14-08-2003, 21:13
NS Shop2
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
TAX INCLUDED
Mining Shop
Mineral Concetrating Plant
http://www.kenmareresources.com/images/WetPlantBig.jpg
System limitations generally relate to capabilities of the material separating equipment.
The system can provide effective separation of heavy metals from soils and ores with a grain size of 50 micron or larger.
Soils with high clay content require additional handling prior to and during screening
http://www.enviroaccess.ca/fiches/smk2e.gif
Costs: $109 million
Dry Seperation Plant
http://www.kenmareresources.com/images/DryPlant3Big.jpg
in 2 Months:
Sand Treated (tonnes)
5,915,595
Rutile (tonnes)
5,453
Zircon (tonnes)
2,514
Cost: $127 million
Pilot Plant
http://www.wellman-process.co.uk/WPEL_files/Pyrolysis%20pilot%20plant.jpg
The Waste Isolation Pilot Plant, or WIPP, is the world's first
underground repository licensed to safely and permanently dispose of transuranic radioactive waste left from the
research and production of nuclear weapons. After more than 20 years of scientific study, public input,
and regulatory struggles, WIPP began operations on March 26, 1999.
Cost:500 million dollars
ANCUABE GRAPHITE MINE
http://www.kenmareresources.com/images/ancuabeplantbig.jpg
The orebody is a slightly inclined graphite- bearing gneiss with average grade 10% graphite.
A reserve of 1 million tonnes ore grading 10% graphite was defined by diamond drilling for the
feasibility study and further very extensive, near surface resources remain to be explored. Mining is by open pit method.
Ore processing is by flotation and grinding to produce a standard 98% Carbon graphite product.
The processing plant has a nominal capacity of 10,000 tonnes of graphite product yearly.
This is a finished product which is bagged, palletised and packed in containers.
Cost:112 million
Titanium Ore Miners
http://www.kenmareresources.com/images/drillparasol.jpg
This is great for rough areas and can reach into tight spaces. It is great but will need something
else to carry it's load other than 13 hundred pounds. Crew is 4. The problem also is that it is very slow
even when nobody is driving it. This is very easy to handle but difficult to clean and change
transmissions.
Cost: 1 million each
Offshore Oil Rig
http://www.rigwriter.com/images/rig2.gif
Comes With:
DP Drilling Rigs and Drillships
Semi-submersibles,
Jackups,
Dive Support Vessels,
Pipelay Vessels,
Cable Laying Vessels,
Seismic Survey Vessels,
FPSO's,
Offshore Supply Vessels
Anchor Handlers.
Crew: 57
Can Drill: 3,120 gallons on a bad vein, 3,630 on a good one/ In a day/ [One Drill]
Main Drills: 5
Arament: Put them on your selves
Cost: 300 Million
Land Oil Rig
http://www.cowlesgallery.com/burtynsky/oilfields6lg.jpg
Height 220 feet
width 50 feet
Lenghth [ground] 125 feet
Width [ground] 75
Pumping per day[good vein]: 1,023 gallons
Pumping per day: 730
Cost: 2 million ech.
Chemical Oil Tanker, Chassiron
http://www.conoship.com/images/vessels/tankers/charisson.jpg
Length overall 119,00 m
Length b.p. 113,68 m
Breadth 17,80 m
Depth to maindeck 9,50 m
Design draught 6,,00 m
Scantling draught 7,39 m
Corr. deadweight 9995 ton
Capacities:
Cargo tanks 100% 10135 m³
Sloptank 179 m³
Heavy fuel oil 490 m³
Ballast water 4065 m³
Note: Can carry other liquids and can be customized to fit gas.
Cost: 50 million
Oil Carrier
http://www.bjcrystal.com/_borders/oil-truck.jpg
Carries 10,000 Gallons
Takes to load and unload: 45 minutes
Cost: 100,000 ech.
CHECK OUT MY NAVAL STOREFRONT, UPDATED 12-22 (http://www.nationstates.net/forum/viewtopic.php?p=2425545#2425545)
MY INTERNATIONAL STOREFRONT, BEST PLACE FOR SMALL ARMS AND LAND VEHICLES (http://www.nationstates.net/forum/viewtopic.php?t=61301)
[b] AEROSPACE STOREFRONT, CHECK IT OUT (http://www.nationstates.net/forum/viewtopic.php?t=107157)
Central Cervises I fixed the prices so the .29% sales tax on big stores is so tax is included in the cost allready compling to Quasi Form 7, Subform C, 82-B-Stroke-6, subsection Alpha, paragraph 8 of your alliance/biz/corporation
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
TAX INCLUDED
Mining Shop
Mineral Concetrating Plant
http://www.kenmareresources.com/images/WetPlantBig.jpg
System limitations generally relate to capabilities of the material separating equipment.
