M113A3 variants with M113A4: +$30 million
Replace M577A3 with M4 C2V: +$40 million
Unit Cost 870M
Total Cost 3.48B
8x LAV ENGINEER BRIGADE
$400 million standard
Replace LAV-AG with LAV-105: +$10 million
Unit Cost 410M
Total Cost 3.28B
1 ARMORED DIVISION PACKAGE
1 ARMORED BATTALION PACKAGE
1 FIGHTER SQUADRON PACKAGE I also want an adition of 30 F-22's
1 MULTIROLE FIGHTER SQUADRON PACKAGE
1 HEAVY BOMBER SQUADRON PACKAGE
Can you also put together a carrier, infultration, and stealth package
I added an extra 250 billion for those.
how long is 1 ns year?
Total Army Cost: $473,751,000,000.00B
i stole this from someone who posted earlier
yet it fits my needs quite well
mony will be wired upon request
Duke Barol
Please tg me if you can
Unfortunately, this request includes an extreme amount of advanced equipment (those units with the asterisk (*) in front), which we are only willing to sell to trusted nations or under special circumstances. You have nowhere near the track record needed to obtain such a status as of yet. Additionally, our estimates show that paying off all of this equipment would take decades, considering that you can only afford to spend a few $billion a year on equipment, even while preparing for a war. Due to the uncertainty of such ventures, we feel that it is unwise to provide that much without extenuating circumstances that could guarantee payment. Finally, we estimate that the total personnel requirements to staff and support all the desired units exceeds 1.2 million, or over 10% of your population. Considering how that will cripple your economy in a matter of months, this provides a strong argument against your being able to pay off the equipment in the forseeable future.
We apologize, but at this point, the request simply has to be denied.
With the separate military branch status of the Al-Sabirian Arab Marine Corps being abolished due to deficiencies in the force structure and equipment, which rendered the conduction of effective combat operations impossible, as seen in recent conflicts at home and abroad, I, General Rafiq Fikri Zayn, chairman of the Joint Chiefs of Staff, hereby officially issue a request for proposals for the new table of organization and equipment of the yet-to-be-established naval infantry brigades, which will fulfill essentially the same role as the Arab Marine Corps, but under the sails of the Arab Navy. However, the staunch habits and traditions of the AMC are rendering simple transition of command impossible, so fresh units and equipment are an absolute must. Raw combat power, interoperability with coastal defence units, modular organization structure, so that up to three brigades can easily be linked into one division depending on the situation, an integrated rotary aviation battalion, compatible with the hangar capacities on Clan Smoke Jaguar's amphibious groups, and advanced Smoke Jaguar equipment are definite prerequisites. I'm convinced that CSJMI can fulfill our expectations and can even exceed those, as you have always done.
Awaiting Reply,
General Rafiq Fikri Zayn
We are already working on a Divisional level marine unit for another nation, and we see no reason why we can't use the same research to provide reinforced naval infantry brigades along the same lines.
We are honoered that the Holy Republic of Hawdawg has chosen to come to us to provide for their additional needs. To that end, we are placing a significant effort into this endeaor, and indeed already have the preliminary work done for the Marine Division. The Engineering unit will take some time to look into, but we are hopeful that we can provide something desirable there as well.
Preliminary information for Marine Division
SUBORDINATE UNITS:
1 Divisional HQ
3xMarine Regiment (9 battalions)
1xTank Battalion
1xLight Armored Assault/Recon Battalion
1xAssault Amphibian Battalion
1xRecon Battalion
1xCombat Engineer Battalion
1xArtillery Regiment (3 battalions)
2xLAV-AD Platoon
Total Personnel: 15,983 + 914 Navy
MAJOR EQUIPMENT
58xM1A1
144xAAV7A1
68xLAV-IV
16xLAV-AT
8xLAV-M
40xLAV-AD
12xLAV-CC
14xLAV-L
8xLAV-ARV
54xM198 155mm TH
9xM88A2 ARV
4xAVLB
1207xAssorted HMMWV
268xAssorted Truck
Note that the division, at present, has no integral aviation assets (which also helps account for the small size). Our research suggests that similar forces, due to the fact that there is a dedicated (and trusted) aviation arm, maintain their helicopter forces in separate aviation units that are attached to the divisions. If desired, these can be provided as well.
This force would require 1-2 of our Amphibious Groups to transport and deliver, depending on the amount of supplies and the specific vessels purchased.
OOC: The Engineer Division is a ground up thing, so it will take awhile. The actual Seabee units weren't full divisions, instead they would have Brigades with 2 or more Regiments, each of 2 or more battalions. Divisions would have multiple brigades plus additional support troops.
While they merged the two brigades into a single "division" three years ago, it has an active strength of only 2 regiments (though with 4 in reserve). However, it's important to note that Naval Construction Battalions (aka CBs or Seabees) are merely heavy construction units tasked with building infrastructure such as base facilities and airfields. In WWII, they fought when they had to, but were using mostly civilian equipment and rarely went looking for combat, though they made good use of their construction equipment when such situations arose.
Combat Engineers, on the other hand, are equipped for actual fighting, and would be much more likely to hold out against a determined attack, but lack the heavy equipment (their role is creating and clearing obstacles).
Combat Engineer, I can do, though with a little work. Seabees, I don't know if I can get the info. I haven't found any sign of rosters or TOEs, so I can't even tell you how many men are in a unit, and the information might not be readily available to me.
Thank you for your diligent work CSMJ. As far as the Marine Divisions are concerned we would like the turn-key package to include the aviation assets. Our current Marine Divisions have both WASP Class and TARAWA Class Amphibious Assault Ships to utilize (San Antonio Class is under development but won't be available for 6-8 years). To maintain a ease of maintenance clause in our military budget we are restricted to the following type of aircraft: (ROTARY) RAH-66A Comanche, AH-64 Apache, UH-60 Blackhawks, MH-60 Pavehawks, SH-60 Seahawks, CH-47 Chinooks or variants. (FIXED WING) F-18 Superhornets, F-22 Raptors, F-16 XL2s, F-15D Eagles, A-10 Warthogs, and various other noncombat aircraft.
Please utilize the above aircraft when constructing the aviation wing of the Marine Division. When you finish the Marine Division R&D for us, we need to know the suggested flotilla needed to support the full division. We have several Fast Ammunition ships, Supply ships, and Oilers that can be incorporated into the Division Fleet if necessary.
We have reviewed your research on the Engineering Divisions and have decided to ask you to work on the Combat Engineer Division. We feel this unit would most meet our needs at this time.
We will be ordering (10) Marine Combat Divisions upon completion of the R&D necessary. We are also looking at a preliminary order of (10) Combat Engineer Divisions.
We look forward to your response and commend you on your work so far.
Jefferson Davis
Minister of Defense
Holy Republic of Hawdawg
Clan Smoke Jaguar
23-03-2005, 04:45
Due to the request that a full aviation complement be included with the Marine Division, we have decided to go further and provide a completely self-contained Marine Expeditionary Force (MEF), which includes a Marine Division, a Marine Air Wing, a Marine Support Group, and a Command Element. However, due to the prohibitive difficulties of listing these all together, we have instead elected to list each as a separate package.
A full MEF would include one of each, and would be a completely self-contained fighting force requiring some 57,000 soldiers, including attached naval personnel.
We took some liberties, for example improving air defense capability and support elemetns, and we broke the infantry into 4 brigades of 3 battalions each, rather than the 3 regiments of 4 battalions that are standard (all this really means is extra support). Aviation has also been expanded to include additional combat and support aircraft, as well as additional training establishments to enhance the force's ability to operate and train free from outside assistance.
With its constituent units, this can also be broken up into 3-4 Marine Expeditionary Brigades (MEB), or up to 12 Marine Expeditionary Units (MEU and MEU(SOC))
In regards to the aircraft restrictions, we are not certain as to the specific models desired (there can be a lot of variation in components there), so we leave this up to you to decide. However, we feel it would be important to inform you that the CH-47 is not entirely suitable for marine use. Though it is capable of operating in the naval environment, the CH-53 helicopter is far superior in key respects. Most notably, the CH-53 has over 60% more payload yet takes up the same space. This translates to an additional 22 personnel or up to 6200 kg of additional cargo per trip per aircraft, with the same number of aircraft being carried. Thus, we strongly suggest using the CH-53, even if it entails some logistical difficulties.
Additionally, your current restrictions provide a serious flaw in the lack of VTOL and/or STOVL aircraft. Aircraft carriers, while excellent units, are quite limited in the number of aircraft they can provide for support. To that end, and considering that it isn't that likely that a full-size airfield can be captured and secured early on, aircraft are needed that can operate from LHD/LHA vessels and/or forward refueling stations set up by engineers. For this, we recommend the AV-8B Harrier II, or failing that, the somewhat less versatile F-35B STOVL JSF.
If it is not desired that these systems be procured, we can work out possible alternatives, but these are our suggestions.
And now, without further ado:
Marine Division
$2.5 billion standard,
Includes Vehicles and Equipment for the Following:
1xDivisional HQ
4xMarine Regiment (12 battalions)
1xTank Battalion
1xLight Armored Assault/Recon Battalion
1xAssault Amphibian Battalion
1xRecon Battalion
1xCombat Engineer Battalion
1xArtillery Regiment (4 battalions)
2xLAV-AD Platoon
Total Personnel: 19,507 + 1145 Navy
Major Equipment
58xM1A1
233xAAV7A1
68xLAV-IV
16xLAV-AT
8xLAV-M
40xLAV-AD
12xLAV-CC
14xLAV-L
8xLAV-AC
8xLAV-ARV
72xM198 155mm TH
9xM88A2 ARV
4xWolverine AVLB
80xFAV
1476xAssorted HMMWV
508xAssorted Truck
Armory complete with 15,000xG36A5 Assault Rifle, 6000xNeostead Combat Shotgun, 1500xM-29 OICW, 500xMSG-90 DMR, 72xM40A1 Sniper Rifle, 18xM82A1 Heavy Sniper Rifle, 6xIWS-2000 Anti-Materiel Rifle, 1200xM249A3 SAW/LMG, 600xMG-3 GPMG, 150xM2HB HMG, 150xMk.19 AGL, 200xJavelin Infantry ATGM launcher, 300xStinger Launcher, 500xSRAW, 96x82mm Mortar, 192x60mm Mortar, 6,000xCougar Pistol, 5000xMP-7 PDW
Some Possible Substitutions:
*Replace M1A1 with Iron Cheetah 2: +$0.3 billion
*Replace M1A1 with Timberwolf: +$0.15 billion
*Replace M1A1 with Merkava VSJ: +$0.15 billion
*Replace M1A1 with Iron Cheetah ADS: +$0.12 billion
Replace M1A1 with Merkava IVSJ: +$0.12 billion
Replace M1A1 with Leopard 2A6: +$0.1 billion
Replace M1A1 with Iron Cheetah: +$0.09 billion
Replace M1A1 with M1A2 SEP: +$0.075 billion
Replace M1A1 with Iron Cheetah Export: +$0.065 billion
Replace M1A1 with M1A2: +$0.065 billion
Replace M1A1 with Black Lanner: +$0.04 billion
Replace M1A1 with Merkava IV: +$0.03 billion
Replace M1A1 with Stingray IIISJ: +$0.01 billion
Replace M1A1 with Leopard 2A4: FREE
Replace M1A1 with M1: -$0.1 billion
Replace M1A1 with Stingray III: -$0.025 billion
Replace M1A1 with Kit Fox: -$0.04 billion
*Replace M1A1 with Sabra III: -$0.05 billion
Replace M1A1 with Kit Fox Export: -$0.06 billion
Replace M1A1 with Sabra II: -$0.095 billion
*Replace M1A1 with M48A9: -$0.01 billion
Replace M1A1 with Sabra: -$0.12 billion
Replace M1A1 with M60-2000: -$0.12 billion
Replace M1A1 with M48A7: -$0.15 billion
Replace M1A1 with M60A3: -$0.21 billion
Replace M1A1 with M60: -$0.23 billion
Replace M1A1 with M48A5: -$235 billion
*Replace AAV7A1 with AAV16A2: +$
Replace AAV7A1 with AAAV: +$0.65 billion
*Replace LAV-IV variants with Seacat: +$0.2 billion
Replace LAV-IV variants with Stryker: FREE
Replace LAV-M with LAV-M(S): +$0.005 billion
*Replace M198 with M2014: +$0.11 billion
*Replace M198 with M2015: +$0.05 billion
*Replace M198 with HFH 155: +$0.04 billion
*Replace M198 with LFH 155: +$0.015 billion
Replace M198 with G5: +$0.015 billion
*Replace M198 with ULH 105: -$0.01 billion
Replace M198 with M119A1: -$0.02 billion
Replace M198 with M102: -$0.03 billion
Marine Support Group
$1.5 billion
Includes Vehicles and Equipment for the Following:
1xHeadquarters & Service Battalion
1xMaintenance & Support Battalion
1xSupply Battalion
1xEngineer Support Battalion
1xLanding Support Battalion
1xMotor Transport Battalion
1xMedical Battalion
1xDental Battalion
3xCombat Service Support Group
1xCombat Service Support Detachment
Total Personnel: 11,048 + 1529 navy
Includes numerous support vehicles, as well as supplies, spare parts, prefabricated structures, and maintenance equipment. Also includes an armory with 9500xG36A5, 200xStinger CLU, 4000xCougar Pistol, 2000xMP-7 PDW
MEF Command Element
$1 billion standard
Includes Vehicles and Equipment for the Following:
1xMEF Command Element
1xHeadquarters Battalion
1xCommunications Battalion
1xSurveillance, Intelligence, and Reconnaissance Group
Total Personnel: 3864 + 106 navy
Includes numerous support vehicles, as well as supplies, spare parts, prefabricated structures, and maintenance equipment. Also includes an armory with 2600xG36A5, 80xStinger CLU, 1400xCougar Pistol, 1000xMP-7 PDW
Marine Air Wing
$40 billion standard, $53.46 billion max (NGS & MFN only), $38.57 billion min (NGS & MFN only)
1xAircraft Group, Fixed Wing (3022 personnel + 245 navy)
-3 Fighter/Attack Squadron
-3 Fighter/Attack (All Weather) Squadron
-1 Refueling Squadron
-1 Training Squadron (Fighter/Attack)
-1 Aviation Logistics Squadron
-1 Fleet Readiness Squadron
1xAircraft Group, VTOL (3378 personnel + 57 navy)
-4 Attack Squadron
-1 Attack Training Squadron
-3 Tactical Electronic Warfare Squadron
-1 Refueling Squadron
-1 Aviation Logistics Squadron
1xAircraft Group, Transport Helicopter (2857 personnel + 129 navy)
-4 Heavy Helicopter Squadron
-4 Medium Helicopter Squadron
-1 Training Helicopter Squadron (Heavy)
-1 Aviation Logistics Squadron
1xAircraft Group, Combat Helicopter (3422 personnel + 112 navy)
-4 Light/Attack Helicopter Squadron
-2 Medium Helicopter Squadron
-1 Training Helicopter Squadron (Light/Attack)
-1 Training Helicopter Squadron (Medium)
-1 Aviation Logistics Squadron
1xWing Support Group (2674 personnel + 163 navy)
-2 Wing Support Squadron (Fixed Wing)
-2 Wing Support Squadron (Rotary Wing)
1xAir Control Group (1418 personnel + 34 navy)
-1 UAV Squadron
-1 Wing Communication Squadron
-1 Air Support Squadron
-1 Tactical Air Command Squadron
-1 Air Control Squadron
-1 LAAD Battalion
TOTAL PERSONNEL: 19,054 + 789 navy
Major Equipment
-51xF/A-18C (36 PAA, 15 trainer)
-51xF/A-18D (36 PAA, 15 trainer)
-94xAV-8B (64 PAA, 30 trainer)
-15xEA-6B
-24xKC-130J
-96xAH-1W (72 PAA, 24 trainer)
-50xCH-53 (40 PAA, 10 trainer)
-92xCH-46 (72 PAA, 20 trainer)
-51xUH-1N (36 PAA, 15 trainer)
-32xRQ-2 Pioneer SRUAV
-60xAvenger
Armory complete with 12,000xG36A5, 150xStinger CLU, 6000xCougar Pistol, 4000xMP-7 PDW
Some Possible Substitutions:
