NationStates Jolt Archive


ZMI "Capital Venture" class DD (open) (trade)

Zepplin Manufacturers
30-01-2005, 19:18
-Open Global Streaming Plain Text Broadcast-

ZMI is proud to announce our latest heavy industrial military product. Available for 5.3 billion rungs in vannila (present exchange rate R1=$1.54 USD) as a basic unit and at 6.9 billion rungs outfitted with ZMI weapons systems. Per unit construction time is 1.2 months with construction bays available for 38 units at present.. Construction is available at Megacity one, and in the ZMI Outzone city on Baltic Island in the Haven theatre.

All Purchase Requests Should be sent to :
Ministry of Industry, Level 39, Sector 21, Zone one, Megacity One, Earth.


Image:
http://www.deviantart.com/view/14664326/
ZMI NAVY Venture Capital Class Dreadnought

Crew:840 with ZMI systems, est at 2300 without.

Power Plant:

Two Fission reactors generating 1,430 Megawatts.

Nuclear Caterpillar Drive System.

Armour: 230mm(hull) to 120mm (superstructure) Advanced Composite Hull. Battle Ceramic, Carbon Steel, Titanium Boron Alloy.

Weapon Systems:


7 Triple barrelled 230mm conventional Turrets with independent fire control.

20 ZMI "Poleaxe" Point defence units, (Quad 20mm Auto cannon, 6 40mm fragmentary rockets in revolver launcher).

2 "Daggers Edge" 340mm deck mounted (located behind rear primary turret) Torpedo Launchers.

11 "Swords Edge" AA missile batteries.

1 Main Vertical Launch cell system (located in the prow) Ship killer, Cruise, AA, counter ballistic, Ocean Slam (cruise/torpedo system).

1 Ballistic Missile Launch Cell (behind bridge) 15 ICBM's or A-SAT missiles.

1 "Raptor" Domed 80 Megawatt Microwave laser. (located on top of bridge).


Systems of note:


Four Vectored Water Jet systems (electric turbine).

Helicopter Landing pad (one) lift system to under deck hanger (located in rear of ship. Supports 8 ZMI Gunships in Air to Ship, Air to Ground, Air to Air or Sub hunting capacity or 3 heavy transports.)

24 Multi Purpose Launch and Recovery Bays.
Each equipped with its own launch rail, and recovery crane.
Small boat launch and recovery, naval combat drone launch.

PT boat sized torpedo carrying drones equipped with 6 230mm Torpedoes in a revolver magazine, two 50. cals and a 80mm Auto Cannon.Capable of short term submergence, electric powered water jet propulsion, 430 hour power cell.
Midlonia
30-01-2005, 19:32
Ministry of Industry, Level 39, Sector 21, Zone one, Megacity One, Earth.

Requesting purchase of One "Venture Capital Class Dreadnought" and construction rights, money is in the same account as made via our last purchase.

Regards, Midlonian Diplomatic and Economic Corps.
Zepplin Manufacturers
30-01-2005, 19:39
To: Midlonian Diplomatic and Economic Corps.
From: ZMI Ministry of Industry

-Automated Industrial Zone Response System-
6.9 billion Rungs Debited to our account. Unit will be delivered to Mildonian port of Ashby-De-La-Zouch in 26 days. Unit construction rights including all systems cost at 18.9 Billion rungs. Debit Account Y/N?
Midlonia
30-01-2005, 19:55
To: ZMI Ministry of Industry
From: Midlonian Diplomatic and Economic Corps.

Account debited.

18.9 Billion "rungs" were dumped straight into the account, as they were placed there they dissappeared, whisked away to the ZMI coffeurs.
Lethislavania
30-01-2005, 22:20
Kyar Miiska glanced over at the General, eyeing the yellowed report in his hand. "Hm... It would seem you are correct; However, are these the kind you really want?"

He nodded, slowly, as though he brain was still processing the thought. The older military folk were much like this. "Yes, it is. Needed pronto."

Kyar grunted once and waived his hand, a signal for the aging general to leave.


Lethislavania would like to purchase 9 of these vessels, within the
accordance of Congress Rule 1A, stating "Ministers may perform actions
found decent and to be at the heart of Lethislavanian goals.". Therefore, we
shall send you the money as soon as possible.

Honourably yours,
Kyar Miiska
Zepplin Manufacturers
30-01-2005, 22:27
To: Kyar Miiska, Lethislavanian Government.
From: ZMI Ministry of Industry

-Automated Industrial Zone Response System-

62.1 Billion Rungs Debited to our account. Units will be delivered in 48 days to nearest Lethislavanian naval port to Baltic Island.

Have a productive day.