The system can provide effective separation of heavy metals from soils and ores with a grain size of 50 micron or larger.
Soils with high clay content require additional handling prior to and during screening
http://www.enviroaccess.ca/fiches/smk2e.gif
Costs: $109 million
Dry Seperation Plant
http://www.kenmareresources.com/images/DryPlant3Big.jpg
in 2 Months:
Sand Treated (tonnes)
5,915,595
Rutile (tonnes)
5,453
Zircon (tonnes)
2,514
Cost: $127 million
Pilot Plant
http://www.wellman-process.co.uk/WPEL_files/Pyrolysis%20pilot%20plant.jpg
The Waste Isolation Pilot Plant, or WIPP, is the world's first
underground repository licensed to safely and permanently dispose of transuranic radioactive waste left from the
research and production of nuclear weapons. After more than 20 years of scientific study, public input,
and regulatory struggles, WIPP began operations on March 26, 1999.
Cost:500 million dollars
ANCUABE GRAPHITE MINE
http://www.kenmareresources.com/images/ancuabeplantbig.jpg
The orebody is a slightly inclined graphite- bearing gneiss with average grade 10% graphite.
A reserve of 1 million tonnes ore grading 10% graphite was defined by diamond drilling for the
feasibility study and further very extensive, near surface resources remain to be explored. Mining is by open pit method.
Ore processing is by flotation and grinding to produce a standard 98% Carbon graphite product.
The processing plant has a nominal capacity of 10,000 tonnes of graphite product yearly.
This is a finished product which is bagged, palletised and packed in containers.
Cost:112 million
Titanium Ore Miners
http://www.kenmareresources.com/images/drillparasol.jpg
This is great for rough areas and can reach into tight spaces. It is great but will need something
else to carry it's load other than 13 hundred pounds. Crew is 4. The problem also is that it is very slow
even when nobody is driving it. This is very easy to handle but difficult to clean and change
transmissions.
Cost: 1 million each
Offshore Oil Rig
http://www.rigwriter.com/images/rig2.gif
Comes With:
DP Drilling Rigs and Drillships
Semi-submersibles,
Jackups,
Dive Support Vessels,
Pipelay Vessels,
Cable Laying Vessels,
Seismic Survey Vessels,
FPSO's,
Offshore Supply Vessels
Anchor Handlers.
Crew: 57
Can Drill: 3,120 gallons on a bad vein, 3,630 on a good one/ In a day/ [One Drill]
Main Drills: 5
Arament: Put them on your selves
Cost: 300 Million
Land Oil Rig
http://www.cowlesgallery.com/burtynsky/oilfields6lg.jpg
Height 220 feet
width 50 feet
Lenghth [ground] 125 feet
Width [ground] 75
Pumping per day[good vein]: 1,023 gallons
Pumping per day: 730
Cost: 2 million ech.
Chemical Oil Tanker, Chassiron
http://www.conoship.com/images/vessels/tankers/charisson.jpg
Length overall 119,00 m
Length b.p. 113,68 m
Breadth 17,80 m
Depth to maindeck 9,50 m
Design draught 6,,00 m
Scantling draught 7,39 m
Corr. deadweight 9995 ton
Capacities:
Cargo tanks 100% 10135 m³
Sloptank 179 m³
Heavy fuel oil 490 m³
Ballast water 4065 m³
Note: Can carry other liquids and can be customized to fit gas.
Cost: 50 million
Oil Carrier
http://www.bjcrystal.com/_borders/oil-truck.jpg
Carries 10,000 Gallons
Takes to load and unload: 45 minutes
Cost: 100,000 ech.
CHECK OUT MY NAVAL STOREFRONT, UPDATED 12-22 (http://www.nationstates.net/forum/viewtopic.php?p=2425545#2425545)
MY INTERNATIONAL STOREFRONT, BEST PLACE FOR SMALL ARMS AND LAND VEHICLES (http://www.nationstates.net/forum/viewtopic.php?t=61301)
[b] AEROSPACE STOREFRONT, CHECK IT OUT (http://www.nationstates.net/forum/viewtopic.php?t=107157)
Central Cervises I fixed the prices so the .29% sales tax on big stores is so tax is included in the cost allready compling to Quasi Form 7, Subform C, 82-B-Stroke-6, subsection Alpha, paragraph 8 of your alliance/biz/corporation