*Replace F/A-18C/D with F-26: +$4.8 billion
Replace F/A-18C/D with F/A-18SJ: +$4.8 billion
Replace F/A-18C/D with F/A-18E/F: +$2.75 billion
*Replace F/A-18C/D with F-35F JSF: +$1.94 billion
Replace F/A-18C/D with F-35C JSF: +$0.92 billion
*Replace F/A-18C/D with F-28: +$0.71 billion
*Replace F/A-18C/D with F-27: -$0.3 billion
*Replace AV-8B+ with F-35E JSF: +$2.8 billion
Replace AV-8B+ with F-35B JSF: +$1.4 billion
*Replace EA-6B with 24xEF-35F: +$0.96 billion
*Replace EA-6B with 24xEF-35E: +$0.84 billion
Replace EA-6B with 24xEF-35C: +$0.6 billion
Replace EA-6B with 24xEF-35B: +$0.48 billion
Replace EA-6B with 24xEA-18G: +$0.36 billion
Replace EA-6B with EA-6SJ: +$0.225 billion
*Replace EA-6B with EA-15: -$0.15 billion
Replace AH-1W with RAH-66A: +$1.92 billion
*Replace AH-1W with AH-95: +$1.88 billion
Replace AH-1W with AH-1Z: +$1.54 billion
Replace AH-1W with OH-58D: -$0.58 billion
*Replace CH-53E with CH-61: +$0.5 billion
Replace CH-53E with CH-53X: +$0.5 billion
*Replace CH-46 with MH-102: +$4 billion
Replace CH-46 with UH-60M: +$3.1 billion
Replace CH-46 with UH-60L: +$0.2 billion
*Replace UH-1N with UH-102: +$2.48 billion
Replace UH-1N with UH-60M: +$1.96 billion
Replace UH-1N with UH-1Y: +$0.3 billion
*Replace UH-1N with UH-104: +$0.25 billion
Replace UH-1N with UH-60L: +$0.2 billion
Replace UH-1N with UH-1H: -$0.4 billion
To: CSMJ
From: Holy Republic of Hawdawg
Re: Marine Order
We would first like to thank your company for the hard work it has placed in developing these units for our armed forces. We came to an expert in the field and were not disappointed. We are taking your advice and including the VSTOL AV-8B Harrier II and the CH-53's in our Air Wing order. MEF groupings is totally fine as this is how we would prefer to purchase them. With that said we would like to order the following units:
(4)Marine Division
$2.5 billion standard,
Includes Vehicles and Equipment for the Following:
1xDivisional HQ
4xMarine Regiment (12 battalions)
1xTank Battalion
1xLight Armored Assault/Recon Battalion
1xAssault Amphibian Battalion
1xRecon Battalion
1xCombat Engineer Battalion
1xArtillery Regiment (4 battalions)
2xLAV-AD Platoon
Total Personnel: 19,507 + 1145 Navy
Major Equipment
58xM1A1
233xAAV7A1
68xLAV-IV
16xLAV-AT
8xLAV-M
40xLAV-AD
12xLAV-CC
14xLAV-L
8xLAV-AC
8xLAV-ARV
72xM198 155mm TH
9xM88A2 ARV
4xWolverine AVLB
80xFAV
1476xAssorted HMMWV
508xAssorted Truck
Armory complete with 15,000xG36A5 Assault Rifle, 6000xNeostead Combat Shotgun, 1500xM-29 OICW, 500xMSG-90 DMR, 72xM40A1 Sniper Rifle, 18xM82A1 Heavy Sniper Rifle, 6xIWS-2000 Anti-Materiel Rifle, 1200xM249A3 SAW/LMG, 600xMG-3 GPMG, 150xM2HB HMG, 150xMk.19 AGL, 200xJavelin Infantry ATGM launcher, 300xStinger Launcher, 500xSRAW, 96x82mm Mortar, 192x60mm Mortar, 6,000xCougar Pistol, 5000xMP-7 PDW
(4)Marine Support Group
$1.5 billion
Includes Vehicles and Equipment for the Following:
1xHeadquarters & Service Battalion
1xMaintenance & Support Battalion
1xSupply Battalion
1xEngineer Support Battalion
1xLanding Support Battalion
1xMotor Transport Battalion
1xMedical Battalion
1xDental Battalion
3xCombat Service Support Group
1xCombat Service Support Detachment
Total Personnel: 11,048 + 1529 navy
Includes numerous support vehicles, as well as supplies, spare parts, prefabricated structures, and maintenance equipment. Also includes an armory with 9500xG36A5, 200xStinger CLU, 4000xCougar Pistol, 2000xMP-7 PDW
(4) MEF Command Element
$1 billion standard
Includes Vehicles and Equipment for the Following:
1xMEF Command Element
1xHeadquarters Battalion
1xCommunications Battalion
1xSurveillance, Intelligence, and Reconnaissance Group
Total Personnel: 3864 + 106 navy
Includes numerous support vehicles, as well as supplies, spare parts, prefabricated structures, and maintenance equipment. Also includes an armory with 2600xG36A5, 80xStinger CLU, 1400xCougar Pistol, 1000xMP-7 PDW
(4)Marine Air Wing
$40 billion standard, $53.46 billion max (NGS & MFN only), $38.57 billion min (NGS & MFN only)
1xAircraft Group, Fixed Wing (3022 personnel + 245 navy)
-3 Fighter/Attack Squadron
-3 Fighter/Attack (All Weather) Squadron
-1 Refueling Squadron
-1 Training Squadron (Fighter/Attack)
-1 Aviation Logistics Squadron
-1 Fleet Readiness Squadron
1xAircraft Group, VTOL (3378 personnel + 57 navy)
-4 Attack Squadron
-1 Attack Training Squadron
-3 Tactical Electronic Warfare Squadron
-1 Refueling Squadron
-1 Aviation Logistics Squadron
1xAircraft Group, Transport Helicopter (2857 personnel + 129 navy)
-4 Heavy Helicopter Squadron
-4 Medium Helicopter Squadron
-1 Training Helicopter Squadron (Heavy)
-1 Aviation Logistics Squadron
1xAircraft Group, Combat Helicopter (3422 personnel + 112 navy)
-4 Light/Attack Helicopter Squadron
-2 Medium Helicopter Squadron
-1 Training Helicopter Squadron (Light/Attack)
-1 Training Helicopter Squadron (Medium)
-1 Aviation Logistics Squadron
1xWing Support Group (2674 personnel + 163 navy)
-2 Wing Support Squadron (Fixed Wing)
-2 Wing Support Squadron (Rotary Wing)
1xAir Control Group (1418 personnel + 34 navy)
-1 UAV Squadron
-1 Wing Communication Squadron
-1 Air Support Squadron
-1 Tactical Air Command Squadron
-1 Air Control Squadron
-1 LAAD Battalion
TOTAL PERSONNEL: 19,054 + 789 navy
Major Equipment
-51xF/A-18C (36 PAA, 15 trainer)
-51xF/A-18D (36 PAA, 15 trainer)
-94xAV-8B (64 PAA, 30 trainer)
-15xEA-6B
-24xKC-130J
-96xAH-1W (72 PAA, 24 trainer)
-50xCH-53 (40 PAA, 10 trainer)
-92xCH-46 (72 PAA, 20 trainer)
-51xUH-1N (36 PAA, 15 trainer)
-32xRQ-2 Pioneer SRUAV
-60xAvenger
Armory complete with 12,000xG36A5, 150xStinger CLU, 6000xCougar Pistol, 4000xMP-7 PDW
Replace F/A-18C/D with F/A-18SJ: +$4.8 billion
Replace AH-1W with RAH-66A: +$1.92 billion
The total cost to completely outfit (4) MEF with the equipment replacements listed is 202.88 Billion. This money will be wired in the usual manner upon confirmation of order.
Sincerely,
J. Davis
Minister of Defense
Holy Republic of Hawdawg
Clan Smoke Jaguar
24-03-2005, 06:31
To: CSMJ
From: Holy Republic of Hawdawg
Re: Marine Order
We would first like to thank your company for the hard work it has placed in developing these units for our armed forces. We came to an expert in the field and were not disappointed. We are taking your advice and including the VSTOL AV-8B Harrier II and the CH-53's in our Air Wing order. MEF groupings is totally fine as this is how we would prefer to purchase them. With that said we would like to order the following units:
(4)Marine Division
$2.5 billion standard,
Includes Vehicles and Equipment for the Following:
1xDivisional HQ
4xMarine Regiment (12 battalions)
1xTank Battalion
1xLight Armored Assault/Recon Battalion
1xAssault Amphibian Battalion
1xRecon Battalion
1xCombat Engineer Battalion
1xArtillery Regiment (4 battalions)
2xLAV-AD Platoon
Total Personnel: 19,507 + 1145 Navy
Major Equipment
58xM1A1
233xAAV7A1
68xLAV-IV
16xLAV-AT
8xLAV-M
40xLAV-AD
12xLAV-CC
14xLAV-L
8xLAV-AC
8xLAV-ARV
72xM198 155mm TH
9xM88A2 ARV
4xWolverine AVLB
80xFAV
1476xAssorted HMMWV
508xAssorted Truck
Armory complete with 15,000xG36A5 Assault Rifle, 6000xNeostead Combat Shotgun, 1500xM-29 OICW, 500xMSG-90 DMR, 72xM40A1 Sniper Rifle, 18xM82A1 Heavy Sniper Rifle, 6xIWS-2000 Anti-Materiel Rifle, 1200xM249A3 SAW/LMG, 600xMG-3 GPMG, 150xM2HB HMG, 150xMk.19 AGL, 200xJavelin Infantry ATGM launcher, 300xStinger Launcher, 500xSRAW, 96x82mm Mortar, 192x60mm Mortar, 6,000xCougar Pistol, 5000xMP-7 PDW
(4)Marine Support Group
$1.5 billion
Includes Vehicles and Equipment for the Following:
1xHeadquarters & Service Battalion
1xMaintenance & Support Battalion
1xSupply Battalion
1xEngineer Support Battalion
1xLanding Support Battalion
1xMotor Transport Battalion
1xMedical Battalion
1xDental Battalion
3xCombat Service Support Group
1xCombat Service Support Detachment
Total Personnel: 11,048 + 1529 navy
Includes numerous support vehicles, as well as supplies, spare parts, prefabricated structures, and maintenance equipment. Also includes an armory with 9500xG36A5, 200xStinger CLU, 4000xCougar Pistol, 2000xMP-7 PDW
(4) MEF Command Element
$1 billion standard
Includes Vehicles and Equipment for the Following:
1xMEF Command Element
1xHeadquarters Battalion
1xCommunications Battalion
1xSurveillance, Intelligence, and Reconnaissance Group
Total Personnel: 3864 + 106 navy
Includes numerous support vehicles, as well as supplies, spare parts, prefabricated structures, and maintenance equipment. Also includes an armory with 2600xG36A5, 80xStinger CLU, 1400xCougar Pistol, 1000xMP-7 PDW
(4)Marine Air Wing
$40 billion standard, $53.46 billion max (NGS & MFN only), $38.57 billion min (NGS & MFN only)
1xAircraft Group, Fixed Wing (3022 personnel + 245 navy)
-3 Fighter/Attack Squadron
-3 Fighter/Attack (All Weather) Squadron
-1 Refueling Squadron
-1 Training Squadron (Fighter/Attack)
-1 Aviation Logistics Squadron
-1 Fleet Readiness Squadron
1xAircraft Group, VTOL (3378 personnel + 57 navy)
-4 Attack Squadron
-1 Attack Training Squadron
-3 Tactical Electronic Warfare Squadron
-1 Refueling Squadron
-1 Aviation Logistics Squadron
1xAircraft Group, Transport Helicopter (2857 personnel + 129 navy)
-4 Heavy Helicopter Squadron
-4 Medium Helicopter Squadron
-1 Training Helicopter Squadron (Heavy)
-1 Aviation Logistics Squadron
1xAircraft Group, Combat Helicopter (3422 personnel + 112 navy)
-4 Light/Attack Helicopter Squadron
-2 Medium Helicopter Squadron
-1 Training Helicopter Squadron (Light/Attack)
-1 Training Helicopter Squadron (Medium)
-1 Aviation Logistics Squadron
1xWing Support Group (2674 personnel + 163 navy)
-2 Wing Support Squadron (Fixed Wing)
-2 Wing Support Squadron (Rotary Wing)
1xAir Control Group (1418 personnel + 34 navy)
-1 UAV Squadron
-1 Wing Communication Squadron
-1 Air Support Squadron
-1 Tactical Air Command Squadron
-1 Air Control Squadron
-1 LAAD Battalion
TOTAL PERSONNEL: 19,054 + 789 navy
Major Equipment
-51xF/A-18C (36 PAA, 15 trainer)
-51xF/A-18D (36 PAA, 15 trainer)
-94xAV-8B (64 PAA, 30 trainer)
-15xEA-6B
-24xKC-130J
-96xAH-1W (72 PAA, 24 trainer)
-50xCH-53 (40 PAA, 10 trainer)
-92xCH-46 (72 PAA, 20 trainer)
-51xUH-1N (36 PAA, 15 trainer)
-32xRQ-2 Pioneer SRUAV
-60xAvenger
Armory complete with 12,000xG36A5, 150xStinger CLU, 6000xCougar Pistol, 4000xMP-7 PDW
Replace F/A-18C/D with F/A-18SJ: +$4.8 billion
Replace AH-1W with RAH-66A: +$1.92 billion
The total cost to completely outfit (4) MEF with the equipment replacements listed is 202.88 Billion. This money will be wired in the usual manner upon confirmation of order.
Sincerely,
J. Davis
Minister of Defense
Holy Republic of Hawdawg
The order has been confirmed, and we expect delivery over the next 6 NS years.
We also would like to apologize in that we neglected to provide a critical piece of information that was asked for. So, to fix that oversight:
The ground component of the MEF is designed to be transported by two of our Amphibious Groups, which would include 12 LHA/LHD vessels and 24 LSD/LPD vessels. Larger vessels, such as our Anaconda, would be dedicated primarily to reducing necessary supplies. This will also also be sufficient for tansporting ans supporting all VTOL and rotary-winged aircraft in the Air Wing. Fixed wing aircraft are usually attached to carriers, and operated from any nearby forward airfields.
According to our organization, the amphibious vessels are further divided into 12 Amphibious Ready Groups, each with an LHD/LHA and 2 LPD/LSDs. Each of these could independently deploy and sustain a reinforced battalion in the form of a Marine Expeditionary Unit.
For logistics, ammunition ships and tankers may be used, but the Marine Corps prepositioning ships we offer can provide most of what's needed on their own. 7 of our Kolchak class vessels should be sufficient to maintain this force for over a month of combat operations.
To:CSMJ
From: Holy Republic of Hawdawg
Re: Additional Order and Clarification
We are more than willing to purchase the (8) Amphibous Groups needed to sustain the (4) MEF's in the field. We would like to ask about the double redundancy of Aircraft in the order we placed within the MEF and the Aircraft listed in the Amphibous Groups. If we are doubling up on planes could the aircraft listed in the Amp. Group be dropped from our costs?
We currently have Aircraft carriers available to assign to the MEF groups so these won't be needed. As a compliment to the carriers we will utilize the (4) Anaconda Class LPD's to assist with Air Wing workload. We have taken your advice and will purchase an additional 28 Kolchak Class Prepositioning Ships (16.8 Billion) to maintain a "solid" supply line in case of action.
In summary we need the following:
(8) Amphibous Groups (2 per MEF) 192 Billion (pending aircraft verification)
(16) Anaconda Class LPD's (4 per MEF) 24.96 Billion
(28) Kolchak Class Prepositioning Shops (7 per MEF) 16.8 Billion
Once you reach a total we will be glad to post a wire transfer for the balance.
Sincerely,
Jefferson Davis
Minister of Defense
Holy Republic of Hawdawg
Clan Smoke Jaguar
25-03-2005, 05:43
To:CSMJ
From: Holy Republic of Hawdawg
Re: Additional Order and Clarification
We are more than willing to purchase the (8) Amphibous Groups needed to sustain the (4) MEF's in the field. We would like to ask about the double redundancy of Aircraft in the order we placed within the MEF and the Aircraft listed in the Amphibous Groups. If we are doubling up on planes could the aircraft listed in the Amp. Group be dropped from our costs?
We currently have Aircraft carriers available to assign to the MEF groups so these won't be needed. As a compliment to the carriers we will utilize the (4) Anaconda Class LPD's to assist with Air Wing workload. We have taken your advice and will purchase an additional 28 Kolchak Class Prepositioning Ships (16.8 Billion) to maintain a "solid" supply line in case of action.
In summary we need the following:
(8) Amphibous Groups (2 per MEF) 192 Billion (pending aircraft verification)
(16) Anaconda Class LPD's (4 per MEF) 24.96 Billion
(28) Kolchak Class Prepositioning Shops (7 per MEF) 16.8 Billion
Once you reach a total we will be glad to post a wire transfer for the balance.
Sincerely,
Jefferson Davis
Minister of Defense
Holy Republic of Hawdawg
You are indeed correct that you will not require those aircraft. To that end, they can be subtracted, dropping the cost of the package by $9 billion. These are indeed impressive savings, but based on the requirements of your nation and the roles the amphibious group will entail, we suggest the following:
1) Replace the LPD-4 Austin units with the new LPD-17 San Antonio. We were previously informed that you were working on such units yourself, and these provide a massive capability increase over the Austins, whose design is now half a century old. This would cost $1.8 billion per group, or $14.4 billion total.
2) The standard assault craft complement is also ancient, and could use some modification. Considering that 7 LCAC units are the omptimal force for an MEU, you would want 42 of those in each Amphibious Group. Additionally, we would suggest taking advantage of the large capacity in the Anacondas to give 4 HLCACs for each of those, allowing them to be used as the primary venue for delivering heavy equipment. That, for example would allow the 8 Anacondas attached to each division to deploy the full tank battalion in a single wave without infringing upon the transport of lighter forces - clearly a desirable capability. A few LCU-2100 vessels could flesh this out to provide old-fashioned capability with slightly better survivability, and increased capability in heavier sea states.
The cost of replacing the standard landing craft complement with 42 LCACs, 8 HLCACs, and 12 LCU-2100s would be $1.2 billion per group, or $9.6 billion total.
With these two additions, you would have a survivable force capable of delivering your forces to a target beach rapidly, and quickly following up with a steady stream of supplies. You would also be able to supply your embarked troops for 20-25 days using just the amphibious vessels, with an extra 30+ from the prepositioning ships. And to boot, there's still a net reduction of 25% from the original list price.
With the recommendations, the cost for the Amphibious Groups is $144 billion, bringing the grand total to $185.76 billion.
We can expect to have delivery completed within 14 years
We thank you for your expertise in this matter and are highly pleased you chose to assist us in this matter. We have wired the 185.76 Billion to the normal account and when we order another set of MEF we will compile all the necessary components into one order. Again thank you for your assistance.
Sincerely,
J Davis
Minister of Defense
Holy Republic of Hawdawg
To:CSMJ
From:Holy Republic of Hawdawg
Re: Marine Order
We are once again in need of your services. We need to strengthen our Marine Expeditionary Forces by adding 4 MEF's to our arsenal. Therefore we wish to place the following order:
(4)Marine Division
$2.5 billion standard,
Includes Vehicles and Equipment for the Following:
1xDivisional HQ
4xMarine Regiment (12 battalions)
1xTank Battalion
1xLight Armored Assault/Recon Battalion
1xAssault Amphibian Battalion
1xRecon Battalion
1xCombat Engineer Battalion
1xArtillery Regiment (4 battalions)
2xLAV-AD Platoon
Total Personnel: 19,507 + 1145 Navy
Major Equipment
58xM1A1
233xAAV7A1
68xLAV-IV
16xLAV-AT
8xLAV-M
40xLAV-AD
12xLAV-CC
14xLAV-L
8xLAV-AC
8xLAV-ARV
72xM198 155mm TH
9xM88A2 ARV
4xWolverine AVLB
80xFAV
1476xAssorted HMMWV
508xAssorted Truck
Armory complete with 15,000xG36A5 Assault Rifle, 6000xNeostead Combat Shotgun, 1500xM-29 OICW, 500xMSG-90 DMR, 72xM40A1 Sniper Rifle, 18xM82A1 Heavy Sniper Rifle, 6xIWS-2000 Anti-Materiel Rifle, 1200xM249A3 SAW/LMG, 600xMG-3 GPMG, 150xM2HB HMG, 150xMk.19 AGL, 200xJavelin Infantry ATGM launcher, 300xStinger Launcher, 500xSRAW, 96x82mm Mortar, 192x60mm Mortar, 6,000xCougar Pistol, 5000xMP-7 PDW
(4)Marine Support Group
$1.5 billion
Includes Vehicles and Equipment for the Following:
1xHeadquarters & Service Battalion
1xMaintenance & Support Battalion
1xSupply Battalion
1xEngineer Support Battalion
1xLanding Support Battalion
1xMotor Transport Battalion
1xMedical Battalion
1xDental Battalion
3xCombat Service Support Group
1xCombat Service Support Detachment
Total Personnel: 11,048 + 1529 navy
Includes numerous support vehicles, as well as supplies, spare parts, prefabricated structures, and maintenance equipment. Also includes an armory with 9500xG36A5, 200xStinger CLU, 4000xCougar Pistol, 2000xMP-7 PDW
(4) MEF Command Element
$1 billion standard
Includes Vehicles and Equipment for the Following:
1xMEF Command Element
1xHeadquarters Battalion
1xCommunications Battalion
1xSurveillance, Intelligence, and Reconnaissance Group
Total Personnel: 3864 + 106 navy
Includes numerous support vehicles, as well as supplies, spare parts, prefabricated structures, and maintenance equipment. Also includes an armory with 2600xG36A5, 80xStinger CLU, 1400xCougar Pistol, 1000xMP-7 PDW
(4)Marine Air Wing
$40 billion standard, $53.46 billion max (NGS & MFN only), $38.57 billion min (NGS & MFN only)
1xAircraft Group, Fixed Wing (3022 personnel + 245 navy)
-3 Fighter/Attack Squadron
-3 Fighter/Attack (All Weather) Squadron
-1 Refueling Squadron
-1 Training Squadron (Fighter/Attack)
-1 Aviation Logistics Squadron
-1 Fleet Readiness Squadron
1xAircraft Group, VTOL (3378 personnel + 57 navy)
-4 Attack Squadron
-1 Attack Training Squadron
-3 Tactical Electronic Warfare Squadron
-1 Refueling Squadron
-1 Aviation Logistics Squadron
1xAircraft Group, Transport Helicopter (2857 personnel + 129 navy)
-4 Heavy Helicopter Squadron
-4 Medium Helicopter Squadron
-1 Training Helicopter Squadron (Heavy)
-1 Aviation Logistics Squadron
1xAircraft Group, Combat Helicopter (3422 personnel + 112 navy)
-4 Light/Attack Helicopter Squadron
-2 Medium Helicopter Squadron
-1 Training Helicopter Squadron (Light/Attack)
-1 Training Helicopter Squadron (Medium)
-1 Aviation Logistics Squadron
1xWing Support Group (2674 personnel + 163 navy)
-2 Wing Support Squadron (Fixed Wing)
-2 Wing Support Squadron (Rotary Wing)
1xAir Control Group (1418 personnel + 34 navy)
-1 UAV Squadron
-1 Wing Communication Squadron
-1 Air Support Squadron
-1 Tactical Air Command Squadron
-1 Air Control Squadron
-1 LAAD Battalion
TOTAL PERSONNEL: 19,054 + 789 navy
Major Equipment
-51xF/A-18C (36 PAA, 15 trainer)
-51xF/A-18D (36 PAA, 15 trainer)
-94xAV-8B (64 PAA, 30 trainer)
-15xEA-6B
-24xKC-130J
-96xAH-1W (72 PAA, 24 trainer)
-50xCH-53 (40 PAA, 10 trainer)
-92xCH-46 (72 PAA, 20 trainer)
-51xUH-1N (36 PAA, 15 trainer)
-32xRQ-2 Pioneer SRUAV
-60xAvenger
Armory complete with 12,000xG36A5, 150xStinger CLU, 6000xCougar Pistol, 4000xMP-7 PDW
Replace F/A-18C/D with F/A-18SJ: +$4.8 billion
Replace AH-1W with RAH-66A: +$1.92 billion
The total cost to completely outfit (4) MEF with the equipment replacements listed is 202.88 Billion. We also will need the Amphibous Groups as with our last order for 185.76 Billion.
Grand Total 388.64 Billion wired to the usual account upon confirmation.
Sincerely
J. Davis
Minister of Defense
Holy Republic of Hawdawg
Clan Smoke Jaguar
28-05-2005, 06:04
To:CSMJ
From:Holy Republic of Hawdawg
Re: Marine Order
We are once again in need of your services. We need to strengthen our Marine Expeditionary Forces by adding 4 MEF's to our arsenal. Therefore we wish to place the following order:
(4)Marine Division
$2.5 billion standard,
Includes Vehicles and Equipment for the Following:
1xDivisional HQ
4xMarine Regiment (12 battalions)
1xTank Battalion
1xLight Armored Assault/Recon Battalion
1xAssault Amphibian Battalion
1xRecon Battalion
1xCombat Engineer Battalion
1xArtillery Regiment (4 battalions)
2xLAV-AD Platoon
Total Personnel: 19,507 + 1145 Navy
Major Equipment
58xM1A1
233xAAV7A1
68xLAV-IV
16xLAV-AT
8xLAV-M
40xLAV-AD
12xLAV-CC
14xLAV-L
8xLAV-AC
8xLAV-ARV
72xM198 155mm TH
9xM88A2 ARV
4xWolverine AVLB
80xFAV
1476xAssorted HMMWV
508xAssorted Truck
Armory complete with 15,000xG36A5 Assault Rifle, 6000xNeostead Combat Shotgun, 1500xM-29 OICW, 500xMSG-90 DMR, 72xM40A1 Sniper Rifle, 18xM82A1 Heavy Sniper Rifle, 6xIWS-2000 Anti-Materiel Rifle, 1200xM249A3 SAW/LMG, 600xMG-3 GPMG, 150xM2HB HMG, 150xMk.19 AGL, 200xJavelin Infantry ATGM launcher, 300xStinger Launcher, 500xSRAW, 96x82mm Mortar, 192x60mm Mortar, 6,000xCougar Pistol, 5000xMP-7 PDW
(4)Marine Support Group
$1.5 billion
Includes Vehicles and Equipment for the Following:
1xHeadquarters & Service Battalion
1xMaintenance & Support Battalion
1xSupply Battalion
1xEngineer Support Battalion
1xLanding Support Battalion
1xMotor Transport Battalion
1xMedical Battalion
1xDental Battalion
3xCombat Service Support Group
1xCombat Service Support Detachment
Total Personnel: 11,048 + 1529 navy
Includes numerous support vehicles, as well as supplies, spare parts, prefabricated structures, and maintenance equipment. Also includes an armory with 9500xG36A5, 200xStinger CLU, 4000xCougar Pistol, 2000xMP-7 PDW
(4) MEF Command Element
$1 billion standard
Includes Vehicles and Equipment for the Following:
1xMEF Command Element
1xHeadquarters Battalion
1xCommunications Battalion
1xSurveillance, Intelligence, and Reconnaissance Group
Total Personnel: 3864 + 106 navy
Includes numerous support vehicles, as well as supplies, spare parts, prefabricated structures, and maintenance equipment. Also includes an armory with 2600xG36A5, 80xStinger CLU, 1400xCougar Pistol, 1000xMP-7 PDW
(4)Marine Air Wing
$40 billion standard, $53.46 billion max (NGS & MFN only), $38.57 billion min (NGS & MFN only)
1xAircraft Group, Fixed Wing (3022 personnel + 245 navy)
-3 Fighter/Attack Squadron
-3 Fighter/Attack (All Weather) Squadron
-1 Refueling Squadron
-1 Training Squadron (Fighter/Attack)
-1 Aviation Logistics Squadron
-1 Fleet Readiness Squadron
1xAircraft Group, VTOL (3378 personnel + 57 navy)
-4 Attack Squadron
-1 Attack Training Squadron
-3 Tactical Electronic Warfare Squadron
-1 Refueling Squadron
-1 Aviation Logistics Squadron
1xAircraft Group, Transport Helicopter (2857 personnel + 129 navy)
-4 Heavy Helicopter Squadron
-4 Medium Helicopter Squadron
-1 Training Helicopter Squadron (Heavy)
-1 Aviation Logistics Squadron
1xAircraft Group, Combat Helicopter (3422 personnel + 112 navy)
-4 Light/Attack Helicopter Squadron
-2 Medium Helicopter Squadron
-1 Training Helicopter Squadron (Light/Attack)
-1 Training Helicopter Squadron (Medium)
-1 Aviation Logistics Squadron
1xWing Support Group (2674 personnel + 163 navy)
-2 Wing Support Squadron (Fixed Wing)
-2 Wing Support Squadron (Rotary Wing)
1xAir Control Group (1418 personnel + 34 navy)
-1 UAV Squadron
-1 Wing Communication Squadron
-1 Air Support Squadron
-1 Tactical Air Command Squadron
-1 Air Control Squadron
-1 LAAD Battalion
TOTAL PERSONNEL: 19,054 + 789 navy
Major Equipment
-51xF/A-18C (36 PAA, 15 trainer)
-51xF/A-18D (36 PAA, 15 trainer)
-94xAV-8B (64 PAA, 30 trainer)
-15xEA-6B
-24xKC-130J
-96xAH-1W (72 PAA, 24 trainer)
-50xCH-53 (40 PAA, 10 trainer)
-92xCH-46 (72 PAA, 20 trainer)
-51xUH-1N (36 PAA, 15 trainer)
-32xRQ-2 Pioneer SRUAV
-60xAvenger
Armory complete with 12,000xG36A5, 150xStinger CLU, 6000xCougar Pistol, 4000xMP-7 PDW
Replace F/A-18C/D with F/A-18SJ: +$4.8 billion
Replace AH-1W with RAH-66A: +$1.92 billion
The total cost to completely outfit (4) MEF with the equipment replacements listed is 202.88 Billion. We also will need the Amphibous Groups as with our last order for 185.76 Billion.
Grand Total 388.64 Billion wired to the usual account upon confirmation.
Sincerely
J. Davis
Minister of Defense
Holy Republic of Hawdawg
We are happy to announce that your request has been confirmed and approved. We anticipate that the last unit can be delivered within 5 NS years.
Hookeyman
05-06-2005, 05:22
I need 50 armored division packages.
Clan Smoke Jaguar
05-06-2005, 06:39
I need 50 armored division packages.
We're sorry, but a nation of your size cannot afford to purchase, or for that matter maintain, even 10% of what you are requesting. We feel you would be best off starting much smaller, and adding to your forces as you grow.
imported_Illior
12-06-2005, 14:29
TO: CSJ Ground Package Division
From: Alej Klew, Undersecretary of the Deaprtment for Procurement and testing.
The nation of illior would like to make quite a large purchase, in an attempt to help standardize our ground forces. Not Knowing our nation's status with your company, the nation would like to have the upgrades where possible. The purchase list is as follows:
4 Armored Divisions
3 Light Armored Divisions
4 Mechanized Divisions
4 Urban Combat Divisions
5 Airmoble Mechanized Divisions
4 Airborn Infantry Divisions
2 Airmoble Infantry Divisions
3 ACRs
3 ALCRs
3 Reinforced Armor Brigades
10 Corps Rocket Artillery Brigades
5 Corps Heavy Artillery
5 Light Artillery
3 SSM Brigades
3 Theater Airdefense Packages
2 Theater Aviation groups
3 Corp Aviation Brigades
3 Engineering Brigades
2 Chemical Brigades
Base total=270,600,000,000
Note: Please remove all attack Helicopters from this order
For delivery of this large order, would it be possible to get 1 of each before your company delivers the others? it would be greatly appreciated.
OOC: taken Omz222's suggestion into consideration and added the total base price, and also CSJ, might also want to expand into corps and army packages.
OOC: Though I don't speak for the storefront's owner, perhaps you'd like to do some of the math? Frankly, as a weapons producer myself, that's a lot of math to do for the owner of the storefront. No offense, but I've seen a lot of storefront owners gets ticked especially when you have a large order with no math being done.
Roman Republic
12-06-2005, 16:15
CSJ, your packages are awesome. Eventally, I'll make packages almost like yours but have different weapons for my Storefront. HOO-AH to you.
Clan Smoke Jaguar
17-06-2005, 08:49
TO: CSJ Ground Package Division
From: Alej Klew, Undersecretary of the Deaprtment for Procurement and testing.
The nation of illior would like to make quite a large purchase, in an attempt to help standardize our ground forces. Not Knowing our nation's status with your company, the nation would like to have the upgrades where possible. The purchase list is as follows:
4 Armored Divisions
3 Light Armored Divisions
4 Mechanized Divisions
4 Urban Combat Divisions
5 Airmoble Mechanized Divisions
4 Airborn Infantry Divisions
2 Airmoble Infantry Divisions
3 ACRs
3 ALCRs
3 Reinforced Armor Brigades
10 Corps Rocket Artillery Brigades
5 Corps Heavy Artillery
5 Light Artillery
3 SSM Brigades
3 Theater Airdefense Packages
2 Theater Aviation groups
3 Corp Aviation Brigades
3 Engineering Brigades
2 Chemical Brigades
Base total=270,600,000,000
Note: Please remove all attack Helicopters from this order
For delivery of this large order, would it be possible to get 1 of each before your company delivers the others? it would be greatly appreciated.
OOC: taken Omz222's suggestion into consideration and added the total base price, and also CSJ, might also want to expand into corps and army packages.
To ensure that we are processing your request in the manner desired, we would like you to review this delivery as we see it:
4xArmored Division - $9 billion base
Replace Iron Cheetah Export with Iron Cheetah: +$175 million
Replace M1A2 Abrams with Timberwolf: +$50 million
Replace Mist Lynx Export variants with Mist Lynx: +$100 million
Replace M113A3 variants with M113A4: +$80 million
Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$450 million
Replace UH-60L with UH-60M: +$420 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Remove 48xAH-64D Longbow Apache: -$1.5 billion
Total: $9.275 billion ea - $37.1 billion
3xLight Armored Division - $8.5 billion base
Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace UH-60L with UH-60M: +$420 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Remove 48xAH-64D Longbow Apache: -$1.5 billion
Total: $7.94 billion ea - $23.82 billion
4xMechanized Division - $8.75 billion base
Replace Iron Cheetah Export with Iron Cheetah: +$140 million
Replace M1A2 Abrams with Timberwolf: +$50 million
Replace Mist Lynx Export variants with Mist Lynx: +$115 million
Replace M113A3 variants with M113A4: +$85 million
Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$450 million
Replace UH-60L with UH-60M: +$420 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Remove 48xAH-64D Longbow Apache: -$1.5 billion
Total: $9.03 billion ea - $36.12 billion
4xUrban Combat Division - $9 billion standard
Replace Merkava 4 with Merkava 4SJ: +$250 million
Replace M1A2 Abrams with Timberwolf: +$50 million
Replace Nova Cat Export variants with Nova Cat: +$115 million
Replace M113A3 variants with M113A4: +$100 million
Replace M2001A1 Crusader with M2012 Cavalier: +$100 million
Replace M577A3 with M4 C2V: +$580 million
Replace UH-60L with UH-60M: +$420 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Remove 48xAH-64D Longbow Apache: -$1.5 billion
Total: $9.535 billion ea - $38.14 billion
5xMechanized Airborne Division - $6 billion standard
Replace Stormcrow Export variants with Stormcrow: +$130 million
Replace M113A3 variants with M113A4: +$95 million
Replace M119A1 with M2015 Lancer: +$65 million
Replace UH-60L with UH-60M: +$500 million
Replace OH-58D with RAH-66A Comanche: +$625 million
Remove 72xAH-1W Supercobra: -$1.5 billion
Total: $5.915 billion ea - $29.575 billion
2xAirmobile Infantry Division - $8.3 billion standard
Replace M119A1 with M2015 Lancer: +$65 million
Replace CH-47F with CH-53X Ultra Stallion: +$1 billion
Replace UH-60L with UH-60M: +$1.69 billion
Replace OH-58D with RAH-66A Comanche: +$840 million
Remove 72xAH-64D Longbow Apache: -$2.25 billion
Total: $9.645 billion ea - $19.29 billion
4xAirborne Infantry Division - $3.25 billion standard
Replace M119A1 with M2015 Lancer: +$65 million
Replace UH-60L with UH-60M: +$500 million
Replace OH-58D with RAH-66A Comanche: +$625 million
Remove 72xAH-1W Supercobra: -$1.5 billion
Total: $2.94 billion ea - $11.76 billion
3xArmored Cavalry Regiment - $3.5 billion standard
Replace M1A2 Abrams with Timberwolf: +$160 million
Replace Mist Lynx Export variants with Mist Lynx: +$35 million
Replace M113A3 variants with M113A4: +$25 million
Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
Replace M577A3 with M4 C2V: +$90 million
Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker: +$5 million
Replace UH-60L with UH-60M: +$200 million
Replace OH-58D with RAH-66A Comanche: +$625 million
Remove 16xAH-64D Longbow Apache: -$500 million
Total: $4.175 billion ea - $12.525 billion
3xLight Armored Cavalry Regiment - $2.1 billion standard
Replace Stormcrow Export variants with Stormcrow: +$40 million
Replace M113A3 variants with M113A4: +$25 million
Replace M119A1 with M2015 Lancer: +$25 million
Replace UH-60L with UH-60M: +$200 million
Replace OH-58D with RAH-66A Comanche: +$625 million
Remove 16xAH-1W Supercobra: -$325 million
Total: $2.69 billion ea - $8.07 billion
3xReinforced Armroed Brigade - $2 billion standard
Replace Iron Cheetah Export with Iron Cheetah: +$70 million
Replace Mist Lynx Export variants with Mist Lynx: +$25 million
Replace M113A3 variants with M113A4: +$25 million
Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
Replace Mist Lynx Linebacker Export with Mist Lynx Linebacker: +$10 million
Replace M577A3 with M4 C2V: +$13 million
Total: $2.178 billion ea - $6.534 billion
10xCorps Rocket Artillery Brigade - $0.45 billion standard
Replace M577A3 with M4 C2V: +$100 million
Total: $0.55 billion ea - $5.5 billion
5xCorps Heavy Artillery Brigade - $0.65 billion standard
Replace M2001A1 Crusader with M2012 Cavalier: +$35 million
Replace Mist Lynx Export FISTV with Mist Lynx: +$2 million
Replace M577A3 with M4 C2V: +$84 million
Total: $0.772 billion ea - $3.86 billion
5xCorps Light Artillery Brigade - $0.35 billion standard
Replace M119A1 with M2015 Lancer: +$25 million
Total: $0.375 billion ea - $1.875 billion
3xSSM Brigade - $0.6 billion standard
Replace M51/M52 & TacTom variants with M53/M54 & Naginatas: +$130 million
Replace M577A3 with M4 C2V: +$50 million
Total: $0.78 billion ea - $2.34 billion
3xTheater Air Defense Group - $7.75 billion standard
Total: $7.75 billion ea - $23.25 billion
2xTheater Aviation Group - $6.2 billion standard
Replace CH-47F with CH-53X Ultra Stallion: +$2 billion
Replace UH-60L with UH-60M: +$850 million
Total: $9.05 billion ea - $18.1 billion
3xCorps Aviation Brigade -$7.4 billion standard
Replace CH-47F with CH-53X Ultra Stallion: +$1.3 billion
Replace UH-60L with UH-60M: +$1.15 billion
Remove 72xAH-64D Longbow Apache: -$2.25 billion
Total: $7.6 billion ea - $22.8 billion
3xCorps Engineering Brigade - $1.25 billion standard
Replace M113A3 variants with M113A4: +$35 million
Replace M577A3 with M4 C2V: +$25 million
Total: $1.85 billion ea - $5.55 billion
2xCorps Chemical Brigade - $0.4 billion standard
Replace M113A3 variants (including Lynx) with M113A4: +$20 million
Replace M577A3 with M4 C2V: +$5 million
Total: $0.425 billion ea - $0.85 billion
GRAND TOTAL: $307.059 billion
We hope this fills your requirements, and if this is accepted, we will be able to deliver this all within 5 NS years of payment.
Notes:
1) Though the specification was to remove all attack helicopters, we were not sure about the reconnaissance units, as, even though they can fulfill the role of light attack units, are primarily designed and equipped for observation. Thus, they were included, though can be removed if desired.
2) We allowed some of the lower-end (read: soon-to-be-export) advanced units to be included due to the size of the deal, and the Timberwolf tanks were thrown in as they are in relatively small numbers, and would provide much greater maintenance commonality with the Iron Cheetah than the M1A2 SEP would.
3) For the cargo helicopters, many would consider the CH-47 to be the logical choice. However, the CH-53 has a 40% greater payload, 25% greater interior space (more troops), greater speed, and greater range. Thus, we deemed it prudent to keep it.
4) On a somewhat similar note, while we could offer our own Grendel missiles in lieu of the PAC-2, the export units are only about equal in capability, and inferior in some respects, leaving the PAC-2 as the better all-around choice.
5) Corps and Army-level packages have been considered, but we really found that such units were so variable that they might not prove as useful. All corps and army-level units equipped with more than standard trucks and communication equipment are accounted for here, with a typical Corps having (usually) 2-4 divisions, 1 cavalry regiment, 1 corps light or heavy artillery brigade for each division, and one of each other corps package type. A typical Amy has 1-3 corps and 1 of each army-level unit.
While other units do exist as part of these complexes, they are either made up solely of trucks & similar vehicles, with clercks, supply personnel, and maintenance personnel, rather than any truly notable equipment; or, in some cases, are units that are found very rarely outside of specific nations (such as the Smoke Jaguar Corps Reconnaissance and Assault Tank brigades, which are found in few other nations).
OOC:
With big, nasty ones like this, I will usually request that some math be done up front, but the big thing is I take my time getting them done. When it takes over 70 minutes to do it, it's only natural.
As far as packages, I've been (slowly) working on a massive overhaul of the entire storefront. And if there's enough interest, corps and army packages might find their way in there. Additionally, I might pop up some soviet-style deployments.
Duke Barol
17-06-2005, 14:42
i guess that the answer is yes, but did you ever read "the gods themselves" by issac asimov?
Celtayoshi
17-06-2005, 15:09
The Celtayoshi Army is set to expand by requesting the pruchase of the following (Total at end, all standard)
1x ARMORED DIVISION PACKAGE
1x LIGHT ARMORED DIVISION PACKAGE
1x MECHANIZED INFANTRY DIVISION PACKAGE
2x COMBAT ENGINEER BRIGADE PACKAGE
Total: $27.85billion
Clan Smoke Jaguar
18-06-2005, 06:57
i guess that the answer is yes, but did you ever read "the gods themselves" by issac asimov?
I'm a little lost with the meaning of this one, and am not sure what this is a "yes" to. And no, while I've read quite a bit of his work, I don't recall having read "the gods themselves"
The Celtayoshi Army is set to expand by requesting the pruchase of the following (Total at end, all standard)
1x ARMORED DIVISION PACKAGE
1x LIGHT ARMORED DIVISION PACKAGE
1x MECHANIZED INFANTRY DIVISION PACKAGE
2x COMBAT ENGINEER BRIGADE PACKAGE
Total: $27.85billion
CSJMI is pleased to announce that the Celtayoshian order has been approved, and delivery is expected to be completed within 15 NS months
Celtayoshi
18-06-2005, 10:38
Many thanks, money wired.
imported_Illior
20-06-2005, 01:35
OOC: I guess Omz222 was right then... me not really ever owning a highly active storefront, I wouldn't have known... And personally for me, I like buying things in bulk, makes my organization that much easier.
IC: The nation of Illior is pleased to hear that it's order was accepted, and also the Recon Helicopters are fine,
*Payment has been wired through local western union*
Bungaria
20-06-2005, 02:51
The Allied States of Bungaria wishes to purchase a Light Infantry Division Package for a total of 2.5 billion, standard package.
We will wire half the money upon confirmation of reception of this telegram, and the other half once delivery is completed.
***MONEY WIRED***
Clan Smoke Jaguar
20-06-2005, 04:00
The Allied States of Bungaria wishes to purchase a Light Infantry Division Package for a total of 2.5 billion, standard package.
We will wire half the money upon confirmation of reception of this telegram, and the other half once delivery is completed.
CSJMI is pleased to announce that the Bungarian deal has been found acceptable, and has been approved, with delivery of the last unit expected within 12 NS months.
Space Union
24-06-2005, 17:58
To: CSJMI
From: Chief-of-Military Manjit,
Technocratic Republic of Space Union
Subject: Filing Order
Hello. I represent Space Union's Army's interest. We currently are remodelling our entire army, and we find that your storefront has a lot of what we want. For that reason we would like to order the following from you:
16 Armored Division:
Replace Iron Cheetah Export with Iron Cheetah: +$175 million
Replace M1A2 Abrams with M1A2 SEP: +$5.5 million
Replace Mist Lynx Export variants with Mist Lynx: +$100 million
Replace M113A3 variants with M113A4: +$80 million
Replace M577A3 with M4 C2V: +$450 million
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace UH-60L with UH-60M: +$420 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Price: $10,700,500,000 ($171,208,000,000)
-------------------------------------------------------------------------
16 Light Armored Division:
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace UH-60L with UH-60M: +$420 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Price: $9,390,000,000 ($150,240,000,000)
-------------------------------------------------------------------------
16 Mechanized Infantry Division:
Replace Iron Cheetah Export with Iron Cheetah: +$140 million
Replace M1A2 Abrams with M1A2 SEP: +$5.5 million
Replace Mist Lynx Export variants with Mist Lynx: +$115 million
Replace M113A3 variants with M113A4: +$85 million
Replace M577A3 with M4 C2V: +$450 million
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace UH-60L with UH-60M: +$420 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Price: $10,435,500,000 ($166,968,000,000)
-------------------------------------------------------------------------
16 Light Mechanized Infantry Division:
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace UH-60L with UH-60M: +$420 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Price: $9,390,000,000 ($150,240,000,000)
-------------------------------------------------------------------------
16 Urban Combat Division:
Replace Nova Cat Export variants with Nova Cat: +$115 million
Replace M113A3 variants with M113A4: +$100 million
Replace M577A3 with M4 C2V: +$580 million
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace UH-60L with UH-60M: +$420 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Price: $10,685,000,000 ($170,960,000,000)
-------------------------------------------------------------------------
16 Mechanized Airborne Division:
Replace Stormcrow Export variants with Stormcrow: +$130 million
Replace M113A3 variants with M113A4: +$95 million
Replace M119A1 with M198: +$26 million
Replace AH-1W with RAH-66A Comanche: +$1.45 billion
Replace UH-60L with UH-60M: +$500 million
Replace OH-58D with RAH-66A Comanche: +$625 million
Price: $8,826,000,000 ($141,216,000,000)
-------------------------------------------------------------------------
Total Purchase Price: $950,832,000,000
We hope that you can fullfill our huge order. Thank You and we look foward to doing more business with you.
Signed,
Chief-of-Military Manjit
Clan Smoke Jaguar
25-06-2005, 01:05
To: CSJMI
From: Chief-of-Military Manjit,
Technocratic Republic of Space Union
Subject: Filing Order
Hello. I represent Space Union's Army's interest. We currently are remodelling our entire army, and we find that your storefront has a lot of what we want. For that reason we would like to order the following from you:
16 Armored Division:
Replace Iron Cheetah Export with Iron Cheetah: +$175 million
Replace M1A2 Abrams with M1A2 SEP: +$5.5 million
Replace Mist Lynx Export variants with Mist Lynx: +$100 million
Replace M113A3 variants with M113A4: +$80 million
Replace M577A3 with M4 C2V: +$450 million
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace UH-60L with UH-60M: +$420 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Price: $10,700,500,000 ($171,208,000,000)
-------------------------------------------------------------------------
16 Light Armored Division:
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace UH-60L with UH-60M: +$420 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Price: $9,390,000,000 ($150,240,000,000)
-------------------------------------------------------------------------
16 Mechanized Infantry Division:
Replace Iron Cheetah Export with Iron Cheetah: +$140 million
Replace M1A2 Abrams with M1A2 SEP: +$5.5 million
Replace Mist Lynx Export variants with Mist Lynx: +$115 million
Replace M113A3 variants with M113A4: +$85 million
Replace M577A3 with M4 C2V: +$450 million
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace UH-60L with UH-60M: +$420 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Price: $10,435,500,000 ($166,968,000,000)
-------------------------------------------------------------------------
16 Light Mechanized Infantry Division:
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace UH-60L with UH-60M: +$420 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Price: $9,390,000,000 ($150,240,000,000)
-------------------------------------------------------------------------
16 Urban Combat Division:
Replace Nova Cat Export variants with Nova Cat: +$115 million
Replace M113A3 variants with M113A4: +$100 million
Replace M577A3 with M4 C2V: +$580 million
Replace AH-64D with RAH-66A Comanche: +$50 million
Replace UH-60L with UH-60M: +$420 million
Replace OH-58D with RAH-66A Comanche: +$420 million
Price: $10,685,000,000 ($170,960,000,000)
-------------------------------------------------------------------------
16 Mechanized Airborne Division:
Replace Stormcrow Export variants with Stormcrow: +$130 million
Replace M113A3 variants with M113A4: +$95 million
Replace M119A1 with M198: +$26 million
Replace AH-1W with RAH-66A Comanche: +$1.45 billion
Replace UH-60L with UH-60M: +$500 million
Replace OH-58D with RAH-66A Comanche: +$625 million
Price: $8,826,000,000 ($141,216,000,000)
-------------------------------------------------------------------------
Total Purchase Price: $950,832,000,000
We hope that you can fullfill our huge order. Thank You and we look foward to doing more business with you.
Signed,
Chief-of-Military Manjit
This is indeed a massive order, but after careful consideration, CSJMI is happy to announce that the request has been approved. However, with the great size of the order, we anticipate that it will take 14 NS years to completely fill.
Space Union
25-06-2005, 01:14
We thank you for fullfiling our order. We hope it will not put too much strain on you. Thank You.
Signed,
Chief-of-Military Manjit
Bungaria
01-07-2005, 19:46
As the Allied States of Bungaria continue to grow, we continue in need of defense forces to protect ourselves from attack. As of such, we wish to purchase two [2] Armored Division Packages at a cost of 9 billion each. This brings us to a total of 18 billion. We feel our rapidly expanding economy can easily accomodate such forces.
Thank you.
Clan Smoke Jaguar
02-07-2005, 05:22
As the Allied States of Bungaria continue to grow, we continue in need of defense forces to protect ourselves from attack. As of such, we wish to purchase two [2] Armored Division Packages at a cost of 9 billion each. This brings us to a total of 18 billion. We feel our rapidly expanding economy can easily accomodate such forces.
Thank you.
CSJMI is pleased to announce that the Bungarian request has been approved, and the last shipment is expected to be delivered within 18 NS months.
The War Department of Kazaki has been authorized to replace it's aging army to catch up with it's new navy purchased a few years ago. So we would like to purchase the following
1 Armored Division Package- 9 Billion
1 Light Armored Division Package-8.5 Billion
1 Mechanized Infantry Division Package-8.75 Billion
1 Urban Combat Division Package- 9 billion
1 Mechanized Airborne Division Package- 6 Billion
1 AIRMOBILE INFANTRY DIVISION PACKAGE- 8.3 Billion
1 AIRBORNE INFANTRY DIVISION PACKAGE- 3.25 Billion
1 ARMORED CAVALRY REGIMENT PACKAGE- 3.5 Billion
1 REINFORCED ARMORED BRIGADE PACKAGE- 2 billion
1 REINFORCED URBAN COMBAT BRIGADE PACKAGE-2.5 Billion
1 THEATER AIR DEFENSE GROUP PACKAGE- 7.75 Billion
-----------------------------------
68.55 Billion
70 Billion Wired upon confirmation. Return of Excess Funds not required
The Empire of Cotland would like to order the following equipment for our Armed Forces.
30x SSM BRIGADE PACKAGE
Cost: $650 million
Includes Vehicles and Equipment for the following:
1 Brigade HHC (Headquarters & Headquarters Company)
3 SSM Battalion
Total Personnel: 1206
Major Units
54xM51 SSM TEL
54xM52 Missile Transloader
54xM1012 Missile Transporter
17xM577A3
48xHMMWV
124xTruck
52xBGM-109 Tactical Tomahawk (454 kg)
28xBGM-109 Tactical Tomahawk (CEB)
28xBGM-109 Tactical Tomahawk (BAT)
Armory complete with: 400xG36A4, 600xCougar Pistol, 30xMSG-90, 12xMG3, 108xM136 AT4, 54xStinger Launcher, 800xMP-7
Replace M577A3 with M4 C2V: +$50 million
10x AIRBORNE INFANTRY DIVISION PACKAGE
Role: Light infantry formation with exceptional strategic mobility. Excellent as a rapid deployment unit, and can be deployed deep behind enemy lines. Lacks the tactical mobility and firepower of Mechanized Airborne Division, but more effective in restricted terrain and much cheaper to equip, operate, and maintain.
Cost: $3.87645 billion
Includes Vehicles and equipment for completely outfitting:
1 Division HQ, 1 Signal Bn, 1 Intelligence/Electronic Warfare Bn, 1 Recon Bn, 1 Anti-Tank Bn, 1 Divisional Band, 1 MP Company, 1 Chemical Warfare Company
3 Combat Brigade (total of 9 Airmobile Infantry Bn)
1 Artillery Brigade (3 TH Bn & 1 Light MLRS Bn)
1 Aviation Brigade (3 Attack Helicopter Bn, 1 Support Helicopter Bn, & 1 Air Recon (Cav) Squadron)
1 Engineer Brigade (3 Light Engineer Bn)
1 Air Defense Brigade (2 Forward Air Defense Bn, 1 Medium Air Defense Bn)
1 Support Brigade (1 Main Support Bn, 3 Forward Support Bn, 1 Medical Bn)
1 Intel & Electronic Warfare Bn
Total Personnel: 18,770
Major Equipment:
58xLOSAT
66xM981 FISTV
54xM119A1 Light Towed Howitzer
18xHIMARS
60x120mm Mortar
18xM9 ACE
2xM88 ARV
6xM93A1 Fox NBCR
90xAvenger FAADV
36xCLAWS Air Defense Vehicle
72xAH-1W Cobra Attack Helicopter
38xUH-60L Black Hawk Utility Helicopter
24xOH-58D Kiowa Recon/Light Attack Helicopter
4xEH-60 Quick Fix EW Helicopter
1900xAssorted HMMWV
1250xAssorted Truck
Armory complete with 12,000xG36A5 Assault Rifle, 3000xNeostead Combat Shotgun, 700xM-29 OICW, 200xMSG-90 DMR, 72xM40A1 Sniper Rifle, 18xM82A1 Heavy Sniper Rifle, 6xIWS-2000 Anti-Materiel Rifle, 900xM249A3 SAW/LMG, 500xMG-3 GPMG, 100xM2HB HMG, 100xMk.19 AGL, 175xJavelin Infantry ATGM launcher, 300xStinger Launcher, 2000xM136 AT4 LAW, 54x82mm Mortar, 108x60mm Mortar, 12,000xCougar Pistol, 5000xMP-7 PDW
Complete equipment for infantry, including BDUs, NBC protection gear, and 1200 Land Warrior Systems (1 squad per infantry platoon).
Some Possible Substitutions:
Replace AH-1W with RAH-66A Comanche: +$1.45 million
Replace OH-58D with RAH-66A Comanche: +$625 million
The total cost of $58,2645 Billion USD will be wired upon confirmation.
Clan Smoke Jaguar
09-07-2005, 10:39
The War Department of Kazaki has been authorized to replace it's aging army to catch up with it's new navy purchased a few years ago. So we would like to purchase the following
1 Armored Division Package- 9 Billion
1 Light Armored Division Package-8.5 Billion
1 Mechanized Infantry Division Package-8.75 Billion
1 Urban Combat Division Package- 9 billion
1 Mechanized Airborne Division Package- 6 Billion
1 AIRMOBILE INFANTRY DIVISION PACKAGE- 8.3 Billion
1 AIRBORNE INFANTRY DIVISION PACKAGE- 3.25 Billion
1 ARMORED CAVALRY REGIMENT PACKAGE- 3.5 Billion
1 REINFORCED ARMORED BRIGADE PACKAGE- 2 billion
1 REINFORCED URBAN COMBAT BRIGADE PACKAGE-2.5 Billion
1 THEATER AIR DEFENSE GROUP PACKAGE- 7.75 Billion
-----------------------------------
68.55 Billion
70 Billion Wired upon confirmation. Return of Excess Funds not required
CSJMI is pleased to announce that the Kazakian request has been approved, with delivery of the last shipment expected within 8 NS years.
We are also greatful for the additional funds being offered, and will use them towards additional R&D, in which case we may be able to offer one or more future advanced products to Kazaki in limited quantities.
The Empire of Cotland would like to order the following equipment for our Armed Forces.
30x SSM BRIGADE PACKAGE
Replace M577A3 with M4 C2V: +$50 million
Cost: $650 million
10x AIRBORNE INFANTRY DIVISION PACKAGE
Replace AH-1W with RAH-66A Comanche: +$1.45 million
Replace OH-58D with RAH-66A Comanche: +$625 million
Cost: $3.87645 billion
The total cost of $58,2645 Billion USD will be wired upon confirmation.
CSJMI is pleased to announce that the Cotland request has been approved, and delivery of the last unit is expected within 6 NS years.
The Empire of Cotland would like to order a total of 25 of the following package. Money wired upon confirmation.
*************
LAV ENGINEER BRIGADE
Role: Mechanized engineering unit based on LAV series units for operating with amphibious forces.
Cost: $410 million
Includes Vehicles and equipment for the following:
1 Brigade HHC
3 LAV Engineer Battalion
Total Personnel: 1373
Major Units:
44 LAV-E
15 LAV-CC
94 LAV-L
72xM9 ACE
36xLAV-AG
36xMine Clearing Launcher
18xM548
126xHMMWV
156xTruck
Armory complete with: 400xG36A4, 700xCougar Pistol, 40xMSG-90, 100xMG3, 50xM249 SAW, 216xM136 AT4, 60xStinger Launcher, 900xMP-7
Some Possible Substitutions:
Replace LAV-AG with LAV-105: +$10 million
The Empire of Cotland would like to purchase the following packages for its Army. The total price of $194.9 billion will be wired upon confirmation.
10x THEATER AIR DEFENSE GROUP PACKAGE
Cost: $7.75 billion
10x THEATER AVIATION GROUP PACKAGE
Cost: $5.2 billion
(Replace CH-47F with CH-47D: -$1 billion)
30x CORPS ENGINEER BRIGADE PACKAGE
Cost: $1.13 billion
(Replace M113A3 variants with M113A4: +$35 million)
(Replace Kodiak ABV with Grizzly ABV: -$20 million)
(Replace Iron Cheetah AVLB with M60 AVLB: -$160 million)
(Replace M577A3 with M4 C2V: +$25 million)
30x CORPS SIGNAL BRIGADE PACKAGE
Cost: $500 million
30x CORPS ROCKET ARTILLERY BRIGADE PACKAGE
Cost: $550 million
(Replace M577A3 with M4 C2V: +$100 million)
Clan Smoke Jaguar
29-07-2005, 00:58
The Empire of Cotland would like to order a total of 25 of the following package. Money wired upon confirmation.
*************
LAV ENGINEER BRIGADE
Role: Mechanized engineering unit based on LAV series units for operating with amphibious forces.
Cost: $410 million
Includes Vehicles and equipment for the following:
1 Brigade HHC
3 LAV Engineer Battalion
Total Personnel: 1373
Major Units:
44 LAV-E
15 LAV-CC
94 LAV-L
72xM9 ACE
36xLAV-AG
36xMine Clearing Launcher
18xM548
126xHMMWV
156xTruck
Armory complete with: 400xG36A4, 700xCougar Pistol, 40xMSG-90, 100xMG3, 50xM249 SAW, 216xM136 AT4, 60xStinger Launcher, 900xMP-7
Some Possible Substitutions:
Replace LAV-AG with LAV-105: +$10 million
The Empire of Cotland would like to purchase the following packages for its Army. The total price of $194.9 billion will be wired upon confirmation.
OOC: Sorry for the delay. I was worked to death for a few days after getting back from my trip to Seattle :(
IC:
CSJMI is pleased to announce that the Cotland requests have been approved, with delivery of the last unit expected within 12 NS years.
To: CSMJ
From: Holy Republic of Hawdawg
Re: Ground Order
We will need the following divisions for an upgrade in our Ground Capabilities.
(5) Armored Divisions (9 Billion) Total Cost (45 Billion)
(5) Mechanized Infantry(w/Iron Cheetah II upgrade) (9.56 bil) Total Cost (47.8 bil)
(5) Light Mech. Inf. (8.5 bil) Total Cost (42.5 bil)
(5)Urban Combat Div. (9 bil) Total Cost (45 bil)
(5) Airborne Infantry (3.25 bil) Total Cost (16.25 bil)
(5) Mech. Airborne (6 bil) Total Cost (30 bil)
Total bill for this order is (226.55 Billion USD). The money will be wired to the proper account upon confirmation of the order.
Sincerely,
G. Wells
Minister of Defense
Holy Republic of Hawdawg
Clan Smoke Jaguar
08-08-2005, 04:41
To: CSMJ
From: Holy Republic of Hawdawg
Re: Ground Order
We will need the following divisions for an upgrade in our Ground Capabilities.
(5) Armored Divisions (9 Billion) Total Cost (45 Billion)
(5) Mechanized Infantry(w/Iron Cheetah II upgrade) (9.56 bil) Total Cost (47.8 bil)
(5) Light Mech. Inf. (8.5 bil) Total Cost (42.5 bil)
(5)Urban Combat Div. (9 bil) Total Cost (45 bil)
(5) Airborne Infantry (3.25 bil) Total Cost (16.25 bil)
(5) Mech. Airborne (6 bil) Total Cost (30 bil)
Total bill for this order is (226.55 Billion USD). The money will be wired to the proper account upon confirmation of the order.
Sincerely,
G. Wells
Minister of Defense
Holy Republic of Hawdawg
CSJMI is pleased to announce that the Hawdawg request has been approved, and delivery of the last unit is expected within 12 NS years.
To: CSMJ
From: Holy Republic of Hawdawg
Re: Order
Dear Sir we wish to place the following order for equipment from your company:
(5) Armored Divisions
Some Possible Substitutions:
*Replace Mist Lynx Export variants with Mist Lynx: +$300 million
Total Cost with Substitutions: ($46.5 bil)
(10) THEATER AIR DEFENSE GROUP PACKAGE ADV
Cost: $11.5 bil
Total Cost ($115 bil)
(10) CORPS AIR DEFENSE BRIGADE PACKAGE
Cost: $2.75 billion
Total Cost ($27.5 bil)
Total Cost of this order is $189 billion. Money will be wired to the proper account upon confirmation of the order.
Sincerely,
Gordon Wells
Minister of Defense
Holy Republic of Hawdawg
Clan Smoke Jaguar
29-08-2005, 08:00
To: CSMJ
From: Holy Republic of Hawdawg
Re: Order
Dear Sir we wish to place the following order for equipment from your company:
(5) Armored Divisions
Some Possible Substitutions:
*Replace Mist Lynx Export variants with Mist Lynx: +$300 million
Total Cost with Substitutions: ($46.5 bil)
(10) THEATER AIR DEFENSE GROUP PACKAGE ADV
Cost: $11.5 bil
Total Cost ($115 bil)
(10) CORPS AIR DEFENSE BRIGADE PACKAGE
Cost: $2.75 billion
Total Cost ($27.5 bil)
Total Cost of this order is $189 billion. Money will be wired to the proper account upon confirmation of the order.
Sincerely,
Gordon Wells
Minister of Defense
Holy Republic of Hawdawg
CSJMI is pleased to announce that the Hawdawg request has been approved, and delivery of the last unit is expected within 5 NS years.
Plaladium
17-09-2005, 10:33
CSJMI;
We would like to place an order for:
3 x ARMORED DIVISION PACKAGES
1 x MECHANIZED INFANTRY DIVISION PACKAGE
2 x AIRMOBILE INFANTRY DIVISION PACKAGES
1 x CARRIER BATTLE GROUP PACKAGE (with Replace Los Angeles with Dolphin II SSN)
2 x SUBMARINE GROUP I PACKAGES (Replace Los Angeles with Dolphin II, add 450 Mk.48, replace Tomahawk with 1000 Naginata)
2 x LIGHT CARRIER BATTLE GROUP PACKAGES
3 x DESTROYER SQUADRON PACKAGES (Replace Sparrowhawk Export with Albatross DDGN)
4 x CORVETTE SQUADRON PACKAGES
1 x AFLOAT PREPOSITIONING SQUADRON PACKAGE
2 x COMBAT LOGISTICS SQUADRON PACKAGES
2 x AMPHIBIOUS GROUP PACKAGES
3 x REINFORCED COMPOSITE AIR WING PACKAGE
2 x FIGHTER WING PACKAGES (Replace F-15C with F/A-22C Raptor)
1 x ATTACK WING PACKAGE (Replace A/OA-10 with F-35B JSF)
1 x HEAVY BOMBER WING PACKAGE (Replace B-1B with B-2A)
8 x Raptor Class LHD
Cost: $502.56 billion
We also would like to negotiate for the instructioal staff to assist in training my naval crew with their new toys. The total cost of $502.56 Billion USD will be wired upon confirmation of the order. Hopefully, in the future we can negotiate to have the lasers reinstalled on the ships.
CDS Field Marshall Stone
Chief of Defence Staff
Clan Smoke Jaguar
17-09-2005, 23:40
CSJMI;
We would like to place an order for:
3 x ARMORED DIVISION PACKAGES
1 x MECHANIZED INFANTRY DIVISION PACKAGE
2 x AIRMOBILE INFANTRY DIVISION PACKAGES
1 x CARRIER BATTLE GROUP PACKAGE (with Replace Los Angeles with Dolphin II SSN)
2 x SUBMARINE GROUP I PACKAGES (Replace Los Angeles with Dolphin II, add 450 Mk.48, replace Tomahawk with 1000 Naginata)
2 x LIGHT CARRIER BATTLE GROUP PACKAGES
3 x DESTROYER SQUADRON PACKAGES (Replace Sparrowhawk Export with Albatross DDGN)
4 x CORVETTE SQUADRON PACKAGES
1 x AFLOAT PREPOSITIONING SQUADRON PACKAGE
2 x COMBAT LOGISTICS SQUADRON PACKAGES
2 x AMPHIBIOUS GROUP PACKAGES
3 x REINFORCED COMPOSITE AIR WING PACKAGE
2 x FIGHTER WING PACKAGES (Replace F-15C with F/A-22C Raptor)
1 x ATTACK WING PACKAGE (Replace A/OA-10 with F-35B JSF)
1 x HEAVY BOMBER WING PACKAGE (Replace B-1B with B-2A)
8 x Raptor Class LHD
Cost: $502.56 billion
We also would like to negotiate for the instructioal staff to assist in training my naval crew with their new toys. The total cost of $502.56 Billion USD will be wired upon confirmation of the order. Hopefully, in the future we can negotiate to have the lasers reinstalled on the ships.
CDS Field Marshall Stone
Chief of Defence Staff
CSJMI is pleased to announce that the Plaladium request has been approved, and delivery of the last unit is expected within 10 NS years.
Regarding the training requirement, there are several options available, depending on the methods and level of training desired, as well as number of trained personnel.
For complete training of one full crew for all naval vessels purchased, the most efficient (quickest and with the best overall results) would be to send all desired personnel through our own training programs. The cost of this would be about $150 million, $200 million with dockyard support and a 1/4 relief crew for each vessel. Alternate options include sending only key personnel (about 1/5 of the total crewmembers needed) to the academy, and have them train the remainder at home. This will cost $35-45 million, but is more time consuming and usually doesn't produce the quality of crews our full program would. Further down, we could have some of our own personnel shipped to your nation to set up training there. This would cost only $10-20 million, but is very time consuming (we can only spare so many qualified personnel) and also might have negegive impacts on the overall training level, as most of your crews will be receiving 2nd and 3rd-hand instruction, possibly lower.
Greetings from The Republic of Geht, we are the representative of the region, and alliance, The Solux Empire. As an alliance, we combine our budgets for military forces together. Also currently, we are putting 50% of that military budget towards the army.
We would then like to purchase
3 x Mechanized Infantry Divisions, with a substitution of RAH-66A Comanches for the OH-58D Kiowa Warriors.
1 x Theater Aviation Group package, and substitute then CH-47 Chinook with CH-53E Super Stallions
2 x Divisional Air Defence Brigades.
The total for this order is $36.71 billion dollars. These funds will be wired upon confirmation.
Clan Smoke Jaguar
28-10-2005, 12:19
Greetings from The Republic of Geht, we are the representative of the region, and alliance, The Solux Empire. As an alliance, we combine our budgets for military forces together. Also currently, we are putting 50% of that military budget towards the army.
We would then like to purchase
3 x Mechanized Infantry Divisions, with a substitution of RAH-66A Comanches for the OH-58D Kiowa Warriors.
1 x Theater Aviation Group package, and substitute then CH-47 Chinook with CH-53E Super Stallions
2 x Divisional Air Defence Brigades.
The total for this order is $36.71 billion dollars. These funds will be wired upon confirmation.
CSJMI is pleased to announce that the Soluxian request has been approved with delivery of the last unit expected within 3 NS years. We look forward to doing business with you again in the future.
Roman Republic
29-12-2005, 04:12
OCC: Is it possible if I could copy the organization of your packages, not the products, but the organization. Your organization of your packages impressed me to create packages for my storefromt.
The Empire is currently undergoing a massive refurbishing of its military, and therefore wish to purchase the following equipment from Clan Smoke Jaguar. We are aware that this is a huge order, and therefore, we would like to pay for the equipment over a timespan of 5 (five) NS years. Thank you in advance.
- Procurement Division, Ministry of Defense
xxxxxxxxxxxxxxxxxxxxxxxxxxxxx
ARMORED DIVISION PACKAGE
Replace all MBTs with M60: -$1.6 billion
Replace M2001A1 Crusader with M109A5: -$390 million
Replace M577A3 with M4 C2V: +$450 million
Replace UH-60L with UH-60M: +$420 million
Price per Division: $7.88 billion
20 Divisions: $157.6 billion
MECHANIZED INFANTRY DIVISION PACKAGE
Replace all MBTs with M60: -$1.31 billion
Replace M2001A1 Crusader with M109A5: -$390 million
Replace M577A3 with M4 C2V: +$450 million
Replace UH-60L with UH-60M: +$420 million
Price per Division: $7.92 billion
60 Divisions: $475.2 billion
URBAN COMBAT DIVISION PACKAGE
Replace M2001A1 Crusader with M109A5: -$390 million
Replace M577A3 with M4 C2V: +$580 million
Price per Division: $9.19 billion
16 Divisions: $147.04 billion
MECHANIZED AIRBORNE DIVISION PACKAGE
*Replace M119A1 with LFH-155: +$55 million
Replace UH-60L with UH-60M: +$500 million
Price per Division: $6.555 billion
20 Divisions: $131.1 billion
AIRMOBILE INFANTRY DIVISION PACKAGE
*Replace M119A1 with LFH-155: +$55 million
Replace UH-60L with UH-60M: +$1.69 billion
Price per Division: $10.045 billion
20 Divisions: $200.9 billion
AIRBORNE INFANTRY DIVISION PACKAGE
*Replace M119A1 with LFH-155: +$55 million
Replace UH-60L with UH-60M: +$500 million
Price per Division: $3.805 billion
16 Divisions: $60.88 billion
LIGHT INFANTRY DIVISION PACKAGE
*Replace M119A1 with LFH-155: +$40 million
Replace AH-1W with OH-58D Kiowa Warrior: -$290 million
Replace UH-60L with UH-60M: +$500 million
Price per Division: $2.75 billion
80 Divisions: $220.0 billion
ARMORED CAVALRY REGIMENT PACKAGE
Replace M1A2 Abrams with M60: -$630 million
Replace M2001A1 Crusader with M109A5: -$130 million
Replace M577A3 with M4 C2V: +$90 million
Replace UH-60L with UH-60M: +$200 million
Price per Regiment: $3.03 billion
16 Regiments: $48.48 billion
REINFORCED AIRBORNE BRIGADE PACKAGE
*Replace M119A1 with LFH-155: +$20 million
Price per Brigade: $520 million
16 Brigades: $8.32 billion
CORPS HEAVY ARTILLERY BRIGADE PACKAGE
Replace M2001A1 Crusader with M109A5: -$130 million
Replace M577A3 with M4 C2V: +$84 million
Price per Brigade: $604 million
10 Brigades: $6.04 billion
CORPS ENGINEER BRIGADE PACKAGE
Replace Iron Cheetah AVLB with M60 AVLB: -$160 million
Replace M577A3 with M4 C2V: +$25 million
Price per Brigade: $1.115 billion
20 Brigades: $22.3 billion
CORPS CHEMICAL BRIGADE PACKAGE
Replace M577A3 with M4 C2V: +$5 million
Price per Brigade: $405 million
10 Brigades: $4.05 billion
COMBAT ENGINEER BRIGADE PACKAGE
Replace Iron Cheetah AVLB with M60 AVLB: -$120 million
Replace M577A3 with M4 C2V: +$40 million
Price per Brigade: $720 million
40 Brigades: $28.8 billion
Total cost: $1,510.71 billion
Clan Smoke Jaguar
16-01-2006, 13:11
The Empire is currently undergoing a massive refurbishing of its military, and therefore wish to purchase the following equipment from Clan Smoke Jaguar. We are aware that this is a huge order, and therefore, we would like to pay for the equipment over a timespan of 5 (five) NS years. Thank you in advance.
- Procurement Division, Ministry of Defense
xxxxxxxxxxxxxxxxxxxxxxxxxxxxx
ARMORED DIVISION PACKAGE
Replace all MBTs with M60: -$1.6 billion
Replace M2001A1 Crusader with M109A5: -$390 million
Replace M577A3 with M4 C2V: +$450 million
Replace UH-60L with UH-60M: +$420 million
Price per Division: $7.88 billion
20 Divisions: $157.6 billion
MECHANIZED INFANTRY DIVISION PACKAGE
Replace all MBTs with M60: -$1.31 billion
Replace M2001A1 Crusader with M109A5: -$390 million
Replace M577A3 with M4 C2V: +$450 million
Replace UH-60L with UH-60M: +$420 million
Price per Division: $7.92 billion
60 Divisions: $475.2 billion
URBAN COMBAT DIVISION PACKAGE
Replace M2001A1 Crusader with M109A5: -$390 million
Replace M577A3 with M4 C2V: +$580 million
Price per Division: $9.19 billion
16 Divisions: $147.04 billion
MECHANIZED AIRBORNE DIVISION PACKAGE
*Replace M119A1 with LFH-155: +$55 million
Replace UH-60L with UH-60M: +$500 million
Price per Division: $6.555 billion
20 Divisions: $131.1 billion
AIRMOBILE INFANTRY DIVISION PACKAGE
*Replace M119A1 with LFH-155: +$55 million
Replace UH-60L with UH-60M: +$1.69 billion
Price per Division: $10.045 billion
20 Divisions: $200.9 billion
AIRBORNE INFANTRY DIVISION PACKAGE
*Replace M119A1 with LFH-155: +$55 million
Replace UH-60L with UH-60M: +$500 million
Price per Division: $3.805 billion
16 Divisions: $60.88 billion
LIGHT INFANTRY DIVISION PACKAGE
*Replace M119A1 with LFH-155: +$40 million
Replace AH-1W with OH-58D Kiowa Warrior: -$290 million
Replace UH-60L with UH-60M: +$500 million
Price per Division: $2.75 billion
80 Divisions: $220.0 billion
ARMORED CAVALRY REGIMENT PACKAGE
Replace M1A2 Abrams with M60: -$630 million
Replace M2001A1 Crusader with M109A5: -$130 million
Replace M577A3 with M4 C2V: +$90 million
Replace UH-60L with UH-60M: +$200 million
Price per Regiment: $3.03 billion
16 Regiments: $48.48 billion
REINFORCED AIRBORNE BRIGADE PACKAGE
*Replace M119A1 with LFH-155: +$20 million
Price per Brigade: $520 million
16 Brigades: $8.32 billion
CORPS HEAVY ARTILLERY BRIGADE PACKAGE
Replace M2001A1 Crusader with M109A5: -$130 million
Replace M577A3 with M4 C2V: +$84 million
Price per Brigade: $604 million
10 Brigades: $6.04 billion
CORPS ENGINEER BRIGADE PACKAGE
Replace Iron Cheetah AVLB with M60 AVLB: -$160 million
Replace M577A3 with M4 C2V: +$25 million
Price per Brigade: $1.115 billion
20 Brigades: $22.3 billion
CORPS CHEMICAL BRIGADE PACKAGE
Replace M577A3 with M4 C2V: +$5 million
Price per Brigade: $405 million
10 Brigades: $4.05 billion
COMBAT ENGINEER BRIGADE PACKAGE
Replace Iron Cheetah AVLB with M60 AVLB: -$120 million
Replace M577A3 with M4 C2V: +$40 million
Price per Brigade: $720 million
40 Brigades: $28.8 billion
Total cost: $1,510.71 billion
We apologize for your patience as it took some time to plan and initiate such a massive undertaking. However, your request has been approved, and due to the ease of manufacture of most components, we expect that we can have everything delivered within 18 NS years.
We once again apologize for the delay, and look forward to additional dealings in the future.
The Beltway
27-02-2006, 22:17
To Clan Smoke Jaguar Military Industries -
In light of our war with Gilabad, and given that the Sixth Airborne Division, regardless of whether or not it survives, is likely to be ruined by the battle it is fighting in, we would like to purchase the following, to create a reasonable fascimile of the Sixth:
One Reinforced Armored Brigade - Replace Iron Cheetah Export with M1A2 Abrams; Replace M2001A1 Crusader with M109A6 Paladin; Replace Mist Lynx Export with Nova Cat Export: $1.925 billion US
Two Reinforced Airborne Brigades: $1 billion US total
Two Light Division Aviation Brigades - Replace AH-1W Supercobra with OH-58D Kiowa Warrior: $3.4 billion US total
The final total comes to $6.325 billion US; we would like to split the bill into three annual payments, given that we are at war and thus need to spend our defence budget on the war. Thank you.
Sincerely,
Benjamin Cardin, Defence Minister of The Beltway
Clan Smoke Jaguar
27-02-2006, 23:59
To Clan Smoke Jaguar Military Industries -
In light of our war with Gilabad, and given that the Sixth Airborne Division, regardless of whether or not it survives, is likely to be ruined by the battle it is fighting in, we would like to purchase the following, to create a reasonable fascimile of the Sixth:
One Reinforced Armored Brigade - Replace Iron Cheetah Export with M1A2 Abrams; Replace M2001A1 Crusader with M109A6 Paladin; Replace Mist Lynx Export with Nova Cat Export: $1.925 billion US
Two Reinforced Airborne Brigades: $1 billion US total
Two Light Division Aviation Brigades - Replace AH-1W Supercobra with OH-58D Kiowa Warrior: $3.4 billion US total
The final total comes to $6.325 billion US; we would like to split the bill into three annual payments, given that we are at war and thus need to spend our defence budget on the war. Thank you.
Sincerely,
Benjamin Cardin, Defence Minister of The Beltway
CSJMI is honored that you have chosen us as a supplier in this time of need, and has wholeheartedly approved your request. We anticipate the entirety of this request to be filled within 6 NS months.
To: CSM
From: Holy Republic of Hawdawg
Re: Order
We are developing plans for a rapid deployment force within our region and would like to purchase the following units. Please be advised we substituted the Kit Fox II upgrade for the Kit Fox III and tabulated the balance in the price. We need (25) Reinforced Airmobile Packages for a total of $171 Billion with the attached modifications. We also need (25) Light Armored Cavalry Regiment Packages for a total of $75.1 Billion with the attached modifications.
Total bill for this order is $246.1 Billion USD. Funds will be wired pending confirmation.
Sincerely,
Rear Admiral Joseph Hines
Holy Republic of Hawdawg, DoD
REINFORCED AIRMOBILE BRIGADE PACKAGE
Role: Light force with extreme tactical mobility. The only reinforced combat brigade provided with it’s own air assets provided. Smaller alternative to Airmobile Division. It should be noted that this force has sufficient airlift capability for the entire unit.
Cost: $4.5 billion standard, $5.75 billion max (MFN & NGS only), $3.4 billion min
*Replace M119A1 with M2015 Lancer: +$25 million
*Replace AH-64D with AH-93C: +$425 million
*Replace CH-47F with CH-61 Atlas: +$1 billion
*Replace UH-60L with UH-102 Kestrel: +$890 million
6.84 Billion Each
LIGHT ARMORED CAVALRY REGIMENT PACKAGE
Role: To provide screening and reconnaissance for lighter formations which is capable of rapid deployment.
Cost: $2.1 billion standard, $3.6 billion max (MFN & NGS only), $1.5 billion min
*Replace Kit Fox Export with Kit Fox III: +$74 million
*Replace Stormcrow Export variants with Stormcrow II: +$110 million
*Replace M113A3 variants with M113A4: +$25 million
*Replace M119A1 with M2015 Lancer: +$25 million
Replace AH-1W with RAH-66A Comanche: +$320 million
*Replace UH-60L with UH-102 Kestrel: +$350 million
3.004 Billion Each
Clan Smoke Jaguar
31-05-2006, 06:53
To: CSM
From: Holy Republic of Hawdawg
Re: Order
We are developing plans for a rapid deployment force within our region and would like to purchase the following units. Please be advised we substituted the Kit Fox II upgrade for the Kit Fox III and tabulated the balance in the price. We need (25) Reinforced Airmobile Packages for a total of $171 Billion with the attached modifications. We also need (25) Light Armored Cavalry Regiment Packages for a total of $75.1 Billion with the attached modifications.
Total bill for this order is $246.1 Billion USD. Funds will be wired pending confirmation.
Sincerely,
Rear Admiral Joseph Hines
Holy Republic of Hawdawg, DoD
REINFORCED AIRMOBILE BRIGADE PACKAGE
Role: Light force with extreme tactical mobility. The only reinforced combat brigade provided with it’s own air assets provided. Smaller alternative to Airmobile Division. It should be noted that this force has sufficient airlift capability for the entire unit.
Cost: $4.5 billion standard, $5.75 billion max (MFN & NGS only), $3.4 billion min
*Replace M119A1 with M2015 Lancer: +$25 million
*Replace AH-64D with AH-93C: +$425 million
*Replace CH-47F with CH-61 Atlas: +$1 billion
*Replace UH-60L with UH-102 Kestrel: +$890 million
6.84 Billion Each
LIGHT ARMORED CAVALRY REGIMENT PACKAGE
Role: To provide screening and reconnaissance for lighter formations which is capable of rapid deployment.
Cost: $2.1 billion standard, $3.6 billion max (MFN & NGS only), $1.5 billion min
*Replace Kit Fox Export with Kit Fox III: +$74 million
*Replace Stormcrow Export variants with Stormcrow II: +$110 million
*Replace M113A3 variants with M113A4: +$25 million
*Replace M119A1 with M2015 Lancer: +$25 million
Replace AH-1W with RAH-66A Comanche: +$320 million
*Replace UH-60L with UH-102 Kestrel: +$350 million
3.004 Billion Each
OOC: sorry about that. I was offline for a few days there.
IC:
CSJMI is pleased to announce that the Hawdawg request has been approved, and it is expected that the last unit will be delivered within 6 NS years.
imported_Illior
04-06-2006, 21:19
Contract if you're interested (http://forums2.jolt.co.uk/showthread.php?t=486077)
Spizania
05-06-2006, 09:57
ooc: CSJ, would you mind doing me a favour and finding the price of the two versions of the B1 Centauro? I cant find them anywhere?
Clan Smoke Jaguar
12-06-2006, 07:47
ooc: CSJ, would you mind doing me a favour and finding the price of the two versions of the B1 Centauro? I cant find them anywhere?
OOC: To be honest, that makes two of us :(
I've spent quite a bit of time trying to look that one up, but never got much of a cost. Several other Italian ones (among other countries) are very hard to get as well.
The Commonwealth of Hydac would like to know the price of substituting
M2A3 Bradley for the Mist Lynx in the Mechanized Infantry and Armored Brigade Packages.
Commonwealth of Hydac
Ministry of Defense
Activision
23-08-2006, 01:55
To: CSM
From:The Dictatorship of Activision
My Nation was started a few days ago and "Holy Republic of Hawdawg" recommended you...but as we start I need the following for a cost of $500 million...
REINFORCED AIRBORNE BRIGADE PACKAGE
Role: Very light force with excellent strategic, but minimal tactical mobility. Smaller alternative to Airborne Division.
Cost: $500 million standard, $525 million max (MFN & NGS only), $498 million min
Includes Vehicles and Equipment for the following:
1 Brigade HHC (Headquarters & Headquarters Company)
3 Airborne Infantry Battalion
1 Artillery Battalion
1 Air Defense Battalion
1 Engineer Battalion
1 Intelligence Company
1 Support Battalion
Total Personnel: 3721
Major Units:
18xM119A1 Light Towed Howitzer
36xAvenger FAADV
510xHMMWV
290xTruck
Armory complete with 3000xG36A5 Assault Rifle, 800xNeostead Combat Shotgun, 200xM-29 OICW, 70xMSG-90 DMR, 24xM40A1 Sniper Rifle, 6xM82A1 Heavy Sniper Rifle, 2xIWS-2000 Anti-Materiel Rifle, 200xM249A3 SAW/LMG, 150xMG-3 GPMG, 40xM2HB HMG, 40xMk.19 AGL, 50xJavelin Infantry ATGM launcher, 100xStinger Launcher, 800xM136 AT4 LAW, 18x82mm Mortar, 36x60mm Mortar, 2000xCougar Pistol, 500xMP-7 PDW
Complete equipment for infantry, including BDUs, NBC protection gear, and 400 Land Warrior Systems (1 squad per infantry platoon).
money wired pending confirmation of the order
Sincerely,
Chairmen of the Defense
Clan Smoke Jaguar
24-08-2006, 03:21
To: CSM
From:The Dictatorship of Activision
My Nation was started a few days ago and "Holy Republic of Hawdawg" recommended you...but as we start I need the following for a cost of $500 million...
REINFORCED AIRBORNE BRIGADE PACKAGE
Role: Very light force with excellent strategic, but minimal tactical mobility. Smaller alternative to Airborne Division.
Cost: $500 million standard, $525 million max (MFN & NGS only), $498 million min
Includes Vehicles and Equipment for the following:
1 Brigade HHC (Headquarters & Headquarters Company)
3 Airborne Infantry Battalion
1 Artillery Battalion
1 Air Defense Battalion
1 Engineer Battalion
1 Intelligence Company
1 Support Battalion
Total Personnel: 3721
Major Units:
18xM119A1 Light Towed Howitzer
36xAvenger FAADV
510xHMMWV
290xTruck
Armory complete with 3000xG36A5 Assault Rifle, 800xNeostead Combat Shotgun, 200xM-29 OICW, 70xMSG-90 DMR, 24xM40A1 Sniper Rifle, 6xM82A1 Heavy Sniper Rifle, 2xIWS-2000 Anti-Materiel Rifle, 200xM249A3 SAW/LMG, 150xMG-3 GPMG, 40xM2HB HMG, 40xMk.19 AGL, 50xJavelin Infantry ATGM launcher, 100xStinger Launcher, 800xM136 AT4 LAW, 18x82mm Mortar, 36x60mm Mortar, 2000xCougar Pistol, 500xMP-7 PDW
Complete equipment for infantry, including BDUs, NBC protection gear, and 400 Land Warrior Systems (1 squad per infantry platoon).
money wired pending confirmation of the order
Sincerely,
Chairmen of the Defense
CSJMI is pleased to announce that your request has been approved, and delivery of the last shipment is expected within 3 NS months.
Activision
28-08-2006, 01:23
To: CSM
From:The Dictatorship of Activision
In Times of need it seems my nation will need the following for the cost of $3.25 Billion
AIRBORNE INFANTRY DIVISION PACKAGE
Role: Light infantry formation with exceptional strategic mobility. Excellent as a rapid deployment unit, and can be deployed deep behind enemy lines. Lacks the tactical mobility and firepower of Mechanized Airborne Division, but more effective in restricted terrain and much cheaper to equip, operate, and maintain.
Cost: $3.25 billion standard, $6.3 billion max (MFN & NGS only), $2.5 billion min
Includes Vehicles and equipment for completely outfitting:
1 Division HQ, 1 Signal Bn, 1 Intelligence/Electronic Warfare Bn, 1 Recon Bn, 1 Anti-Tank Bn, 1 Divisional Band, 1 MP Company, 1 Chemical Warfare Company
3 Combat Brigade (total of 9 Airmobile Infantry Bn)
1 Artillery Brigade (3 TH Bn & 1 Light MLRS Bn)
1 Aviation Brigade (3 Attack Helicopter Bn, 1 Support Helicopter Bn, & 1 Air Recon (Cav) Squadron)
1 Engineer Brigade (3 Light Engineer Bn)
1 Air Defense Brigade (2 Forward Air Defense Bn, 1 Medium Air Defense Bn)
1 Support Brigade (1 Main Support Bn, 3 Forward Support Bn, 1 Medical Bn)
1 Intel & Electronic Warfare Bn
Total Personnel: 18,770
Major Equipment:
58xLOSAT
66xM981 FISTV
54xM119A1 Light Towed Howitzer
18xHIMARS
60x120mm Mortar
18xM9 ACE
2xM88 ARV
6xM93A1 Fox NBCR
90xAvenger FAADV
36xCLAWS Air Defense Vehicle
72xAH-1W Cobra Attack Helicopter
38xUH-60L Black Hawk Utility Helicopter
24xOH-58D Kiowa Recon/Light Attack Helicopter
4xEH-60 Quick Fix EW Helicopter
1900xAssorted HMMWV
1250xAssorted Truck
Armory complete with 12,000xG36A5 Assault Rifle, 3000xNeostead Combat Shotgun, 700xM-29 OICW, 200xMSG-90 DMR, 72xM40A1 Sniper Rifle, 18xM82A1 Heavy Sniper Rifle, 6xIWS-2000 Anti-Materiel Rifle, 900xM249A3 SAW/LMG, 500xMG-3 GPMG, 100xM2HB HMG, 100xMk.19 AGL, 175xJavelin Infantry ATGM launcher, 300xStinger Launcher, 2000xM136 AT4 LAW, 54x82mm Mortar, 108x60mm Mortar, 12,000xCougar Pistol, 5000xMP-7 PDW
Complete equipment for infantry, including BDUs, NBC protection gear, and 1200 Land Warrior Systems (1 squad per infantry platoon).
money wired pending confirmation of the order
Sincerely,
Chairmen of the Defense
Clan Smoke Jaguar
31-08-2006, 17:31
To: CSM
From:The Dictatorship of Activision
In Times of need it seems my nation will need the following for the cost of $3.25 Billion
AIRBORNE INFANTRY DIVISION PACKAGE
Role: Light infantry formation with exceptional strategic mobility. Excellent as a rapid deployment unit, and can be deployed deep behind enemy lines. Lacks the tactical mobility and firepower of Mechanized Airborne Division, but more effective in restricted terrain and much cheaper to equip, operate, and maintain.
Cost: $3.25 billion standard, $6.3 billion max (MFN & NGS only), $2.5 billion min
Includes Vehicles and equipment for completely outfitting:
1 Division HQ, 1 Signal Bn, 1 Intelligence/Electronic Warfare Bn, 1 Recon Bn, 1 Anti-Tank Bn, 1 Divisional Band, 1 MP Company, 1 Chemical Warfare Company
3 Combat Brigade (total of 9 Airmobile Infantry Bn)
1 Artillery Brigade (3 TH Bn & 1 Light MLRS Bn)
1 Aviation Brigade (3 Attack Helicopter Bn, 1 Support Helicopter Bn, & 1 Air Recon (Cav) Squadron)
1 Engineer Brigade (3 Light Engineer Bn)
1 Air Defense Brigade (2 Forward Air Defense Bn, 1 Medium Air Defense Bn)
1 Support Brigade (1 Main Support Bn, 3 Forward Support Bn, 1 Medical Bn)
1 Intel & Electronic Warfare Bn
Total Personnel: 18,770
Major Equipment:
58xLOSAT
66xM981 FISTV
54xM119A1 Light Towed Howitzer
18xHIMARS
60x120mm Mortar
18xM9 ACE
2xM88 ARV
6xM93A1 Fox NBCR
90xAvenger FAADV
36xCLAWS Air Defense Vehicle
72xAH-1W Cobra Attack Helicopter
38xUH-60L Black Hawk Utility Helicopter
24xOH-58D Kiowa Recon/Light Attack Helicopter
4xEH-60 Quick Fix EW Helicopter
1900xAssorted HMMWV
1250xAssorted Truck
Armory complete with 12,000xG36A5 Assault Rifle, 3000xNeostead Combat Shotgun, 700xM-29 OICW, 200xMSG-90 DMR, 72xM40A1 Sniper Rifle, 18xM82A1 Heavy Sniper Rifle, 6xIWS-2000 Anti-Materiel Rifle, 900xM249A3 SAW/LMG, 500xMG-3 GPMG, 100xM2HB HMG, 100xMk.19 AGL, 175xJavelin Infantry ATGM launcher, 300xStinger Launcher, 2000xM136 AT4 LAW, 54x82mm Mortar, 108x60mm Mortar, 12,000xCougar Pistol, 5000xMP-7 PDW
Complete equipment for infantry, including BDUs, NBC protection gear, and 1200 Land Warrior Systems (1 squad per infantry platoon).
money wired pending confirmation of the order
Sincerely,
Chairmen of the Defense
CSJMI is pleased to announce that your request has been approved, and that we anticipate delivery of the last shipment within 12 NS months.
Robert Scott The 1st
06-12-2006, 02:54
Hello I am a newer nation and have heard of you from Activision
ARMORED DIVISION PACKAGE
Role: Integrated heavy combat and maneuver force for engaging and destroying enemy formations, including spearheading attacks or mobile defenses, and for exploiting breaches.
Cost: $9 billion standard, $13 billion max (MFN & NGS only), $5.35 billion min
Includes Vehicles and equipment for completely outfitting:
1 Division HQ, 1 Signal Bn, 1 Intelligence/Electronic Warfare Bn, 1 Recon Bn, 1 Divisional Band, 1 MP Company, 1 Chemical Warfare Company
3 Combat Brigade (total of 4 Mechanized Infantry Bn & 5 Armored Bn)
1 Artillery Brigade (3 SPG Bn & 1 MLRS Bn)
1 Aviation Brigade (2 Attack Helicopter Bn, 1 Support Helicopter Bn, & 1 Armored & Air Cavalry Squadron)
1 Engineer Brigade (3 Combat Engineer Bn)
1 Air Defense Brigade (2 Forward Air Defense Bn, 1 Medium Air Defense Bn)
1 Support Brigade (1 Main Support Bn, 3 Forward Support Bn, 1 Medical Bn)
Total Personnel: 19,567
LIGHT MECHANIZED INFANTRY DIVISION PACKAGE
Role: Same as light armored division, but with greater emphasis on infantry assets making it more suitable in restricted terrain.
Cost: $8.5 billion standard, $10.75 billion max (MFN & NGS only), $6.75 billion min
Includes Vehicles and equipment for completely outfitting:
1 Division HQ, 1 Signal Bn, 1 Intelligence/Electronic Warfare Bn, 1 Recon Bn, 1 Assault Gun Bn, 1 Divisional Band, 1 MP Company, 1 Chemical Warfare Company
3 Combat Brigade (total of 5 Mechanized Infantry Bn & 4 Armored Bn)
1 Artillery Brigade (3 SPG Bn & 1 MLRS Bn)
1 Aviation Brigade (2 Attack Helicopter Bn, 1 Support Helicopter Bn, & 1 Armored & Air Cavalry Squadron)
1 Engineer Brigade (3 Combat Engineer Bn)
1 Air Defense Brigade (2 Forward Air Defense Bn, 1 Medium Air Defense Bn)
1 Support Brigade (1 Main Support Bn, 3 Forward Support Bn, 1 Medical Bn)
Total Personnel: 21,745
MECHANIZED AIRBORNE DIVISION PACKAGE
Role: Light, airdropable mechanized force for rapid deployment and airborne operations behind enemy lines. Possesses greater firepower and tactical mobility than other airborne forces, but lacks the combat power of truly heavy divisions.
Cost: $6 billion standard, $9.6 billion max (MFN & NGS only), $5.3 billion min
Includes Vehicles and equipment for completely outfitting:
1 Division HQ, 1 Signal Bn, 1 Intelligence/Electronic Warfare Bn, 1 Recon Bn, 1 Anti-Tank Bn, 1 Divisional Band, 1 MP Company, 1 Chemical Warfare Company
3 Combat Brigade (total of 6 Airborne Mechanized Infantry Bn & 3 Airborne Armored Bn)
1 Artillery Brigade (3 TH Bn & 1 Light MLRS Bn)
1 Aviation Brigade (3 Attack Helicopter Bn, 1 Support Helicopter Bn, & 1 Armored & Air Cavalry Squadron)
1 Engineer Brigade (3 Light Engineer Bn)
1 Air Defense Brigade (2 Forward Air Defense Bn, 1 Medium Air Defense Bn)
1 Support Brigade (1 Main Support Bn, 3 Forward Support Bn, 1 Medical Bn)
1 Intel & Electronic Warfare Bn
Total Personnel: 19,308
REINFORCED ARMORED BRIGADE PACKAGE (Brigade Combat Team)
Role: Heavy combat brigade with integral support assets. Fills a similar role to the Armored Division, but at a smaller level.
Cost: $2 billion standard, $2.6 billion max (MFN & NGS only), $1.1 billion min
Includes Vehicles and Equipment for the following:
1 Brigade HHC (Headquarters & Headquarters Company)
2 Tank Battalion
1 Mechanized Infantry Battalion
1 Recon Company
1 Artillery Battalion
1 Air Defense Battalion
1 Engineer Battalion
1 Intelligence Company
1 Support Battalion
Total Personnel: 4329
My total should come to 25.5 Bilion dollars
Hopefully you could do this for me. The money will be wired to you apon arrvil if possible.
Thank you
Robert Scott The 1st Government
Activision
08-12-2006, 15:29
TO:CSJMI
FROM:ACTIVISION
In times of need we need the following.
ARMORED DIVISION PACKAGE
Role: Integrated heavy combat and maneuver force for engaging and destroying enemy formations, including spearheading attacks or mobile defenses, and for exploiting breaches.
Cost: $9 billion standard, $13 billion max (MFN & NGS only), $5.35 billion min
Includes Vehicles and equipment for completely outfitting:
1 Division HQ, 1 Signal Bn, 1 Intelligence/Electronic Warfare Bn, 1 Recon Bn, 1 Divisional Band, 1 MP Company, 1 Chemical Warfare Company
3 Combat Brigade (total of 4 Mechanized Infantry Bn & 5 Armored Bn)
1 Artillery Brigade (3 SPG Bn & 1 MLRS Bn)
1 Aviation Brigade (2 Attack Helicopter Bn, 1 Support Helicopter Bn, & 1 Armored & Air Cavalry Squadron)
1 Engineer Brigade (3 Combat Engineer Bn)
1 Air Defense Brigade (2 Forward Air Defense Bn, 1 Medium Air Defense Bn)
1 Support Brigade (1 Main Support Bn, 3 Forward Support Bn, 1 Medical Bn)
Total Personnel: 19,567
LIGHT MECHANIZED INFANTRY DIVISION PACKAGE
Role: Same as light armored division, but with greater emphasis on infantry assets making it more suitable in restricted terrain.
Cost: $8.5 billion standard, $10.75 billion max (MFN & NGS only), $6.75 billion min
Includes Vehicles and equipment for completely outfitting:
1 Division HQ, 1 Signal Bn, 1 Intelligence/Electronic Warfare Bn, 1 Recon Bn, 1 Assault Gun Bn, 1 Divisional Band, 1 MP Company, 1 Chemical Warfare Company
3 Combat Brigade (total of 5 Mechanized Infantry Bn & 4 Armored Bn)
1 Artillery Brigade (3 SPG Bn & 1 MLRS Bn)
1 Aviation Brigade (2 Attack Helicopter Bn, 1 Support Helicopter Bn, & 1 Armored & Air Cavalry Squadron)
1 Engineer Brigade (3 Combat Engineer Bn)
1 Air Defense Brigade (2 Forward Air Defense Bn, 1 Medium Air Defense Bn)
1 Support Brigade (1 Main Support Bn, 3 Forward Support Bn, 1 Medical Bn)
Total Personnel: 21,745
MECHANIZED AIRBORNE DIVISION PACKAGE
Role: Light, airdropable mechanized force for rapid deployment and airborne operations behind enemy lines. Possesses greater firepower and tactical mobility than other airborne forces, but lacks the combat power of truly heavy divisions.
Cost: $6 billion standard, $9.6 billion max (MFN & NGS only), $5.3 billion min
Includes Vehicles and equipment for completely outfitting:
1 Division HQ, 1 Signal Bn, 1 Intelligence/Electronic Warfare Bn, 1 Recon Bn, 1 Anti-Tank Bn, 1 Divisional Band, 1 MP Company, 1 Chemical Warfare Company
3 Combat Brigade (total of 6 Airborne Mechanized Infantry Bn & 3 Airborne Armored Bn)
1 Artillery Brigade (3 TH Bn & 1 Light MLRS Bn)
1 Aviation Brigade (3 Attack Helicopter Bn, 1 Support Helicopter Bn, & 1 Armored & Air Cavalry Squadron)
1 Engineer Brigade (3 Light Engineer Bn)
1 Air Defense Brigade (2 Forward Air Defense Bn, 1 Medium Air Defense Bn)
1 Support Brigade (1 Main Support Bn, 3 Forward Support Bn, 1 Medical Bn)
1 Intel & Electronic Warfare Bn
Total Personnel: 19,308
REINFORCED ARMORED BRIGADE PACKAGE (Brigade Combat Team)
Role: Heavy combat brigade with integral support assets. Fills a similar role to the Armored Division, but at a smaller level.
Cost: $2 billion standard, $2.6 billion max (MFN & NGS only), $1.1 billion min
Includes Vehicles and Equipment for the following:
1 Brigade HHC (Headquarters & Headquarters Company)
2 Tank Battalion
1 Mechanized Infantry Battalion
1 Recon Company
1 Artillery Battalion
1 Air Defense Battalion
1 Engineer Battalion
1 Intelligence Company
1 Support Battalion
Total Personnel: 4329
x2 So this should come to a coast of $51Billion Money wired pending confermation
Activision
Robert Scott The 1st
08-12-2006, 22:58
URBAN COMBAT DIVISION PACKAGE
Role: Infantry-heavy mechanized formation specifically equipped for engaging the enemy in urban and other very restricted environments. Systems tend to be more survivable at the cost of tactical mobility.
Cost: $9 billion standard, $12.5 billion max (MFN & NGS only), $7 billion min
Includes Vehicles and equipment for completely outfitting:
1 Division HQ, 1 Signal Bn, 1 Intelligence/Electronic Warfare Bn, 1 Recon Bn, 1 Divisional Band, 1 MP Company, 1 Chemical Warfare Company
3 Combat Brigade (total of 6 Mechanized Infantry Bn & 3 Armored Bn)
1 Artillery Brigade (3 SPG Bn & 1 MLRS Bn)
1 Aviation Brigade (2 Attack Helicopter Bn, 1 Support Helicopter Bn, & 1 Armored & Air Cavalry Squadron)
1 Engineer Brigade (3 Combat Engineer Bn)
1 Air Defense Brigade (2 Forward Air Defense Bn, 1 Medium Air Defense Bn)
1 Support Brigade (1 Main Support Bn, 3 Forward Support Bn, 1 Medical Bn)
Total Personnel: 20,109
Major Equipment:
174xMerkava 4 MBT
27xM1A2 Abrams MBT
367xNova Cat Export IFV
41xNova Cat Export CFV
54xM2001A1 Crusader SPG
18xM270A1 MLRS
60xM1064 Self-Propelled Mortar Carrier
66xNova Cat Export FISTV
314xM113A3 APC
211xM577A3 CPV
37xKodiak Armored Breaching Vehicle (IC Chassis)
36xM946 Combat Engineering Vehicle (IC Chassis)
72xM9 Armored Combat Earthmover
84xM88A2 Hercules Armored Recovery Vehicle
18xM93A1 Fox NBC Recon Vehicle
18xVolcano Mine Dispenser
36xMongoose Mine-Clearing Launcher
36xIron Cheetah AVLB
72xMist Lynx Linebacker Export FAADV
54xAvenger FAADV
36xCLAWS Air Defense Vehicle
48xAH-64D Apache Attack Helicopter
32xUH-60L Black Hawk Utility Helicopter
16xOH-58D Kiowa Recon/Light Attack Helicopter
3xEH-60 Quick Fix EW Helicopter
1600xAssorted HMMWV
2100xAssorted Truck
Armory complete with 12,000xG36A5 Assault Rifle, 3000xNeostead Combat Shotgun, 700xM-29 OICW, 200xMSG-90 DMR, 72xM40A1 Sniper Rifle, 18xM82A1 Heavy Sniper Rifle, 6xIWS-2000 Anti-Materiel Rifle, 600xM249A3 SAW/LMG, 300xMG-3 GPMG, 50xM2HB HMG, 50xMk.19 AGL, 75xJavelin Infantry ATGM launcher, 300xStinger Launcher, 1500xM136 AT4 LAW, 12,000xCougar Pistol, 5000xMP-7 PDW
Complete equipment for infantry, including BDUs, NBC protection gear, and 900 Land Warrior Systems (1 squad per infantry platoon).
REINFORCED URBAN COMBAT BRIGADE PACKAGE (Brigade Combat Team)
Role: Reinforced brigade for operations in urban or restricted terrain. Similar in role to Urban Combat Division, but with proportionately greater infantry assets.
Cost: $2.5 billion standard, $3.25 billion max (MFN & NGS only), $2.2 billion min
Includes Vehicles and Equipment for the following:
1 Brigade HHC (Headquarters & Headquarters Company)
1 Tank Battalion
3 Mechanized Infantry Battalion
1 Recon Company
1 Artillery Battalion
1 Air Defense Battalion
1 Engineer Battalion
1 Intelligence Company
1 Support Battalion
Total Personnel: 5535
Major Units:
58xMerkava 4 MBT
183xNova Cat Export IFV
18xM2001A1 Crusader SPG
24xM1064 Self-Propelled Mortar Carrier
25xNova Cat Export FISTV
146xM113A3 APC
54xM577A3 CPV
12xKodiak Armored Breaching Vehicle (IC Chassis)
12xM946 Combat Engineering Vehicle (IC Chassis)
12xM9 Armored Combat Earthmover
38xM88A2 Hercules Armored Recovery Vehicle
6xVolcano Mine Dispenser
12xMongoose Mine-Clearing Launcher
12xIron Cheetah AVLB
36xMist Lynx Linebacker Export FAADS
18xAvenger FAADS
410xHMMWV
538xTruck
Armory complete with 4000xG36A5 Assault Rifle, 1500xNeostead Combat Shotgun, 300xM-29 OICW, 85xMSG-90 DMR, 32xM40A1 Sniper Rifle, 8xM82A1 Heavy Sniper Rifle, 3xIWS-2000 Anti-Materiel Rifle, 250xM249A3 SAW/LMG, 120xMG-3 GPMG, 22xM2HB HMG, 22xMk.19 AGL, 30xJavelin Infantry ATGM launcher, 120xStinger Launcher, 650xM136 AT4 LAW, 400xCougar Pistol, 1800xMP-7 PDW
Complete equipment for infantry, including BDUs, NBC protection gear, and 400 Land Warrior Systems (1 squad per infantry platoon).
REINFORCED AIRMOBILE BRIGADE PACKAGE
Role: Light force with extreme tactical mobility. The only reinforced combat brigade provided with it’s own air assets provided. Smaller alternative to Airmobile Division. It should be noted that this force has sufficient airlift capability for the entire unit.
Cost: $4.5 billion standard, $5.75 billion max (MFN & NGS only), $3.4 billion min
Includes Vehicles and Equipment for the following:
1 Brigade HHC (Headquarters & Headquarters Company)
3 Airmobile Infantry Battalion
1 Artillery Battalion
1 Air Defense Battalion
1 Attack Helicopter Battalion
1 Heavy Lift Helicopter Battalion
1 Command Helicopter Battalion
1 Engineer Battalion (367, 104 trk, 54 HMMWV)
1 Intelligence Company (129)
1 Support Battalion
Total Personnel: 4712
Major Units:
18xM119A1 Light Towed Howitzer
36xAvenger FAADV
24xAH-64D Apache Attack Helicopter
48xCH-47F Chinook Cargo Helicopter
38xUH-60L Black Hawk Utility Helicopter
3xEH-60 Quick Fix EW Helicopter
600xHMMWV
450xTruck
To: CSJMI
From: Epollo
ARMORED DIVISION PACKAGE
Role: Integrated heavy combat and maneuver force for engaging and destroying enemy formations, including spearheading attacks or mobile defenses, and for exploiting breaches.
Cost: $9 billion standard, $13 billion max (MFN & NGS only), $5.35 billion min
Includes Vehicles and equipment for completely outfitting:
1 Division HQ, 1 Signal Bn, 1 Intelligence/Electronic Warfare Bn, 1 Recon Bn, 1 Divisional Band, 1 MP Company, 1 Chemical Warfare Company
3 Combat Brigade (total of 4 Mechanized Infantry Bn & 5 Armored Bn)
1 Artillery Brigade (3 SPG Bn & 1 MLRS Bn)
1 Aviation Brigade (2 Attack Helicopter Bn, 1 Support Helicopter Bn, & 1 Armored & Air Cavalry Squadron)
1 Engineer Brigade (3 Combat Engineer Bn)
1 Air Defense Brigade (2 Forward Air Defense Bn, 1 Medium Air Defense Bn)
1 Support Brigade (1 Main Support Bn, 3 Forward Support Bn, 1 Medical Bn)
Total Personnel: 19,567
Major Equipment:
290xIron Cheetah Export MBT
27xM1A2 Abrams MBT
251xMist Lynx Export IFV
41xMist Lynx Export CFV
54xM2001A1 Crusader SPG
18xM270A1 MLRS
60xM1064 Self-Propelled Mortar Carrier
66xMist Lynx Export FISTV
258xM113A3 APC
162xM577A3 CPV
37xKodiak Armored Breaching Vehicle (IC Chassis)
36xM946 Combat Engineering Vehicle (IC Chassis)
72xM9 Armored Combat Earthmover
84xM88A2 Hercules Armored Recovery Vehicle
18xM93A1 Fox NBC Recon Vehicle
18xVolcano Mine Dispenser
36xMongoose Mine-Clearing Launcher
36xIron Cheetah AVLB
72xMist Lynx Linebacker Export FAADV
54xAvenger FAADV
36xCLAWS Air Defense Vehicle
48xAH-64D Apache Attack Helicopter
32xUH-60L Black Hawk Utility Helicopter
16xOH-58D Kiowa Recon/Light Attack Helicopter
3xEH-60 Quick Fix EW Helicopter
1800xAssorted HMMWV
2200xAssorted Truck
Armory complete with 8000xG36A5 Assault Rifle, 2000xNeostead Combat Shotgun, 500xM-29 OICW, 200xMSG-90 DMR, 72xM40A1 Sniper Rifle, 18xM82A1 Heavy Sniper Rifle, 6xIWS-2000 Anti-Materiel Rifle, 500xM249A3 SAW/LMG, 250xMG-3 GPMG, 50xM2HB HMG, 30xMk.19 AGL, 50xJavelin Infantry ATGM launcher, 300xStinger Launcher, 1000xM136 AT4 LAW, 12,000xCougar Pistol, 5000xMP-7 PDW
Complete equipment for infantry, including BDUs, NBC protection gear, and 900 Land Warrior Systems (1 squad per infantry platoon).
Coming to $9 Billion Standard.
--------------------------------------------------------------------------
URBAN COMBAT DIVISION PACKAGE
Role: Infantry-heavy mechanized formation specifically equipped for engaging the enemy in urban and other very restricted environments. Systems tend to be more survivable at the cost of tactical mobility.
Cost: $9 billion standard, $12.5 billion max (MFN & NGS only), $7 billion min
Includes Vehicles and equipment for completely outfitting:
1 Division HQ, 1 Signal Bn, 1 Intelligence/Electronic Warfare Bn, 1 Recon Bn, 1 Divisional Band, 1 MP Company, 1 Chemical Warfare Company
3 Combat Brigade (total of 6 Mechanized Infantry Bn & 3 Armored Bn)
1 Artillery Brigade (3 SPG Bn & 1 MLRS Bn)
1 Aviation Brigade (2 Attack Helicopter Bn, 1 Support Helicopter Bn, & 1 Armored & Air Cavalry Squadron)
1 Engineer Brigade (3 Combat Engineer Bn)
1 Air Defense Brigade (2 Forward Air Defense Bn, 1 Medium Air Defense Bn)
1 Support Brigade (1 Main Support Bn, 3 Forward Support Bn, 1 Medical Bn)
Total Personnel: 20,109
Major Equipment:
174xMerkava 4 MBT
27xM1A2 Abrams MBT
367xNova Cat Export IFV
41xNova Cat Export CFV
54xM2001A1 Crusader SPG
18xM270A1 MLRS
60xM1064 Self-Propelled Mortar Carrier
66xNova Cat Export FISTV
314xM113A3 APC
211xM577A3 CPV
37xKodiak Armored Breaching Vehicle (IC Chassis)
36xM946 Combat Engineering Vehicle (IC Chassis)
72xM9 Armored Combat Earthmover
84xM88A2 Hercules Armored Recovery Vehicle
18xM93A1 Fox NBC Recon Vehicle
18xVolcano Mine Dispenser
36xMongoose Mine-Clearing Launcher
36xIron Cheetah AVLB
72xMist Lynx Linebacker Export FAADV
54xAvenger FAADV
36xCLAWS Air Defense Vehicle
48xAH-64D Apache Attack Helicopter
32xUH-60L Black Hawk Utility Helicopter
16xOH-58D Kiowa Recon/Light Attack Helicopter
3xEH-60 Quick Fix EW Helicopter
1600xAssorted HMMWV
2100xAssorted Truck
Armory complete with 12,000xG36A5 Assault Rifle, 3000xNeostead Combat Shotgun, 700xM-29 OICW, 200xMSG-90 DMR, 72xM40A1 Sniper Rifle, 18xM82A1 Heavy Sniper Rifle, 6xIWS-2000 Anti-Materiel Rifle, 600xM249A3 SAW/LMG, 300xMG-3 GPMG, 50xM2HB HMG, 50xMk.19 AGL, 75xJavelin Infantry ATGM launcher, 300xStinger Launcher, 1500xM136 AT4 LAW, 12,000xCougar Pistol, 5000xMP-7 PDW
Complete equipment for infantry, including BDUs, NBC protection gear, and 900 Land Warrior Systems (1 squad per infantry platoon).
Coming to $9 Billion Standard.
--------------------------------------------------------------------------
AIRMOBILE INFANTRY DIVISION PACKAGE
Role: A light infantry force with extreme tactical mobility surpassing that of any other unit. Limited firepower, but excellent in setting up ambushes and rapidly cutting off enemy forces or striking just behind the lines. Organic airlift assets provide transport for 1 reinforced brigade
Cost: $8.3 billion standard, $14.5 billion max (MFN & NGS only), $5.75 billion min
Includes Vehicles and equipment for completely outfitting:
1 Division HQ, 1 Signal Bn, 1 Intelligence/Electronic Warfare Bn, 1 Recon Bn, 1 Anti-Tank Bn, 1 Divisional Band, 1 MP Company, 1 Chemical Warfare Company
3 Combat Brigade (total of 9 Airmobile Infantry Bn)
1 Artillery Brigade (3 TH Bn & 1 Light MLRS Bn)
1 Assault Aviation Brigade (3 Medium Lift H Bn, 1 Command H Bn, 1 Heavy Lift H Bn)
1 Aviation Brigade (3 Attack Helicopter Bn, 1 Support Helicopter Bn, & 1 Air Recon (Cav) Squadron)
1 Engineer Brigade (3 Light Engineer Bn)
1 Air Defense Brigade (2 Forward Air Defense Bn, 1 Medium Air Defense Bn)
1 Support Brigade (1 Main Support Bn, 3 Forward Support Bn, 1 Medical Bn)
1 Intel & Electronic Warfare Bn
Total Personnel: 18,770
Major Equipment:
58xLOSAT
66xM981 FISTV
54xM119A1 Light Towed Howitzer
18xHIMARS
60x120mm Mortar
18xM9 ACE
2xM88 ARV
7xM93A1 Fox NBCR
90xAvenger FAADV
36xCLAWS Air Defense Vehicle
72xAH-64D Apache Attack Helicopter
128xUH-60L Black Hawk Utility Helicopter
32xOH-58D Kiowa Recon/Light Attack Helicopter
3xEH-60 Quick Fix EW Helicopter
48xCH-47F Heavy-Lift Helicopter
2000xAssorted HMMWV
1350xAssorted Truck
Armory complete with 12,000xG36A5 Assault Rifle, 3000xNeostead Combat Shotgun, 700xM-29 OICW, 200xMSG-90 DMR, 72xM40A1 Sniper Rifle, 18xM82A1 Heavy Sniper Rifle, 6xIWS-2000 Anti-Materiel Rifle, 900xM249A3 SAW/LMG, 500xMG-3 GPMG, 100xM2HB HMG, 100xMk.19 AGL, 175xJavelin Infantry ATGM launcher, 300xStinger Launcher, 2000xM136 AT4 LAW, 54x82mm Mortar, 108x60mm Mortar, 12,000xCougar Pistol, 5000xMP-7 PDW
Complete equipment for infantry, including BDUs, NBC protection gear, and 1200 Land Warrior Systems (1 squad per infantry platoon).
Coming to $8.3 Billion Standard.
--------------------------------------------------------------------------
CORPS HEAVY ARTILLERY BRIGADE PACKAGE
Role: Corps-level self-propelled artillery unit. Has only a small number of tube systems with most of the fire power in rocket artillery.
Cost: $650 million standard, $775 million max (MFN & NGS only), $450 million min
Includes Vehicles and Equipment for the following:
1 Brigade HHB (Headquarters & Headquarters Battery)
3 Self-Propelled Artillery Battalion
Total Personnel: 1451
Major Units
18xM2001A1 Crusader
36xM270 MLRS
9xMist Lynx Export FISTV
30xM577A3
12xM88A2
110xAssorted HMMWV
179xAssorted Truck
Armory complete with: 600xG36A4, 700xCougar Pistol, 30xMSG-90, 12xMG3, 108xM136 AT4, 54xStinger Launcher, 800xMP-7
Coming to $650 Million Standard.
--------------------------------------------------------------------------
SSM BRIGADE PACKAGE
Role: Long range strategic artillery unit for deep strikes against enemy command and supply units, as well as troop concentrations.
Cost: $600 million standard, $1.2 billion max (MFN & NGS only)
Includes Vehicles and Equipment for the following:
1 Brigade HHC (Headquarters & Headquarters Company)
3 SSM Battalion
Total Personnel: 1206
Major Units
54xM51 SSM TEL
54xM52 Missile Transloader
54xM1012 Missile Transporter
17xM577A3
48xHMMWV
124xTruck
52xBGM-109 Tactical Tomahawk (454 kg)
28xBGM-109 Tactical Tomahawk (CEB)
28xBGM-109 Tactical Tomahawk (BAT)
Armory complete with: 400xG36A4, 600xCougar Pistol, 30xMSG-90, 12xMG3, 108xM136 AT4, 54xStinger Launcher, 800xMP-7
Coming to $600 Million Standard.
--------------------------------------------------------------------------
Total Coming to $27.55 Billion.
Money Wired upon confirmation.
M.Risner
Epollo